The project comprise of the following: (1) complete or initiate dredging of port of Kigoma to restore design depths of generally around 6 m on approach to, in anchorage and…
The project entails detailed studies and engineering designs for the construction of a bridge over the Ntem River and its access roads linking the Republics of Cameroon and Equatorial Guinea.
The…
The Kuito-Luena Road project (PIDA Code T.21.05) involves the rehabilitation and upgrading of a 184 km road section connecting the cities of Kuito (Bié Province) and Luena (Moxico Province) in…
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya -…
TransportEthiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya -…
TransportEthiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The railway project preliminary designs are
complete for the Kenyan and Ethiopian route and expected to proceed to the
Detailed Engineering Design stage. The Government Kenya and the Government of
Ethiopia have signed…
The project will help fill the missing road links in the Central Africa region, by creating logistic chains and boosting economic activities along this major road corridor. The project is part of…
The Lobito Dry Port is a major logistics platform under development in Angola, designed to serve as a critical inland container depot (ICD) and transshipment hub for the Lobito Corridor.…
The Lobito Port Upgrading project is a major infrastructure initiative in Angola aimed at modernizing and expanding the Port of Lobito to increase its capacity and efficiency. The project scope…
This project is the Zimbabwe section of the Beira - Harare railway (rail component of the Beira multimodal corridor), from the Mozambique border at Machipanda, to the capital Harare.
Approval of the reduction in export capacity through the Port of Ngqurato a capital-optimised12Mtpa
Scope change:
-Scope Change Notification supported by Transnet Board in Nov. '17. Notification in principle supported by DPE…
Master Plan for Regional Port Capacity and Regional Rail Linkages (including Lamu Port) (Phase 1)T.10.01
The project scope will cover construction of the first nine deep sea berths at the Lamu Port in Manda Bay to contain Crude Oil and Coal Terminals, General Cargo and Bulk Cargo…
TransportBurundi, Ethiopia, Kenya, Rwanda, South Sudan, UgandaEast Africa, North-Eastern Africapap1
Maydon Wharf is the largest Break Bulk and Dry Bulk precinct in the Port of Durban and in the TNPA ports system. Seven of the 15 berths were constructed 60…
Modernization of the RN01 (Trans-Saharan) between Ghardaia and Tamenrasset (Algeria Section)
National Road No. 01 stretches from Algiers to Mali and Niger over more than 2400 km. It has been twinned for approximately 500 km (between Algiers and Laghouat) and includes…
TransportAlgeria, Chad, Libya, Mali, Nigeria, TunisiaCentral Africa, North Africa, West Africa
Develop a multi-product pipeline between Durban and Gauteng to expand pipeline capacity and replace the existing pipeline that has reached the end of its economic life. Initial capacity (phase 1)…
This project entails the completion of the container terminal footprint to its full potential. The quay wall infrastructure is completed and provides for four container terminal berths but still requires…
The study of the Ntem River Bridge is part of the Kribi-Campo-Bata maritime route linking the port of Kribi to Cameroon and Bata in Equatorial Guinea. The inter-capital connections study…
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its…
Not reportedTransaction Support & Financial CloseActiveExpress interest →
242
ORE LINE: SISHENTO SALDANHA (ON HOLD)
The iron ore line is the main export channel for iron ore from the mines in the Northern Cape to the Port of Saldanha. The current capacity of the ore…
The Richards Bay Expansion Programme (RBEP) was resurrected in 2016 for the development of a Long Term Infrastructure Blueprint (LTIB). The LTIB will provide a roadmap of incremental expansion of…
The project comprise of the following: (1) complete or initiate dredging of port of Kigoma to restore design depths of generally around 6 m on approach to, in anchorage and along Berths; (2) establish a watercourse management system to minimize soil erosion and sedimentation at ports; and (3) rehabilitating or establishing of areas and ramps to accommodate vehicles (in particular MAFI trailers and forklifts) involved with RoRo operations at ports.
The project entails detailed studies and engineering designs for the construction of a bridge over the Ntem River and its access roads linking the Republics of Cameroon and Equatorial Guinea.
