Freetown-Monrovia-Abidjan Fibre-optic Link (Liberia section)I.02.18.02
The Government of Liberia"’s development goals for ICT and Telecommunications are to modernize networks and create added value through the effective utilization of ICTs that make use of different technology…
ICTCôte d'Ivoire, Liberia, Sierra LeoneWest Africapap1
Algeria - Tunisia section of ELTAM Transmission Interconnector (Tunisia part)E.09.01.02
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Tunisia…
The project is designed to meet the need for additional liquid bulk capacity through design of a BOT project for a single buoy point or off shore jetty system.
Sudan Section of the Fiber Optic Connectivity Component of the Port Sudan to Douala CorridorI.02.30.09
High-quality ducted fiber corridor linking Port Sudan undersea cable landings to inland Central African states, supporting broadband connectivity to Chad, Central African Republic, Ethiopia, and South Sudan. The corridor positions…
ICTCabo Verde, Central African Republic, Chad, Ethiopia, South Sudan, SudanCentral Africa, North-Eastern Africa, West Africa2020
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of…
RN18 is a 56km road on the Central Corridor along the RN7- RN18- RN16 route and is a conduit for movement of traffic from Tanzania to Gitega and Bujumbura. RN18…
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the 96km Kenyan section of the 2,800km ZTK interconnector, which runs from…
The proposed off-dock ICDs/CFSs Integration Program comprise: (1) Relocating all container processing activities from marine yard to CFSs. (2) Simplifying of transfers between marine yard and CFS, and (3) CFSs…
Construction of a transmission line (580 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The…
ZiZaBoNa Transmission Interconnector (Hwange - Victoria Falls - Livingstone section)E.02.07.01
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project is the first phase…
ZiZaBoNa Transmission Interconnector (Pandamatenga - Victoria Falls section)E.02.07.03
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of…
Construction of Ouidah/Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This part of the project relates specifically to the facilities in Togo.
The Noépé One-Stop Border Post (OSBP) is a key infrastructure project on the Abidjan-Lagos Corridor, located at the Ghana-Togo border. The project involves the construction of a modern, integrated border…
Construction of Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This is a Joint Border Control Facility for border control officials from Benin and Togo to jointly undertake border control…
Construction of the Garoua Boulai One-Stop Border Post between Cameroon and Central African Republic on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
TransportCameroon, Central African RepublicCentral Africapap1
The project involves the construction of Koutéré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
The project comprise of the following: (1) complete or initiate dredging of port of Mwanza to restore design depths of generally around 6 m on approach to, in anchorage and…
The IAS faces multiple constraints; in particular difficulties of access to water resources related to the excessive depth (over 600 m) in some regions. Moreover, the lack of sub-regional strategic…
Burkina Faso-Benin Fibre-optic Link (Burkina Faso section) I.02.22.01
Burkina Faso is already connected to all its neighbors, with the exception of Benin, which is already present in Porga (Border with Burkina). Thus, the realization of this link is fully…
Develop the Kampala Bombo Expressway to facilitate mobility and trade between Kampala and the major towns of Bombo,Masindi, Kigumba and Gulu, as well as to the neighbouring countries of Sudan…
The name ZIZABONA was derived by taking the first two letters of the following country names: Zimbabwe, Zambia, Botswana and Namibia. It is a 400/330kV Interconnector line envisaged to establish…
Lusaka - Lilongwe Fibre-optic Link (Zambia section)I.02.19.01
The project entails the installation of the Zambia section of the 600 km fibre-optic link between Lusaka and Lilongwe: from Lusaka to the border with Malawi.
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
The project forms part of the upgrading of the 1,200 km of narrow gauge railway between Abidjan and Ouagadougou. In particular it involves the section in Burkina Fasso, from the…
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
The project is code named "ANNA" meaning the interconnection between Angola and Namibia. The proposed interconnector involves the construction of power transmission routed via the proposed Baynes Hydropower Plant in…
Reconstruction of the cargo and passenger transport system on the Beira-Machipanda railway line, linking the provinces of Sofala and Manica to neighbouring Zimbabwe, via the Machipanda border post, will once…
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
The project involves rehabilitation of Kalabayd - Hargeisa - Berbera road (221km); and Upgrading of Kalabayd - Togwachalle road section (20km). Also project involves construction of Hargeisa bypass (25km).
