Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.
647 published projects6 presentation themesAtlas map modeVoice narration
1Filter projectsby sector, country, stage or programme
2Selectthe projects you want to present
3Create a showwith AID Intelligence and present full screen
The proposed off-dock ICDs/CFSs Integration Program comprise: (1) Relocating all container processing activities from marine yard to CFSs. (2) Simplifying of transfers between marine yard and CFS, and (3) CFSs…
Construction of Ouidah/Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This part of the project relates specifically to the facilities in Togo.
The Noépé One-Stop Border Post (OSBP) is a key infrastructure project on the Abidjan-Lagos Corridor, located at the Ghana-Togo border. The project involves the construction of a modern, integrated border…
Construction of Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This is a Joint Border Control Facility for border control officials from Benin and Togo to jointly undertake border control…
Construction of the Garoua Boulai One-Stop Border Post between Cameroon and Central African Republic on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
TransportCameroon, Central African RepublicCentral Africapap1
The project involves the construction of Koutéré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
The project comprise of the following: (1) complete or initiate dredging of port of Mwanza to restore design depths of generally around 6 m on approach to, in anchorage and…
Construction of a standard gauge railway (2900km) from Lamu Port in Kenya to Juba in South Sudan and Addis Ababa in Ethiopia i.e. LamuGarissa-Isiolo and branching into two links, the…
TransportEthiopia, Kenya, South SudanEast Africa, North-Eastern AfricaIGAD
Construction of a standard gauge railway (2900km) from Lamu Port in Kenya to Juba in South Sudan and Addis Ababa in Ethiopia i.e. LamuGarissa-Isiolo and branching into two links, the…
TransportEthiopia, Kenya, South Sudan, UgandaEast Africa, North-Eastern AfricaIGAD
Develop the Kampala Bombo Expressway to facilitate mobility and trade between Kampala and the major towns of Bombo,Masindi, Kigumba and Gulu, as well as to the neighbouring countries of Sudan…
The RN06 split between Mascara and Bechar for 500km and the RN50 between Bechar and the Algero-Mauritanian fontière for 1700km
The duplication of the RN06 between the town of Mascara with high agricultural potential and that of Bechar in the south and the RN 50 between Bechar and the town…
The project forms part of the upgrading of the 1,200 km of narrow gauge railway between Abidjan and Ouagadougou. In particular it involves the section in Burkina Fasso, from the…
Reconstruction of the cargo and passenger transport system on the Beira-Machipanda railway line, linking the provinces of Sofala and Manica to neighbouring Zimbabwe, via the Machipanda border post, will once…
The project involves rehabilitation of Kalabayd - Hargeisa - Berbera road (221km); and Upgrading of Kalabayd - Togwachalle road section (20km). Also project involves construction of Hargeisa bypass (25km).
The project comprises the following components: (a) Civil works for; (i) Rehabilitation of the Blantyre-Zomba Road (59 km); (ii) Rehabilitation of the Mzuzu-Nkhata Bay Road (47km) - PROJECT ID 658;…
Development of the Waterberg rail system to accommodate coal and other traffic from Botswana through the Waterberg and Rustenburg regions.
The project consists of a study to consider a possible new…
The project involves the construction of a One Stop Border Post between Congo and DRC. Related to this project is the construction of a road/rail bridge between Brazzaville and Kinshasa.
TransportDemocratic Republic of Congo, Republic of CongoCentral Africapap1
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its…
TransportBurundiEast Africapap1
Not reportedTransaction Support & Financial CloseActiveExpress interest →
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its…
The project comprise of the following: (1) complete or initiate dredging of port of Bujumbura to restore design depths of generally around 6 m on approach to, in anchorage and…
Increases terminal capacity to 1.4m TEU pa with additional landside investment. This is achieved by the upgrading of certain stack paving thereby allowing for higher container stacking with increased stack…
The project incorporates a combination of capital expenditure and operational optimisation initiatives to increase the overall coal export system to 81mtpa.
