African Infrastructure Database
Connecting Africa through infrastructure

Project Showcase

Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.

647 published projects6 presentation themesAtlas map modeVoice narration
  1. 1Filter projectsby sector, country, stage or programme
  2. 2Selectthe projects you want to present
  3. 3Create a showwith AID Intelligence and present full screen
17 of 17 published projects
#
Project
Investment · stage
1
Proposed Semliki HP Dam
…
Energy Democratic Republic of Congo, Uganda Central Africa, East Africa
$900M Project Definition Active Express interest →
2
Gogo Falls Water resources development (MPP) BIP_NELSAP_012
This Project is located in Western Kenya. The dam is intended to provide flood controls, irrigation development and hydropower generation. The project includes a 155 Mm3 dam, 20MW electricity, 30,000ha of irrigation,…
Water Kenya East Africa
$393M Pre-Feasibility Active Express interest →
3
Borenga Dam and Mara Valley Multipurpose Water Resources Development Project BIP_NELSAP_011
The Mara River Basin Project contributes to improved living conditions of the basin communities by creating an enabling environment for sustainable development-oriented investments and building capacity of riparian staff and communities in integrated water…
Water Tanzania East Africa
$212M Project Structuring Active Express interest →
4
Ruvyironza Multipurpose Water Resources Development Project BIP_NELSAP_017
The Ruvyironza Multipurpose Water Resources Development Project (PIDA Code: BIP_NELSAP_017) is a major infrastructure initiative in Burundi. The project's core component is the construction of a multipurpose dam on the…
Water Burundi East Africa 2024-01-NRBIP
$200M Feasibility Active Express interest →
5
Ngono MPP Water Resources Development Project (MPP) BIP_NELSAP_015
The Ngono Valley project (located in the western shores of Lake Victoria and shared by the Districts of Bukoba Rural and Missenyi) will…
Water Tanzania East Africa
$172M Project Structuring Active Express interest →
6
Uganda (Nkenda) - D.R. Congo (Beni - Butembo -Bunia) Transmission Line BIP_NELSAP_023
The Uganda (Nkenda) - DR Congo (Beni-Butembo-Bunia-Mabuki) Power Transmission Inter-Connection Project is a strategic regional infrastructure initiative aimed at constructing a 400 kV double-circuit high voltage transmission line spanning 352.2…
Energy Democratic Republic of Congo, Uganda Central Africa, East Africa 2024-01-NRBIP
$165M Project Structuring Active Express interest →
7
Angololo Multipurpose Water Resources Development Project W.30.02
The project will construct a dam of about 30 metres on the Malaba River at the Kenya-Uganda border, creating a reservoir of roughly 31 million cubic metres. The scheme is…
Water Kenya, Uganda East Africa 2020
$137M Project Structuring Active Express interest →
8
Lake Victoria Water and Sanitation Initiative Phase II (LVWATSAN II)
This project involved construction of water supply and sanitation systems, improving solid waste and storm water management, improving watershed management, improving urban planning and building capacity of urban authorities in 15 secondary towns…
Water Burundi, Kenya, Rwanda, Tanzania, Uganda East Africa
$110M Operation Completed Express interest →
9
Integrated Management of Transboundary Water Resources of Lakes Rweru, Cyohoha and the Akanyaru Marshlands (GIRET) BIP_NELSAP_001
The project area covers the Akanyaru marshland, the Lakes Cyohoha and Rweru and their watersheds shared by Rwanda and Burundi, and is located in the Akanyaru sub-basin and the downstream…
Water Burundi, Rwanda East Africa
$95M Feasibility Active Express interest →
10
Limur / Nyimur multipurpose water resources project BIP_NELSAP_016
The Nyimur/Limur multipurpose water resources project is a transboundary project located in the Aswa Basin covering parts of Lamwo District, Uganda and Magwi Country, Eastern Equatorial State, South Sudan. The location coordinates are 3.560042°N,…
Water South Sudan, Uganda East Africa, North-Eastern Africa 2024-01-NRBIP
$90M Feasibility Active Express interest →
11
Parajok Water resources development project (MPP)
 The Project is located in Eastern Equatorial state of South Sudan. It is in the southern part of Magwi County, approximately 39 kilometres south of Magwi, near the border with Uganda -…
Energy South Sudan North-Eastern Africa
$42M Pre-Feasibility Active Express interest →
12
Lau Watershed Management Project BIP_ENTRO_016
The Lau Watershed Management project is one of the four fast track projects prepared in 2007 under the Eastern Nile Watershed Management (ENWM) Project. The Lau Watershed project area is administratively located within…
Water South Sudan North-Eastern Africa ENTRO
$35M Operation Active Express interest →
13
GERD (Ethiopia)- Khartoum (Sudan)Transmission Line E.02.02.01
Construction of a transmission line (580 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The…
Energy Ethiopia, Sudan North-Eastern Africa IGAD
$29M Project Structuring Stall Express interest →
14
Kitoba-Lubango Water Resources Project
The Kitoba-Lubango focal area (5,664 ha) is situated in is located between the villages of Kitoba and Lubango, in the territory of Lubero, in the district of Goma, in the province of North…
Water Democratic Republic of Congo Central Africa
$21M Pre-Feasibility Active Express interest →
15
Integrated Watershed Management Project in Atbara Catchment BIP_ENTRO_015
The Dinder, Atbara and Bau Watershed Management Project is one of the four fast track projects prepared in 2007 under the Eastern Nile Watershed Management (ENWM) Project. Three watersheds were…
Water Ethiopia North-Eastern Africa ENTRO
$12M Feasibility Active Express interest →
16
Review of Eastern Nile Livelihood Based Watershed Management programme - prioritizing interventions and taking to for scale for a basin wide impact BIP_ENTRO_018
Its main aim is to promote transboundary cooperation among Ethiopia, Sudan and South Sudan, to tackle watershed degradation, reduce sedimentation, and foster sustainable livelihoods and food security. The Baro-Akobo-Sobat IWRDMPlan's…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$1M Feasibility Active Express interest →
17
Transboundary Watershed/Wetland Management Project (Sudan and Ethiopia)
This project will be located in the Blue Nile Sub-basin covering among others the ecological significant watersheds of the Dinder and Rahad Rivers. The two rivers originate in the Ethiopian Highlands and flow…
Water Ethiopia, Sudan North-Eastern Africa
Not reported Project Definition Active Express interest →
Showing 17 of 17 published projects (Page 1 of 1)
Per page: 50 100 150 1
0 projects selected
AID Showcase 1 / 17
aid.nepad.org

Intelligent AID — Create Showcase

Showcase ready! You have a previously generated AI showcase for these projects in this session.

Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.

Narrative Style

Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment

Tone & Mood

Will generate for 15 projects (top by investment value). Estimated time: ~2 min.
Preparing...