Programme for Infrastructure Development in Africa (PIDA) - PAP 2 brings together 61 infrastructure projects worth $196.73 B in total investment across 55 countries and 7 regions. To date, 3% of capital cost is financed, with 13% of projects already advancing through implementation. The panels below answer the essential questions — what, where, when, who, how and why.
Preferences are saved to this browser only.
| Indicator | Stage | Target | Achieved | Progress | Projects |
|---|
Each country reported at the delivery stage of its projects — a country may appear in several stages, with the number of projects at each.
| Project Name | Code | Sub-Sector | Stage | Status | Countries | Investment |
|---|---|---|---|---|---|---|
| Abidjan-Ouagadougou-Niamey-Cotonou-Lomé Regional Rail Loop | T.RL.26.04 | Railway | S2B | Active | Benin, Burkina Faso, Côte d'Ivoire, Niger, Togo | $53.97 B |
| Praia-Dakar-Abidjan Multimodal Transport Corridor | T.RD.26.02 | Road | S2B | Active | Burkina Faso, Cabo Verde, Côte d'Ivoire, Gambia, Ghana, Guinea, Guinea-Bissau, Liberia, Mali, Niger, Nigeria, Senegal, Sierra Leone | $21.07 B |
| Mombasa-Nairobi-Malaba-Kampala-Kigali Standard Gauge Railway with Malaba-Nimule-Juba Spur | T.RL.26.03 | Railway | S4A | Active | Burundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, Uganda | $19.20 B |
| Abidjan-Lagos Corridor Highway Development Project | T.RD.26.03 | Road | S2B | Active | Benin, Côte d'Ivoire, Ghana, Nigeria, Togo | $15.62 B |
| Grand INGA Phase 1 | E.30.16 | Hydro Power Plant | S2B | Active | Democratic Republic of Congo, South Africa | $14.25 B |
| Establishment of a Navigational Line between Lake Victoria and the Mediterranean Sea - Feasibility Study Phase 2 (VICMED) | T.IW.26.04 | Inland Port & Waterway | S2B | Active | Burundi, Democratic Republic of Congo, Egypt, Ethiopia, Kenya, Rwanda, South Sudan, Sudan, Tanzania, Uganda | $12.02 B |
| Libyan Alternative Freeway | T.RD.26.07 | Road | S3A | Active | Algeria, Egypt, Libya, Mauritania, Morocco, Tunisia | $7.00 B |
| 3,050 MW Mambilla Hydroelectric Power Project | E.30.08 | Hydro Power Plant | S3A | Active | Nigeria | $5.85 B |
| Mtwara-Mbamba Bay Standard Gauge Railway with Spurs to Liganga and Mchuchuma | T.RL.26.01 | Railway | S3B | Active | Malawi, Mozambique, Tanzania, Zambia, Zimbabwe | $6.30 B |
| Trans-Saharan Optic Fibre Broadband Project | I.02.30.01 | Fibre Optic Cable | S2A | Active | Algeria, Chad, Mali, Mauritania, Niger, Nigeria | $4.50 B |
| Rehabilitation, Modernisation and Service Improvement of the Trans-Maghreb Railway | T.RL.26.05 | Railway | S2A | Active | Algeria, Morocco, Tunisia | $4.00 B |
| INGA 3 Transmission Interconnector | E.30.15 | Power Interconnector | S1 | Active | Botswana, Democratic Republic of Congo, South Africa, Zambia, Zimbabwe | $3.61 B |
| Construction of a Bridge over the Oubangui River and Development of the Bangui-Kisangani-Kampala and Kisangani-Bujumbura Corridors | T.BD.20.02 | Bridge | S1 | Active | Burundi, Central African Republic, Democratic Republic of Congo, Uganda | $3.49 B |
| Lesotho Highlands Water Project Phase II | W.30.08 | Water Transfer | S4B | Active | Lesotho, South Africa | $3.17 B |
| Lesotho Highlands Water Project (LHWP) Phase II | W.04.01 | Multi-purpose Reservoir | TBC | Active | Lesotho, South Africa | $2.60 B |
| Lesotho-Botswana Water Transfer Project | W.30.04 | Water Supply | S2B | Active | Botswana, Lesotho, South Africa | $2.54 B |
| Egypt and Sudan Electrical Grid as the First Stage of the Continental Electrical Interconnection | E.30.14 | Power Interconnector | S2B | Active | Egypt, Sudan | $2.22 B |
| Development of the Chollet Hydroelectric Site and Associated Transmission Lines | E.30.10 | Hydro Power Plant | S3A | Active | Cameroon, Republic of Congo | $2.09 B |
| Continental Africa Water Investment Support Programme (AIP) | W.30.01 | Water Supply | S1 | Active | Benin, Cameroon, Ghana, Kenya, Nigeria, Tunisia, Uganda, Zambia | $1.91 B |
| Development of the Booue and Tsengue-Leledi Hydroelectric Sites and Associated Transmission Lines | E.30.09 | Hydro Power Plant | S2B | Active | Gabon | $1.90 B |
