Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.
647 published projects6 presentation themesAtlas map modeVoice narration
1Filter projectsby sector, country, stage or programme
2Selectthe projects you want to present
3Create a showwith AID Intelligence and present full screen
The Trans-Sahara Gas Pipeline is a proposed international gas pipeline corridor intended to move Nigerian gas northward through Niger to Algeria, where it would connect to existing Mediterranean export infrastructure.…
EnergyAlgeria, Niger, NigeriaNorth Africa, West Africapap1
Nairobi - Malaba Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.02
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
Mombasa - Nairobi Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.01
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
Kampala - Kasese Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.05
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
Kasese - Mirama Hills Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.06
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
A 2x3 Highway from Abidjan to Lagos through Accra, Lome and Cotonou covering a large proportion of West Africa"’s population and linking very vibrant seaports which serve all the landlocked…
Dar es Salaam - Isaka - Mwanza Standard Gauge Railway T.08.05.01
Tanzania is constructing the high speed electric standard gauge railway line from the port of Dar es Salaam to the inland Lake Victoria (at Mwanza) (1219 Km) with a target speed…
Malaba - Kampala Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.04
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
Construction and upgrading of the approx. 2,000 km single carriageway road from Yaounde (Cameroon) to Brazzaville (Congo). In particular, this project involves the section in Cameroon, from Yaounde to the…
TransportCameroon, Republic of CongoCentral Africapap1
Upgrading of the 1,602 km of single carriageway road from Libreville (Gabon) to Brazzaville (Congo). In particular, this project involves the section in Gabon, from Libreville to the border with…
TransportGabon, Republic of CongoCentral Africapap1
Dakar - Bamako Standard Gauge Railway (Senegal section)T.13.04.01
This project covers the Senegal portion of the Dakar-Ndjamena-Djibouti Road/ Railway project. This is a multimodal transboundary transport corridor including Senegal, Mali, Burkina-Faso, Niger, Nigeria, Cameroon, Chad, Sudan, Ethiopia and Djibouti. It is…
The proposed Kaléta dam project entails the construction of a gravity dam, with a 240 MW capacity. The Kaléta site is located in Guinea, 115 km northeast of Conakry and…
This project forms part of the West Africa North Core transmission interconnector which connects the power markets of Nigeria, Niger, Burkina Faso and Benin/Togo.
The project forms part of the upgrading of the 1,200 km of narrow gauge railway between Abidjan and Ouagadougou. In particular it involves the section in Ivory Coast, from Abidjan…
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote…
Dar es Salaam New Berths Vijibweni, Mbwamaji and KunduchiT.08.04.03
This project includes development of 3 new berths on the eastern side of Dar es Salaam port, linked by a bridge south of the existing dockyard and fronting the new…
This project concerns the Sudan section of a high-voltage Ethiopia-Sudan power interconnection designed to move power from Ethiopia into Sudan and strengthen the Eastern Africa Power Pool. The existing database…
Regional Rusumo Falls Hydroelectric Power Project IIE.13.01
Regional Rusumo Falls Hydroelectric Project (RRFHP) Development Objective is to increase the supply of electricity to the national grids of Rwanda, Tanzania and Burundi. It Comprises of construction of an…
The project includes the construction of a road and rail bridge between Brazzaville in Congo and Kinshasa in the DRC. The project also includes road and rail links in both…
TransportCameroon, Democratic Republic of Congo, Gabon, Republic of CongoCentral Africapap1
The proposed Sambangalou dam project entails the construction of a gravity dam, with a 128 MW capacity, and a 3.8 km3 reservoir. The dam is located in Senegal, 930 km…
Construction of 365 km Juba-Torit-Kapoeta-Nadapal single cariageway road in South Sudan. The road links with the proposed South Sudan/Kenya OSBP project at Nadapal.
TransportKenya, South SudanEast Africa, North-Eastern AfricaIGAD
Le projet de route Ketta-Djoum consiste en sa deuxième phase au bitumage de la section Sembe (Congo)-Mintom (Cameroun). Les travaux concernent les tronçons Sembe-Souanké-Ntam(143km) au Congo et Mintom-Lele-Ntam(90km) au Cameroun,…
TransportCameroon, Republic of CongoCentral Africapap1
Widening of the road from 6m to 7m with a paved shoulder to harmonise with EAC standard. The Muyinga-Gitega road is about 104 km on the RN12. This road forms…
The project involves the construction of the Koukoutamba multi-purpose dam (previously known as Gourbassy dam) between Mali and Senegal.