The project also includes the construction of a one-stop border post (OSBP) and the implementation of trade facilitation measures along the Transport Corridor linking Yaoundé in Cameroon, Bata in Equatorial Guinea and Libreville in Gabon.
The Kuito-Luena Road project (PIDA Code T.21.05) involves the rehabilitation and upgrading of a 184 km road section connecting the cities of Kuito (Bié Province) and Luena (Moxico Province) in central Angola. The project is part of the Trans-African Highway Network (Cairo-Cape Town Corridor, TAH 4) and aims to improve a critical domestic and regional transport link. The scope includes upgrading the road to paved, all-weather standards, improving geometric design, constructing drainage structures, and implementing road safety features. The project is a national priority within Angola's National Development Plan (PND 2018-2022) and the Southern African Development Community (SADC) Regional Infrastructure Development Master Plan.
Ethiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.
The project is divided into four sections as follows:
Lamu - Garissa Road -263km
Garissa-Isiolo Road - 305km
Isiolo - Nginyang Road - 212km
Nginyang - Lokichar - Nadapal - 533km
NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.
Ethiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.
The project is divided into four sections as follows:
Lamu - Garissa Road -263km
Garissa-Isiolo Road - 305km
Isiolo - Nginyang Road - 212km
Nginyang - Lokichar - Nadapal - 533km
NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.
The railway project preliminary designs are
complete for the Kenyan and Ethiopian route and expected to proceed to the
Detailed Engineering Design stage. The Government Kenya and the Government of
Ethiopia have signed a Bilateral Agreement to jointly pursue the development of
the LAPSSET Standard Gauge Railway. A Memorandum of Understanding (MoU) has
been signed between LCDA and Inter-Governmental Authority on Development (IGAD)
to facilitate the financing of this stage though an Infrastructure Project
Preparatory Fund (IPPF) available through the New Partnership for African
Development (NEPAD).
The project will help fill the missing road links in the Central Africa region, by creating logistic chains and boosting economic activities along this major road corridor. The project is part of the Central African Inter-Capitals Connectivity programme, which aims to provide several missing inter-capital connectors.
The Lobito Dry Port is a major logistics platform under development in Angola, designed to serve as a critical inland container depot (ICD) and transshipment hub for the Lobito Corridor. The project involves the construction of a dry port facility with a planned warehousing area of 10,000 hectares. Key components include container yards, customs facilities, bonded warehouses, cargo handling equipment, and road/rail connectivity to the Port of Lobito. The project is a key component of the broader Lobito Corridor development, which connects the Angolan coast to the Democratic Republic of the Congo (DRC) and Zambia.
The Lobito Port Upgrading project is a major infrastructure initiative in Angola aimed at modernizing and expanding the Port of Lobito to increase its capacity and efficiency. The project scope includes the expansion of the port area by 80,000 m2, the upgrading of existing dry dock facilities, and the construction of a new mineral terminal covering 150,000 m2 to serve the Lobito Corridor's mining exports. Key technical components involve deepening the access channel and berths, installing new cargo handling equipment (including gantry cranes), and constructing modern warehouses and container yards. The project is a critical node in the Lobito Atlantic Corridor, linking the port to the interior of Angola, the Democratic Republic of the Congo (DRC), and Zambia.
This project is the Zimbabwe section of the Beira - Harare railway (rail component of the Beira multimodal corridor), from the Mozambique border at Machipanda, to the capital Harare.
Approval of the reduction in export capacity through the Port of Ngqurato a capital-optimised12Mtpa
Scope change:
-Scope Change Notification supported by Transnet Board in Nov. '17. Notification in principle supported by DPE during Nov. "’17 bilateral and formal Notification submitted to Shareholder Minister in Dec. '17-pending approval. Shareholder"’s Compact KPIs amended to reflect revised scope.
-DoT notified of change in scope and completion date affecting Section 79 directive.
-Rail Phase 1:(Extension of 97km of loops between Kimberley & De Aar; and Rosmeadstation)
?Original scope of work is complete and has operationally been taken over by TFR.
?Contract with the EPCM service provider ended on 15 December 2017.