| Baynes Hydropower Project | E.30.11 | Hydro Power Plant | S2B | Active | Angola, Namibia | $1.33 B |
| Bou Salem-Algerian Border Motorway | T.RD.26.04 | Road | S3A | Active | Algeria, Tunisia | $805.3 M |
| Construction of 287 MW Ruzizi IV Hydropower Project | E.30.02 | Hydro Power Plant | S2B | Active | Burundi, Democratic Republic of Congo, Rwanda | $864.0 M |
| Eastern Africa Green Power Transmission Network Project 6 - Guba (Ethiopia)-Khartoum (Sudan) | E.30.06 | Power Interconnector | S2B | Active | Ethiopia, Sudan | $695.0 M |
| Louga Hydroelectric Power Plants 1 and 2 (246 MW) | E.30.12 | Hydro Power Plant | S2B | Active | Côte d'Ivoire | $643.0 M |
| Luapula Hydropower Project | E.30.04 | Hydro Power Plant | S2B | Active | Democratic Republic of Congo, Zambia | $602.0 M |
| Noordoewer/Vioolsdrift Dam | W.30.09 | Water Supply | S2B | Active | Namibia, South Africa | $503.0 M |
| Modernisation of RN01 between Ghardaia and Tamanrasset | T.RD.26.08 | Road | S3A | Active | Algeria, Chad, Libya, Mali, Niger, Nigeria, Tunisia | $500.0 M |
| Ntem River Bridge on the Kribi-Campo-Bata Transnational Road | T.BR.26.01 | Bridge | S3B | Active | Cameroon, Equatorial Guinea, Gabon | $447.3 M |
| Development of the BAC and LOTEMO Hydroelectric Sites on the Lobaye River, and Related Works in CAR | E.30.17 | Hydro Power Plant | S2B | Active | Central African Republic, Chad, Democratic Republic of Congo, Republic of Congo | $408.5 M |
| Egypt and Libya Regional Electrical Interconnection as the First Stage of Completion of the Regional Electrical Interconnection of the North African Region | E.30.13 | Power Interconnector | S2A | Active | Egypt, Libya | $315.0 M |
| Akagera River Transport | T.IW.26.02 | Inland Port & Waterway | S2B | Active | Burundi, Rwanda, Tanzania, Uganda | $298.1 M |
| WAPP Regional Solar Power Park Project in Mali | E.30.18 | Solar Power Plant | S2B | Active | Mali | $267.5 M |
| Zimbabwe Zambia Botswana Namibia (ZIZABONA) Interconnector Project | E.30.05 | Power Interconnector | S2B | Active | Botswana, Namibia, Zambia, Zimbabwe | $250.0 M |
| Noumbiel Multipurpose Dam | W.30.05 | Multi-purpose Reservoir | S2B | Active | Burkina Faso, Côte d'Ivoire, Ghana | $169.0 M |
| Integration of Electrical Networks between Inga-Cabinda and Pointe Noire | E.30.07 | Power Interconnector | S3A | Active | Angola, Democratic Republic of Congo, Republic of Congo | $178.0 M |
| Fes-Oujda Motorway Link to the Algerian East-West Motorway | T.RD.26.01 | Road | S1 | Active | Algeria, Morocco | $140.0 M |
| Angololo Multipurpose Water Resources Development Project | W.30.02 | Water Supply | S3A | Active | Kenya, Uganda | $140.2 M |
| Construction of Amilcar Cabral Submarine Cable System | I.02.30.02 | Fibre Optic Cable | S3B | Active | Algeria, Cabo Verde, Gambia, Guinea, Guinea-Bissau, Liberia, Sierra Leone | $110.0 M |
| Support Programme for the Facilitation of Transport by Inland Waterways, Securing River Navigation and the Sustainable Management of Water Resources in the Congo Basin | W.30.15 | Water Transfer | S1 | Active | Angola, Cabo Verde, Central African Republic, Chad, Democratic Republic of Congo, Gabon, Republic of Congo | $98.8 M |
| Development of Data Centre Infrastructures Underpinning the Digital Economy | I.02.30.04 | Data Centers | S1 | Active | Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and Principe | $92.5 M |
| Interconnection of Member States' Broadband Networks | I.02.30.11 | Fibre Optic Cable | S1 | Active | Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and Principe | $92.5 M |
| Beira Port Development | T-PT-26-001 | Port | S4B | Active | Democratic Republic of Congo, Malawi, Mozambique, Zambia, Zimbabwe | $88.0 M |
| Water Supply Project in Antanambao Manampotsy | W.30.11 | Water Supply | S2A | Active | Madagascar | $88.0 M |
| Extension of National ICT Broadband Backbone (NICTBB) to DRC by construction of optical fibre cable across Lake Tanganyika and point of presences (PoPs) for providing connectivity with DRC | I.02.30.10 | Fibre Optic Cable | S2A | Active | Democratic Republic of Congo, Mozambique, Tanzania | $60.0 M |
| Praia-Dakar Shipping and Maritime Services Project | T.IW.26.01 | Inland Port & Waterway | S3A | Active | Cabo Verde, Senegal | $57.2 M |