A feasibility study and preliminary design for the Gourbassy Dam was completed by…
Strategically located half-way down the coast of Namibia, with direct access to principal shipping routes, Walvis Bay is a natural gateway for international trade. Walvis Bay is Namibia's largest commercial…
Egypt - Libya section of ELTAM Transmission Interconnector (Egypt part)E.09.03.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Egypt…
ZTK Transmission Interconnector (Tanzania section - Iringa to Shinyanga)E.02.03.01
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga…
ZTK Transmission Interconnector (Tanzania section - Singida to Namanga) E.02.03.01
Construction of a transmission linethat connects the power networks ofTanzania and Kenya. This projectincludes the section of 414km of400kV transmission line from Singidato Namanga via Arusha. The designcapacity is 2,000MW.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project initially included the section of 400kV, 1134km bidirectional Tanzanian section of the 2,800km ZTK…
The project involves the modernisation of the Dar es Salaam Port, including upgrade to berths 1 to 7, deepening of the harbour, improveing cargo handling and port layout.
Serenje - Nakonde Road Link 1 (Serenje - Mpika)T.06.03.01.01
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
TransportBotswana, Malawi, Namibia, Republic of Congo, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The project is part of the Inga-Cabinda-Pointe Noire transmission interconnector, linking the power systems of DRC, Angola and Congo, with a transfer capacity of 600 MW. The project involves the…
EnergyAngola, Democratic Republic of CongoCentral Africa, Southern Africapap1
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The proposed 330 kV line is approximately 300…
The Kayanza- Bugarama road is about 59 km on the RN1. It originates from Bugarama and terminates in Kayanza City. This road forms part of the trade route with Rwanda.
Nyahua-Chaya, Urambo-Kaliua, Kazirambwa-Chagu and Malagarasi-Uvinza RoadsT.08.03.16
The project involves upgrading of missing links along part of the Central Corridor of Manyoni-Itigi-Tabora-Urambo-Kaliua-Kigoma: Nyahua to Chaya (90km), Urambo to Kaliua (33km), Kazirambwa to Chagu (40km) and Malagarasi to…
Serenje - Nakonde Road Link 3 (Chinsali - Nakonde)T.06.03.01.03
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
TransportBotswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km ZTK interconnector from…
Algeria - Tunisia section of ELTAM Transmission Interconnector (Algeria part)E.09.01.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Algeria…
Libya - Tunisia section of ELTAM Transmission Interconnector (Libya part)E.09.02.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Libya…
Algeria, Niger, NigeriaNorth Africa, West Africapap1
The Trans-Sahara Gas Pipeline is a proposed international gas pipeline corridor intended to move Nigerian gas northward through Niger to Algeria, where it would connect to existing Mediterranean export infrastructure. The database contains both a regional Trans-Sahara record and a Nigeria-section record; these should be treated as related components, not independent additive projects.The project has a long history, dating back to early Nigeria-Algeria cooperation and renewed through trilateral Nigeria-Niger-Algeria ministerial processes. Recent sources report renewed agreements to update feasibility work and accelerate the project. The strategic case is gas monetisation, regional energy security and potential exports to Europe, but security, financing, reserve commitment, competing pipeline routes and energy-transition demand risks remain material.Validation note: public sources commonly cite total project costs in the USD 10-20 billion range, with recent reporting around USD 13 billion. The database capex values for ID 2004 and ID 762 should be checked to avoid double counting the regional pipeline and Nigeria section.Sources reviewed: Global Energy Monitor, Trans-Sahara Gas Pipeline, https://www.gem.wiki/Trans-Sahara_Gas_Pipeline; Pipeline Journal, Algeria, Nigeria and Niger sign agreements to advance TSGP, https://www.pipeline-journal.net/news/algeria-nigeria-niger-sign-agreements-advance-trans-saharan-gas-pipeline-project; Flyvbjerg et al., What causes cost overrun in transport infrastructure projects, https://arxiv.org/abs/1304.4476.
TransportT.05.05.01.02Nairobi - Malaba Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Nairobi to the Kenya/Uganda border at Malaba.
TransportT.05.05.01.01Mombasa - Nairobi Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Mombasa port to Nairobi in Kenya.
TransportT.05.05.01.05Kampala - Kasese Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Kampala to Kasese in Uganda.