-Major upgrades to the power supply and OHTE
-Running Line upgrades
-Matlabas…
Construction of Central Corridor Standard Gauge Rail (SGR) of the Dar es Salaam-Isaka-Mwanza and Isaka-Kigali / Keza-Gitega-Musongati / Tabora-Kigoma/Uvinza-Musongati-Gitega (with extension to Eastern DRC)T-RL-26-002
The project forms part of the Central Corridor and is designed to improve rail connectivity between the Port of Dar es Salaam and the landlocked countries of Rwanda, Burundi and…
TransportBurundi, Democratic Republic of Congo, Kenya, Rwanda, TanzaniaCentral Africa, East Africa2020
Construction of Standard Gauge railway from Mtwara - Mbamba Bay railway with/and spurs to Liganga, and Mchuchuma (MALAWI SECTION)
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal…
Not reportedTransaction Support & Financial CloseActiveExpress interest →
145
Construction of Standard Gauge railway from Mtwara - Mbamba Bay railway with/and spurs to Liganga, and Mchuchuma (Mozambique Section)
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal…
Not reportedTransaction Support & Financial CloseActiveExpress interest →
146
Construction of Standard Gauge railway from Mtwara - Mbamba Bay railway with/and spurs to Liganga, and Mchuchuma (TANZANIA SECTION)
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal…
Not reportedTransaction Support & Financial CloseActiveExpress interest →
147
Construction of Standard Gauge railway from Mtwara - Mbamba Bay railway with/and spurs to Liganga, and Mchuchuma (Zimbabwe section)
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal…
Not reportedTransaction Support & Financial CloseActiveExpress interest →
148
Construction to standard gauge of the Mombasa – Nairobi – Malaba – Kampala - Kigali line (with Malaba – Nimule – Juba spur (Kenya section)
The project commences at the port city of Mombasa and covers a distance of 480 km to Nairobi and then 120km to Naivasha. It then proceeds 500km westwards to the…
TransportBurundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, UgandaCentral Africa, East Africa, North-Eastern AfricaT.05
Construction to standard gauge of the Mombasa – Nairobi – Malaba – Kampala - Kigali line (with Malaba – Nimule – Juba spur (Rwanda section)
The project commences at the port city of Mombasa and covers a distance of 480 km to Nairobi and then 120km to Naivasha. It then proceeds 500km westwards to the…
TransportBurundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, UgandaCentral Africa, East Africa, North-Eastern AfricaT.05
Construction to standard gauge of the Mombasa – Nairobi – Malaba – Kampala - Kigali line (with Malaba – Nimule – Juba spur (Uganda section)
The project commences at the port city of Mombasa and covers a distance of 480 km to Nairobi and then 120km to Naivasha. It then proceeds 500km westwards to the…
TransportBurundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, UgandaCentral Africa, East Africa, North-Eastern AfricaT.05
TransportT.05.06.01Mombasa Port New Container Terminal
KenyaEast Africapap1
The proposed off-dock ICDs/CFSs Integration Program comprise: (1) Relocating all container processing activities from marine yard to CFSs. (2) Simplifying of transfers between marine yard and CFS, and (3) CFSs enhancing facilities and technical competency to handle increased transfers from marine yard and to service clients.
Construction of Ouidah/Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This part of the project relates specifically to the facilities in Togo.
The Noépé One-Stop Border Post (OSBP) is a key infrastructure project on the Abidjan-Lagos Corridor, located at the Ghana-Togo border. The project involves the construction of a modern, integrated border facility on the Togolese side at Noépé, opposite Aflao in Ghana. The scope includes constructing new administrative buildings, inspection bays, parking areas, and associated infrastructure (water, sanitation, ICT) to facilitate joint border operations. The project is designed to implement the OSBP concept, harmonizing procedures between Ghana and Togo to create a single customs and immigration control point.
Construction of Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This is a Joint Border Control Facility for border control officials from Benin and Togo to jointly undertake border control formalities to reduce border crosing time for goods and persons. OSBT: Straddling.
Cameroon, Central African RepublicCentral Africapap1
Construction of the Garoua Boulai One-Stop Border Post between Cameroon and Central African Republic on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
The project involves the construction of Koutéré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
TransportT.05.04.03Mwanza Port Dredging and Upgrading
TanzaniaEast Africapap1
The project comprise of the following: (1) complete or initiate dredging of port of Mwanza to restore design depths of generally around 6 m on approach to, in anchorage and along Berths; (2) establish a watercourse management system to minimize soil erosion and sedimentation at ports; and (3) rehabilitating or establishing of areas and ramps to accommodate vehicles (in particular MAFI trailers and forklifts) involved with RoRo operations at ports.
Ethiopia, Kenya, South SudanEast Africa, North-Eastern AfricaIGAD
Construction of a standard gauge railway (2900km) from Lamu Port in Kenya to Juba in South Sudan and Addis Ababa in Ethiopia i.e. LamuGarissa-Isiolo and branching into two links, the link to South Sudan (Isiolo-Nginyang-Nakodok-Juba) and link to Ethiopia (Isiolo-Moyale-Addis Ababa). Design speed: (Passenger train) 160 km per hour (Kph), (Freight train) 120 Kph, Gauge: 1,435 mm (Standard Gauge). The railway project preliminary designs are complete for the Kenyan and Ethiopian route and expected to proceed to the Detailed Engineering Design stage. The Government Kenya and the Government of Ethiopia have signed a Bilateral Agreement to jointly pursue the development of the LAPSSET Standard Gauge Railway. A Memorandum of Understanding (MoU) has been signed between LCDA and InterGovernmental Authority on Development (IGAD) to facilitate the financing of this stage though an Infrastructure Project Preparatory Fund (IPPF) available through the New Partnership for African Development (NEPAD).