?Remaining work -managed by RME comprise upgrading of 26 level crossings and construction of a pedestrian bridge at Modderrivier.
-Rail Phase 2: (Extension of crossing loops; traction power upgrade; holding yards at Mamathwaneand Grassridge; tippler yard at Coega; loco change-over at Beaconsfield)
?Conducting scope validation study in line with the capital-optimized scope of works
?Conducting preliminary engineering towards a scope validation peer review scheduled for May 2018
?Completed works information to go out on tender for two new substations at Witloop& Vlermuislaagte
-NMET (Port) (Operationalisingand commissioning limited terminal footprint in the Port of Ngqura)
?Topographical surveys and optimised concept designs completed
?Building concept designs in progress
?Environmental authorisations in place
-CDC land acquisition: Formal delegation to proceed with commercial transaction pending
-Stakeholder management: Significant escalation of resistance from local government, businesses and citizens with regards to health & safety impact of Mnore dust via the PE bulk and break-bulk export facilities
TransportT.10.01Master Plan for Regional Port Capacity and Regional Rail Linkages (including Lamu Port) (Phase 1)
Burundi, Ethiopia, Kenya, Rwanda, South Sudan, UgandaEast Africa, North-Eastern Africapap1
The project scope will cover construction of the first nine deep sea berths at the Lamu Port in Manda Bay to contain Crude Oil and Coal Terminals, General Cargo and Bulk Cargo Terminals.
This may involve some of all of the following activities, i.e. dredging and reclamation; construction of berths and yards; construction of revetment, causeway and road; construction of buildings and utilities; procurement of equipment and tug boats; etc.
Maydon Wharf is the largest Break Bulk and Dry Bulk precinct in the Port of Durban and in the TNPA ports system. Seven of the 15 berths were constructed 60 years ago of steel sheet piles that are now heavily corroded and at high risk of structural failure. Piecemeal repairs cannot guarantee the structural integrity of the quay walls as they have deteriorated severely and reached the end of their serviceable life. Although restrictions have been placed on the operational loading of these quays to ensure short term safety, they must be replaced as soon as possible for on going sustainable operations.
The scope entails the construction of 7 combi steel pile quay walls, inclined grouted anchors with associated cope beams, quayside paving, bollards, fenders and new services. The berths will be dredged and deepened to -14.5m CD with rock scour protection.
Phase 1 of the project required the extension of Berth 12 by 12m into the harbour to align with Berths 13 -15 and to create an additional deep water berth to handle large vessels.
Phase 2 entails the reconstruction and deepening of berths 1 -4, 13 & 14.
Capacity:
This project is to sustain the current capacity
TransportModernization of the RN01 (Trans-Saharan) between Ghardaia and Tamenrasset (Algeria Section)
Algeria, Chad, Libya, Mali, Nigeria, TunisiaCentral Africa, North Africa, West Africa
National Road No. 01 stretches from Algiers to Mali and Niger over more than 2400 km. It has been twinned for approximately 500 km (between Algiers and Laghouat) and includes a branch towards Tunisia, continuing all the way to Lagos and N'Djamena. The Trans-Saharan route begins from the East/West Highway in the Wilaya of Blida (located 50 km west of the capital Algiers) and extends to Ain Guezzal at the border with the Republic of Niger, covering around 2400 km, with a branch extending to the Republic of Mali.
The current state of the Trans-Saharan route is as follows:
From the junction with the East/West Highway to the northern limit of the Wilaya of Ghardaia, approximately 580 km, the road is twinned. For 53 km (between the junction with the East/West Highway and the town of Berrouaghia), it has the characteristics of a highway (the works are nearing completion);
From the northern limit of the Wilaya of Ghardaia to the town of El Gholéa (El Menea), over 268 km, twinning studies are ongoing, conducted by an Algerian engineering firm;
From the southern limit of Ghardaia to Ain Guezzam at the border with Niger, approximately 1257 km, 342 km are under preservation works, while the remaining 915 km require preservation operations (not yet scheduled).
The goal is to increase the capacity of the Trans-Saharan route by twinning the remaining 1525 km. It is also noteworthy that the entire length of the Trans-African road is paved. As a prime example of a trans-African project, contributions from African entities to the development and modernization of this axis are highly desired.