TransportT.05.05.01.06Kasese - Mirama Hills Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Kasese in Uganda, to the border with Rwanda at Mirama Hills.
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from the Mirama Hills border (Uganda/Rwanda) to Kigali, the capital of Rwanda.
A 2x3 Highway from Abidjan to Lagos through Accra, Lome and Cotonou covering a large proportion of West Africa"’s population and linking very vibrant seaports which serve all the landlocked countries of the region being Burkina Faso, Mali and Niger. The project also includes provision for trade and transit facilitation, corridor management and the development of economic zones such as logistics centers, industrial zones, cross-border and regional markets to ensure the integration of the region and economic development.
TransportT.08.05.01Dar es Salaam - Isaka - Mwanza Standard Gauge Railway
Rwanda, Tanzania, UgandaEast Africapap1
Tanzania is constructing the high speed electric standard gauge railway line from the port of Dar es Salaam to the inland Lake Victoria (at Mwanza) (1219 Km) with a target speed for passenger trains travelling at up to 160kph and cargo trains at up to 120kph and a branch from Isaka to Rusumo connects Keza in Kigali (371 Km)
TransportT.05.05.01.04Malaba - Kampala Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from the Malaba border post (between Kenya and Uganda) to the Ugandan capital Kampala.
Construction and upgrading of the approx. 2,000 km single carriageway road from Yaounde (Cameroon) to Brazzaville (Congo). In particular, this project involves the section in Cameroon, from Yaounde to the border with Congo.
Upgrading of the 1,602 km of single carriageway road from Libreville (Gabon) to Brazzaville (Congo). In particular, this project involves the section in Gabon, from Libreville to the border with Congo.
TransportT.13.04.01Dakar - Bamako Standard Gauge Railway (Senegal section)
Burkina Faso, Mali, SenegalWest Africapap1
This project covers the Senegal portion of the Dakar-Ndjamena-Djibouti Road/ Railway project. This is a multimodal transboundary transport corridor including Senegal, Mali, Burkina-Faso, Niger, Nigeria, Cameroon, Chad, Sudan, Ethiopia and Djibouti. It is a combination of the Trans-African Highway 5 (Dakar to N’djamena) and 6 (N’djamena to Djibouti), a combined distance covered of 8,715 km.
However over time, the railway transport route between Dakar and Bamako has become degraded and and created hindrances in the international services for passenger transportation. In order to improve the competitiveness of the route, the two states financed a study in order to define the best way to finance or to participate in the funding of the Dakar- Bamako railway infrastructure upgrade.
The project will have the following components:
Rehabilitation of the platform and reconstruction of the engineering works to 22.5 tons / axle;
Railway rehabilitation (main roads and service roads)
Implementation of a train cantonment system and a telecommunications system in line with UIC railway standards;
Acquisition of rolling stock and railway equipment;
Development and renovation of station facilities.
The Dakar-Bamako Rail Project has been prioritised by the Government of Senegal as the first of three phases of the Project. It entails the rehabilitation of the existing railway network between Dakar and Bamako (1,228 km), with a total project cost of US$ 2.2 billion.
The proposed Kaléta dam project entails the construction of a gravity dam, with a 240 MW capacity. The Kaléta site is located in Guinea, 115 km northeast of Conakry and 130 km upstream of the mouth of the Konkouré River.
This project was previously part of the larger Gambia River Basin Development Organisation (OMVG) project involving the four countries, namely The Gambia, Guinea, Guinea-Bissau and Senegal. Guinea, however, decided to develop Kaléta as a stand-alone. Interconnection to other OMVG countries remains intended in future.
The project will have the following characteristics:
Storage hydropower plant with 240 MW of hydropower capacity
Net average generation: 660 GWh/year
Gravity dam with maximum height: 22 m, crest length: 1060 m, reservoir storage: 23 million m3.
This project forms part of the West Africa North Core transmission interconnector which connects the power markets of Nigeria, Niger, Burkina Faso and Benin/Togo.
The project forms part of the upgrading of the 1,200 km of narrow gauge railway between Abidjan and Ouagadougou. In particular it involves the section in Ivory Coast, from Abidjan to the border with Burkina Fasso.
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project comprises the update of project studies.