Ethiopia, Kenya, South Sudan, UgandaEast Africa, North-Eastern AfricaIGAD
Construction of a standard gauge railway (2900km) from Lamu Port in Kenya to Juba in South Sudan and Addis Ababa in Ethiopia i.e. LamuGarissa-Isiolo and branching into two links, the link to South Sudan (Isiolo-Nginyang-Nakodok-Juba) and link to Ethiopia (Isiolo-Moyale-Addis Ababa). Design speed: (Passenger train) 160 km per hour (Kph), (Freight train) 120 Kph, Gauge: 1,435 mm (Standard Gauge). The railway project preliminary designs are complete for the Kenyan and Ethiopian route and expected to proceed to the Detailed Engineering Design stage. The Government Kenya and the Government of Ethiopia have signed a Bilateral Agreement to jointly pursue the development of the LAPSSET Standard Gauge Railway. A Memorandum of Understanding (MoU) has been signed between LCDA and InterGovernmental Authority on Development (IGAD) to facilitate the financing of this stage though an Infrastructure Project Preparatory Fund (IPPF) available through the New Partnership for African Development (NEPAD).
Develop the Kampala Bombo Expressway to facilitate mobility and trade between Kampala and the major towns of Bombo,Masindi, Kigumba and Gulu, as well as to the neighbouring countries of Sudan and the DRC.
TransportThe RN06 split between Mascara and Bechar for 500km and the RN50 between Bechar and the Algero-Mauritanian fontière for 1700km
AlgeriaNorth Africa
The duplication of the RN06 between the town of Mascara with high agricultural potential and that of Bechar in the south and the RN 50 between Bechar and the town of Tindouf to continue to the border with Mauritania. This motorway axis can extend to the town of Choum in Mauritania.The project serves an existing infrastructure asset of another sector, but there is more than 50% overlap in the geography serviced by the proposed project and the other sector existing asset.
The project forms part of the upgrading of the 1,200 km of narrow gauge railway between Abidjan and Ouagadougou. In particular it involves the section in Burkina Fasso, from the border with Ivory Coast to Ouagadougou.
Reconstruction of the cargo and passenger transport system on the Beira-Machipanda railway line, linking the provinces of Sofala and Manica to neighbouring Zimbabwe, via the Machipanda border post, will once again allow people and goods to travel, particularly rural workers along the Beira corridor. This section of railway is of particular importance to Mozambique as it is expected to offer greater dynamism to the strategy of linking different development hubs in the country and neighbouring regions, and improve efficiency in transporting passengers and cargo between points along the railway.
The project involves rehabilitation of Kalabayd - Hargeisa - Berbera road (221km); and Upgrading of Kalabayd - Togwachalle road section (20km). Also project involves construction of Hargeisa bypass (25km).
The project comprises the following components: (a) Civil works for; (i) Rehabilitation of the Blantyre-Zomba Road (59 km); (ii) Rehabilitation of the Mzuzu-Nkhata Bay Road (47km) - PROJECT ID 658; (b) Consultancy services for: (i) Supervision of civil works for the above; (ii) The feasibility and detail engineering design studies for the Ntcheu- NenoTsangano-Mwanza Road; c) Compensation and resettlement and (d) Audit services
Development of the Waterberg rail system to accommodate coal and other traffic from Botswana through the Waterberg and Rustenburg regions.
The project consists of a study to consider a possible new heavy haul line between Lephalale and the Botswana rail network.
Line capacity will be 20mtpa scalable to 40mtpa in single line configuration.
This project is developmental and not purely demand driven.
Democratic Republic of Congo, Republic of CongoCentral Africapap1
The project involves the construction of a One Stop Border Post between Congo and DRC. Related to this project is the construction of a road/rail bridge between Brazzaville and Kinshasa.
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its upgrading are ongoing, NEPAD/IPPF funds;
2) Rumonge-Nyanza Lac (45 km): Works are planned, funds from AfDB;
3) Nyanza Lac-Mugina (45 km): Upgrading completed.