| Fomi Multipurpose Dam Development Project | W.30.10 | Multi-purpose Reservoir | S2B | Active | Benin, Burkina Faso, Cameroon, Chad, Côte d'Ivoire, Guinea, Mali, Niger, Nigeria | $55.2 M |
| Sudan Section of the Fiber Optic Connectivity Component of the Port Sudan to Douala Corridor | I.02.30.09 | Fibre Optic Cable | S2A | Active | Cabo Verde, Central African Republic, Chad, Ethiopia, South Sudan, Sudan | $55.0 M |
| Mobilisation and Transfer of Water from Bria Dam to Lake Chad | W.30.14 | Water Transfer | S2A | Active | Cameroon, Central African Republic, Chad, Libya, Niger, Nigeria | $25.6 M |
| SADC Regional Carrier-Neutral Data Centre | I.02.30.07 | Data Centers | S1 | Active | Angola, Botswana, Democratic Republic of Congo, Eswatini, Lesotho, Madagascar, Malawi, Mauritius, Mozambique, Namibia, SADC Countries, Seychelles, South Africa, Tanzania, Zambia, Zimbabwe | $10.0 M |
| Extension of National ICT Broadband Backbone (NICTBB) to Mozambique | I.02.30.08 | Fibre Optic Cable | S2A | Active | Mozambique, Tanzania | $3.0 M |
| Operationalisation of São Tomé and Príncipe Hydrometric Stations | W.30.13 | Water Supply | S2B | Active | Sao Tome and Principe | $1.5 M |
| Using Solar and Wind Energy to Extract Groundwater in Pastoral Wells | W.30.12 | Water Supply | S0 | Active | Libya, Tunisia | $400 K |
| Implementation of an ECOWAS Regional Internet Exchange Points | I.02.30.03 | Internet Exchange Point | S2B | Active | Benin, Burkina Faso, Cabo Verde, Côte d'Ivoire, Gambia, Ghana, Guinea, Guinea-Bissau, Liberia, Mali, Niger, Nigeria, Sao Tome and Principe, Senegal, Sierra Leone, Togo | $300 K |
| Construction of the Dam and Development of the Palambo Hydroelectric Plant | W.30.03 | Water | S2B | Active | Central African Republic, Democratic Republic of Congo, Republic of Congo | $15.0 M |
| Development of a Continental Aviation Infrastructure Master Plan Including a Seamless Airspace Architecture | T.AV.26.01 | Aviation | S1 | Active | Algeria, Angola, Benin, Botswana, Burkina Faso, Burundi, Cabo Verde, Cameroon, Central African Republic, Chad, Comoros, Côte d'Ivoire, Democratic Republic of Congo, Djibouti, Egypt, Equatorial Guinea, Eritrea, Eswatini, Ethiopia, Gabon, Gambia, Ghana, Guinea, Guinea-Bissau, Kenya, Lesotho, Liberia, Libya, Madagascar, Malawi, Mali, Mauritania, Mauritius, Morocco, Mozambique, Namibia, Niger, Nigeria, Republic of Congo, Rwanda, SADC Countries, Sao Tome and Principe, Senegal, Seychelles, Sierra Leone, Somalia, South Africa, South Sudan, Sudan, Tanzania, Togo, Tunisia, Uganda, Zambia, Zimbabwe, _Not Applicable | $1.2 M |
| Feasibility and In-depth Studies on the Development of Lake Chad | W.30.07 | Water Supply | S2B | Active | Cameroon, Central African Republic, Chad, Niger, Nigeria | $21.6 M |
| Construction of Petroleum Jetty and Associated Storage Facilities at Albion, Mauritius | T.IW.26.03 | Inland Port & Waterway | S1 | Active | Mauritius | — |
| Doubling of RN06 Mascara-Bechar and RN50 Bechar-Algeria-Mauritania Border | T.RD.26.05 | Road | S4B | Active | Algeria, Mali, Mauritania, Senegal | — |
| Maritime Link between the Comoros Islands | T.MM.26.01 | Multi-modal | S4A | Active | Comoros, Madagascar, Mauritius | $2.0 M |
| Trans-Maghreb Cross-Border Multiservice Logistics Zones | T.LG.26.01 | Logistics | S1 | Active | Algeria, Libya, Mauritania, Morocco, Tunisia | $700 K |
Ask anything about Programme for Infrastructure Development in Africa (PIDA) - PAP 2
Share photos, documents, data or insights. Your contribution helps keep this programme's information accurate, transparent and up to date for all stakeholders.
Our team will review your submission and add it to the programme shortly. We appreciate your support.
All contributions are reviewed by the programme management team before being published. We may contact you for clarification. Submissions are usually reviewed within 5 working days.
Your contact details are used only to follow up on your submission and will not be shared publicly.
African Infrastructure Database · 2020 — Programme for Infrastructure Development in Africa (PIDA) - PAP 2
Published Jul 31, 2026 · African Infrastructure Database