TransportT.08.04.03Dar es Salaam New Berths Vijibweni, Mbwamaji and Kunduchi
TanzaniaEast Africapap1
This project includes development of 3 new berths on the eastern side of Dar es Salaam port, linked by a bridge south of the existing dockyard and fronting the new Kigamboni city extension. The new berths will allow avoidance of access chanel limitations making it possible to handle 6th generation vessels.
This project concerns the Sudan section of a high-voltage Ethiopia-Sudan power interconnection designed to move power from Ethiopia into Sudan and strengthen the Eastern Africa Power Pool. The existing database record describes a 500 kV transmission line ending near Khartoum, with new or upgraded high-voltage substation facilities at Rabak and Jebel Aulia in Sudan and bay extensions linked to the Grand Ethiopian Renaissance area and Sudanese network nodes.The project has an important history. Ethiopia and Sudan already implemented an earlier interconnector, which the Nile Basin Initiative documents as commissioned around 2010-2013 and used to support regional power trade. That earlier success provides a technical and institutional basis for the larger 500 kV scheme, but it does not by itself validate the very high CAPEX currently stored against this record.Validation note: external sources confirm the strategic rationale and earlier Ethiopia-Sudan interconnection history, but I did not find a reliable external source confirming the current capex_cost value of 48,494 in USD million. The financial fields should therefore remain under owner validation before being used in investment material.Sources reviewed: World Bank, Regional Eastern Nile - Ethiopia-Sudan Power System Interconnector Project, https://documents.worldbank.org/en/publication/documents-reports/documentdetail/935901468201843498; Nile Basin Initiative, Ethiopia-Sudan interconnection success story, https://nilebasin.org/sites/default/files/2023-09/Ethiopia-Sudan%2520interconnection%2520success%2520story.pdf.
EnergyE.13.01Regional Rusumo Falls Hydroelectric Power Project II
Burundi, Rwanda, TanzaniaEast Africapap1
Regional Rusumo Falls Hydroelectric Project (RRFHP) Development Objective is to increase the supply of electricity to the national grids of Rwanda, Tanzania and Burundi. It Comprises of construction of an 80 MW power plant including the associated generation substation. The project is jointly financed by the Governments of Rwanda, Burundi and Tanzania with credits and grants totaling to USD 340 million equivalent for the Civil Works and Electromechanical Works. AfDB parallel-financing is associated with the transmission lines to each of the three countries at a cost of USD 121 Million. These include 220kV transmission lines double circuit running 161 km from the power plant to Gitega substation in Burundi, 119km double circuit line from the Power plant to Shango sub-station in Rwanda and 98.2 km double circuit line from the power plant to Nyakanazi sub-station in Tanzania.The project has the following components CP1 (Civil Works); CP2 (Electromechanical works); Livelihoods Restoration Program (LRP); and Local Area Development Program (LADP). Out of the USD 340 million, the budget breakdown for each of the component is as follows: (i)LADP allocation is USD 15 million (USD 5 million for each country (Burundi, Rwanda and Tanzania); (ii)LRP allocation is about USD 711,612 (only for PAPs); and (iii)The remaining is for CP1, CP2, OE, and PIU operations.The three governments mandated and entrusted Nile Basin Initiative /Nile Equatorial lakes Subsidiary Action Program Coordination Unit (NBI/NELSAP CU) to coordinate the implementation of the project. The Nile Basin Trust Fund (NBTF) financed the Feasibility and Design Studies to a tune of USD 7.72 million. The studies were carried out from 2005 and completed in 2013. The studies were undertaken by NBI/NELSAP CU. The Project was approved by the World Bank in 2014; procurement of CP1 Contractor and CP2 Contractor was started in 2015 and completed and Contracts signed on 9th November, 2016; mobilization for construction works started in December 2016/January 2017; and the project completion date is 2021.
Cameroon, Democratic Republic of Congo, Gabon, Republic of CongoCentral Africapap1
The project includes the construction of a road and rail bridge between Brazzaville in Congo and Kinshasa in the DRC. The project also includes road and rail links in both countries as well as joint border control points (One Stop Border Posts). A border control post will be located at each end of the bridge and will house border control officers. Inspections will only be conducted on one side of the river (i.e. on the departure side). The existing road infrastructure will be extended by 10km to connect the bridge to the two cities.
The railway bridge will have a total length of 1 575m and 10 bays divided as follows: 2 bays of 120m, 4 bays of 152m, 2 bays of 242m and two bays of 121.5m. The profile on the other side of the road consists of two unidirectional sidewalks with two lanes of 3m. The total width of the road, including sidewalks, is 16.24 m.