TransportT.08.03.02Bujumbura - Rumonge-Nyanza Lac-Mugina (RN3) Road (168 km)
BurundiEast Africapap1
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its upgrading are ongoing, NEPAD/IPPF funds;
2) Rumonge-Nyanza Lac (45 km): Works are planned, funds from AfDB;
3) Nyanza Lac-Mugina (45 km): Upgrading completed.
The project comprise of the following: (1) complete or initiate dredging of port of Bujumbura to restore design depths of generally around 6 m on approach to, in anchorage and along Berths; (2) establish a watercourse management system to minimize soil erosion and sedimentation at ports; and (3) rehabilitating or establishing of areas and ramps to accommodate vehicles (in particular MAFI trailers and forklifts) involved with RoRo operations at ports.
Increases terminal capacity to 1.4m TEU pa with additional landside investment. This is achieved by the upgrading of certain stack paving thereby allowing for higher container stacking with increased stack capacity. Berth capacity is already at 1.4m TEU pa. With the acquisition of 4x RTG"’s equipment capacity will also be at 1.4m TEU pa. Current stack capacity is limited to 1.0m TEU pa.
The project incorporates a combination of capital expenditure and operational optimisation initiatives to increase the overall coal export system to 81mtpa.
-Major upgrades to the power supply and OHTE
-Running Line upgrades
-Matlabas loop extension
-Rolling Stock Yards
TransportT-RL-26-002Construction of Central Corridor Standard Gauge Rail (SGR) of the Dar es Salaam-Isaka-Mwanza and Isaka-Kigali / Keza-Gitega-Musongati / Tabora-Kigoma/Uvinza-Musongati-Gitega (with extension to Eastern DRC)
Burundi, Democratic Republic of Congo, Kenya, Rwanda, TanzaniaCentral Africa, East Africa2020
The project forms part of the Central Corridor and is designed to improve rail connectivity between the Port of Dar es Salaam and the landlocked countries of Rwanda, Burundi and the Democratic Republic of Congo. The Tabora-Kigoma section, approximately 411 km, is intended to connect with the Dar es Salaam-Tabora-Isaka Standard Gauge Railway. A further Uvinza-Musongati-Gitega railway section extends northwards from Uvinza station on the Tabora-Kigoma line towards Musongati and Gitega. The broader project also incorporates the Isaka-Kigali connection. The Isaka-Kigali SGR was designed for maximum operating speeds of approximately 160 km/h for passenger services and 120 km/h for freight, with electrification and a maximum axle load of 35 tonnes. The project is classified under PIDA PAP 2 as a Transport-Rail project covering Burundi, Rwanda and Tanzania, with the Democratic Republic of Congo identified as a beneficiary country.
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal and Liganga iron ore mines in the south west of Tanzania.
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal and Liganga iron ore mines in the south west of Tanzania.
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal and Liganga iron ore mines in the south west of Tanzania.
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal and Liganga iron ore mines in the south west of Tanzania.
TransportConstruction to standard gauge of the Mombasa – Nairobi – Malaba – Kampala - Kigali line (with Malaba – Nimule – Juba spur (Kenya section)
Burundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, UgandaCentral Africa, East Africa, North-Eastern AfricaT.05
The project commences at the port city of Mombasa and covers a distance of 480 km to Nairobi and then 120km to Naivasha. It then proceeds 500km westwards to the Kenya/Uganda border through Kisumu. On the Ugandan side, the project covers the 250km Malaba - Kampala section and the spur from Tororo to Gulu via Soroti
TransportConstruction to standard gauge of the Mombasa – Nairobi – Malaba – Kampala - Kigali line (with Malaba – Nimule – Juba spur (Rwanda section)
Burundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, UgandaCentral Africa, East Africa, North-Eastern AfricaT.05
The project commences at the port city of Mombasa and covers a distance of 480 km to Nairobi and then 120km to Naivasha. It then proceeds 500km westwards to the Kenya/Uganda border through Kisumu. On the Ugandan side, the project covers the 250km Malaba - Kampala section and the spur from Tororo to Gulu via Soroti
TransportConstruction to standard gauge of the Mombasa – Nairobi – Malaba – Kampala - Kigali line (with Malaba – Nimule – Juba spur (Uganda section)
Burundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, UgandaCentral Africa, East Africa, North-Eastern AfricaT.05
The project commences at the port city of Mombasa and covers a distance of 480 km to Nairobi and then 120km to Naivasha. It then proceeds 500km westwards to the Kenya/Uganda border through Kisumu. On the Ugandan side, the project covers the 250km Malaba - Kampala section and the spur from Tororo to Gulu via Soroti
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment
Tone & Mood
Will generate for 15projects (top by investment value). Estimated time: ~2 min.