Objective and Rationale for the Project:
This North-South corridor facilitates regional integration. It offers African countries, particularly those in the Sahel, the possibility of access to the Mediterranean Sea and the use of Algerian ports, especially in their trade with European countries. The Trans-Saharan road is connected to the East/West Highway in the Wilaya of Blida (about 50 km west of the capital Algiers). It thus facilitates East/West exchanges, particularly with neighboring countries Morocco and Tunisia.
Develop a multi-product pipeline between Durban and Gauteng to expand pipeline capacity and replace the existing pipeline that has reached the end of its economic life. Initial capacity (phase 1) will be 8.7 blpawhich includes:
Installation of 162km of 16-inch pipelines and 555km of a 24-inch trunk line pipeline, three new pump-stations and two metering-stations on the trunk line and two terminals"”one in the Port of Durban (Coastal) and one at Jameson Park near Heidelberg (Inland).
Project plan:
The approved Phase 1a (Tight lining) Ability to Operate date is 30 November 2017. At this date, the project is forecasted to be operational as a multi-product pipeline operating at 1 080m?3;/h. The Coastal Terminal accumulator tanks have been separated into Phase 1b, for which a business case is currently under review.
This project entails the completion of the container terminal footprint to its full potential. The quay wall infrastructure is completed and provides for four container terminal berths but still requires equipping and operationalisation of the remaining two berths. TPT Operational capacity will increase in two phases from 800000 TEU"’s to 1.5m TEUs (Phase 2A) and then to 2mTEUs (Phase 2B)
Additional rail capacity will also be provided on the Ngqura to Gauteng corridor, with additional rolling stock of the Eastern Cape and diversified investment in the rail network. This will be treated as a separate project.
The study of the Ntem River Bridge is part of the Kribi-Campo-Bata maritime route linking the port of Kribi to Cameroon and Bata in Equatorial Guinea. The inter-capital connections study will identify missing links and determine the technical and economic feasibility of the construction of a crossing structure and the development of a single border control post at the border of Cameroon and Equatorial Guinea. It will make technical, legal and financial recommendations for the management and operation of the Yaounde-Kribi-Bata-Libreville development and corridor.
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its upgrading are ongoing, NEPAD/IPPF funds;
2) Rumonge-Nyanza Lac (45 km): Works are planned, funds from AfDB;
3) Nyanza Lac-Mugina (45 km): Upgrading completed.
The iron ore line is the main export channel for iron ore from the mines in the Northern Cape to the Port of Saldanha. The current capacity of the ore line is 60mt with 58mt for export and 2mt for the domestic market. Transnet plans to expand the corridor by increasing the capacity of the ore line to 75mt due to the increased demand on the ore line. The expansion programme will not only support the 2 major iron ore exporters Kumba and Assmang but also junior and emerging miners.
The iron ore corridor contributes significantly to the GDP of South Africa. Incremental capacity solutions will be designed to support further increases in demand up to 90mt in the long-term. The project will also result in the standardisation of the ore line locomotive fleet with a simplified maintenance and operating methodology.
The estimated capital requirement for 71mtpa is currently at R15bn (escalated), and includes a new berth, ship loader and stacker-reclaimer. Some rolling stock and rail infrastructure will also be required.
The Richards Bay Expansion Programme (RBEP) was resurrected in 2016 for the development of a Long Term Infrastructure Blueprint (LTIB). The LTIB will provide a roadmap of incremental expansion of the Transnet operated terminals in the Port of Richards Bay (PORB) to capture the growth in general purpose bulk and break bulk commodities of 53.7 mtpa by 2044. In September 2017, the brief of the RBEP was amended to incorporate immediate and medium term capacity constraints of the supply chain to the PORB to enable reinstatement of nameplate capacities. The RBEP has been phased into increase capacity via Operational Improvement (Tranche 1); Reinstatement of Nameplate Capacity (Tranche 2) and Expansion (Tranches 3-5)
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment
Tone & Mood
Will generate for 15projects (top by investment value). Estimated time: ~2 min.