The two large cable-stayed spans (242m and 152m), located in the river along the banks, give the bridge a gateway to the capitals. The bridge will be located in Maloukou Trechot, 6km from the city of Maluku in Congo. The site is 55km from the two capitals along the river.
The bridge is part of a larger project, the Kinshasa-Ilebo railway project, which aims to improve the rail network in Africa. The larger project is expected to contribute to increased regional trade and accelerate regional integration between Central and Southern Africa. The project is expected to allow for cheaper and faster river crossing by passengers and freight. The beneficiaries of the project will therefore include the two countries whose fisci will benefit from increased trade, the increased presence of domestic and foreign companies in both countries, from private transporters and the economic and social benefits of liberated movement of both populations
The proposed Sambangalou dam project entails the construction of a gravity dam, with a 128 MW capacity, and a 3.8 km3 reservoir. The dam is located in Senegal, 930 km upstream from the mouth of the Gambia river and about 25 km south of Kédougou. The reservoir overlaps Senegal and Guinea. The project now has two components, i.e. Sambangalou Dam and an interconnection transmission line which will link the Sambangalou and Kaleta dams to the electric grid of the four member countries.
The project was formerly part of larger OMVG Energy project involving fuoir countries (with Kaleta dam in Guinea and interconnecting power grid), however it split in 2011 after Guinea decided to develop Kaleta dam as a standalone.
Kenya, South SudanEast Africa, North-Eastern AfricaIGAD
Construction of 365 km Juba-Torit-Kapoeta-Nadapal single cariageway road in South Sudan. The road links with the proposed South Sudan/Kenya OSBP project at Nadapal.
Le projet de route Ketta-Djoum consiste en sa deuxième phase au bitumage de la section Sembe (Congo)-Mintom (Cameroun). Les travaux concernent les tronçons Sembe-Souanké-Ntam(143km) au Congo et Mintom-Lele-Ntam(90km) au Cameroun, les études et les appuis institutionnels au secteur des transports, l'appui A la facilitation du transport et du commerce, et le soutien A la biodiversité.
Widening of the road from 6m to 7m with a paved shoulder to harmonise with EAC standard. The Muyinga-Gitega road is about 104 km on the RN12. This road forms part of the shortest route to the port of Dar es Salaam and carries 60% of international traffic with Burundi.
WaterW.05.01Koukoutamba (ex-Gourbassy) Multi-purpose Dam
Mali, SenegalWest Africapap1
The project involves the construction of the Koukoutamba multi-purpose dam (previously known as Gourbassy dam) between Mali and Senegal.
A feasibility study and preliminary design for the Gourbassy Dam was completed by SNC LAVALIN International in 2012 for the OMVS Secretariat (Haut Commissariat de l"’OMVS), with funding from the World Bank under the project PGIRE 1. The main summary report is dated July 2012.
Since then, some (rather modest) progress has been made on further project preparation and mobilisation of finance. Activities that have been undertaken include: preparation of terms of reference for detailed design studies and tender documents. The preparation of studies to assess the cost of building the dam; and development of plans to mobilise finance, including planning for a donor round table and sending out funding requests to potential partners has been done.
TransportT.11.09Walvis Bay Port New Container Terminal
NamibiaSouthern Africapap1
Strategically located half-way down the coast of Namibia, with direct access to principal shipping routes, Walvis Bay is a natural gateway for international trade. Walvis Bay is Namibia's largest commercial port, receiving approximately 3,000 vessel calls each year and handling about 5 million tonnes of cargo. In order to deal with even higher levels of throughput, cargo-handling facilities have been improved, and Namibia Port Authority (Namport) remains committed to infrastructure development, in line with Namport's Mission to provide efficient and effective port and related services.
The project will expand the Port of Walvis Bay"’s container handling as well as bulk handling capacity ahead of demand by the construction of a 30 hectare large new modern container terminal on reclaimed land with 600m of quay wall length designed for a water depth of 16.5m alongside but dredged to 14.0m initially. In so doing the current container terminal will be converted back to a multipurpose terminal capable of handling more bulk and break bulk cargo.
EnergyE.09.03.01Egypt - Libya section of ELTAM Transmission Interconnector (Egypt part)
Egypt, LibyaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Egypt part of the 340 km / 500 kV Egypt to Libya section from the Mersa Matruh to the Libya border.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga via Dodoma and Singida. The design capacity of this section is 2000MW.
Construction of a transmission linethat connects the power networks ofTanzania and Kenya. This projectincludes the section of 414km of400kV transmission line from Singidato Namanga via Arusha. The designcapacity is 2,000MW.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project initially included the section of 400kV, 1134km bidirectional Tanzanian section of the 2,800km ZTK interconnector from Kasama in Zambia to Tunduma-Mbeya-Iringa-Singida-Arusha in Tanzania terminating at Isinya in Kenya. The design capacity of the Tanzania section is 2000MW. The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV.
The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.
TransportT.08.04.01Dar es Salaam Port Modernisation
TanzaniaEast Africapap1
The project involves the modernisation of the Dar es Salaam Port, including upgrade to berths 1 to 7, deepening of the harbour, improveing cargo handling and port layout.
TransportT.06.03.01.01Serenje - Nakonde Road Link 1 (Serenje - Mpika)
Botswana, Malawi, Namibia, Republic of Congo, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province covering a total distance of 611.5 km. The road is divided in 3 links: Link 1: Serenje to Mpika (238.3 km), Link 2: Mpika to Chinsali (164.6 k), Link 3: Chinsali to Nakonde (208.6 km) The Serenje-Nakonde road is part of the Regional Trunk Road Network (RTRN Link 15) as well as the Trans-African Highway Nr 4.
Angola, Democratic Republic of CongoCentral Africa, Southern Africapap1
The project is part of the Inga-Cabinda-Pointe Noire transmission interconnector, linking the power systems of DRC, Angola and Congo, with a transfer capacity of 600 MW. The project involves the construction of a section in DRC from Inga to the border with Angola.
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The proposed 330 kV line is approximately 300 km long (177 km in CA´te d’Ivoire and 119 in Ghana) and involves a the construction of a transmission line, construction of a new substation at Akoupe-Zeudji in the North East of Abidjan in CA´te d’Ivoire and the construction of a new substation '"’Dunkwa"’"’ 2 at Dunkwa-on-Offin in Ghana.
The Kayanza- Bugarama road is about 59 km on the RN1. It originates from Bugarama and terminates in Kayanza City. This road forms part of the trade route with Rwanda.
TransportT.08.03.16Nyahua-Chaya, Urambo-Kaliua, Kazirambwa-Chagu and Malagarasi-Uvinza Roads
TanzaniaEast Africapap1
The project involves upgrading of missing links along part of the Central Corridor of Manyoni-Itigi-Tabora-Urambo-Kaliua-Kigoma: Nyahua to Chaya (90km), Urambo to Kaliua (33km), Kazirambwa to Chagu (40km) and Malagarasi to Uvinza (51km) from gravel to paved.
TransportT.06.03.01.03Serenje - Nakonde Road Link 3 (Chinsali - Nakonde)
Botswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province covering a total distance of 611.5 km. The road is divided in 3 links: Link 1: Serenje to Mpika (238.3 km), Link 2: Mpika to Chinsali (164.6 k), Link 3: Chinsali to Nakonde (208.6 km) The Serenje-Nakonde road is part of the Regional Trunk Road Network (RTRN Link 15) as well as the Trans-African Highway Nr 4.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km ZTK interconnector from Kabwe-Pensulo-Nakonde-Kasama in Zambia to Tunduma in Tanzania. The project was envisioned to be implemented in two phases starting with the Kabwe-Pensulo-Kasama-Nakonde section and the second phase would have comprised the Kabwe-Pensulo-Mpika-Kasama section. It will have had a capacity of 500MW, upgradable to 2000MW depending on power demand.
The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV. The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.
EnergyE.09.01.01Algeria - Tunisia section of ELTAM Transmission Interconnector (Algeria part)
Algeria, TunisiaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Algeria part of the 220 km / 400 kV Algeria to Tunisia section from Cheffia in Algeria to the Tunisia border.
EnergyE.09.02.01Libya - Tunisia section of ELTAM Transmission Interconnector (Libya part)
Libya, TunisiaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Libya part of the 210 km / 400 kV Libya to Tunisia section from Abou Kamach in Libya to the Tunisia border. It has a power transmission capacity of 1000 MW.
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment
Tone & Mood
Will generate for 15projects (top by investment value). Estimated time: ~2 min.