ICTI.02.18.02Freetown-Monrovia-Abidjan Fibre-optic Link (Liberia section)
Côte d'Ivoire, Liberia, Sierra LeoneWest Africapap1
The Government of Liberia"’s development goals for ICT and Telecommunications are to modernize networks and create added value through the effective utilization of ICTs that make use of different technology solutions. Through this policy agenda and recognizing the essential social and economic potentials of broadband connectivity, the Government of Liberia including its development partners and local industry players facilitated Liberia"’s connection to the global community through the ACE Communication Network.
Liberia has since 2013 had access to broadband interconnection to the rest of the world via ACE. However, this connectivity does not extend outside the capital, Monrovia, since service providers transmission links does not have the necessary capacity required for broadband services.
The proposed development of a National ICT Backbone is a key initiative expected to provide the necessary connectivity infrastructure which will carry the volume of data traffic that is projected in the coming years and increase the diffusion of broadband access in order to reap the development benefits.
EnergyE.09.01.02Algeria - Tunisia section of ELTAM Transmission Interconnector (Tunisia part)
Algeria, TunisiaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Tunisia part of the 220 km / 400 kV Algeria to Tunisia section from the Algeria border to Jendouba in Tunisia.
TransportT.05.06.02Mombasa Port New Petroleum Facility
KenyaEast Africapap1
The project is designed to meet the need for additional liquid bulk capacity through design of a BOT project for a single buoy point or off shore jetty system.
ICTI.02.30.09Sudan Section of the Fiber Optic Connectivity Component of the Port Sudan to Douala Corridor
Cabo Verde, Central African Republic, Chad, Ethiopia, South Sudan, SudanCentral Africa, North-Eastern Africa, West Africa2020
High-quality ducted fiber corridor linking Port Sudan undersea cable landings to inland Central African states, supporting broadband connectivity to Chad, Central African Republic, Ethiopia, and South Sudan. The corridor positions Sudan as a digital gateway for landlocked Sahel countries, reducing satellite reliance particularly for humanitarian actors. Technical design specifies high-quality ducted fiber at 130-170 cm depth with multi-mode capacity and distributed open access points. Project implementation has been severely constrained by ongoing conflict in Sudan since 2023, though humanitarian telecommunications infrastructure has been activated at Port Sudan landing sites.
The proposed project addresses enlargement of the regional ICT coverage by providing services for unconnected customers with satisfied and affordable quality and prices. Moreover crossing border cable will significantly contribute in injecting new communities and activities across its route as well as additive job opportunities.
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of a 231 km / 330 kV transmission interconnector from Livingstone Substation (Zambia) to Zambezi Substation at Katima (Botswana), with a transmission capacity of 300 MW. Here it joins the Caprivi HVDC link.
RN18 is a 56km road on the Central Corridor along the RN7- RN18- RN16 route and is a conduit for movement of traffic from Tanzania to Gitega and Bujumbura. RN18 requires upgrading from gravel to asphalt concrete and expansion of the carriageway from 6 metres to 7 metres.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the 96km Kenyan section of the 2,800km ZTK interconnector, which runs from Arusha in Tanzania to Isinya in Kenya. In Kenya, the line will be linked to the high-voltage direct current interconnector between Kenya and Ethiopia
TransportT.05.06.01Mombasa Port New Container Terminal
KenyaEast Africapap1
The proposed off-dock ICDs/CFSs Integration Program comprise: (1) Relocating all container processing activities from marine yard to CFSs. (2) Simplifying of transfers between marine yard and CFS, and (3) CFSs enhancing facilities and technical competency to handle increased transfers from marine yard and to service clients.
EnergyE.02.02.01GERD (Ethiopia)- Khartoum (Sudan)Transmission Line
Ethiopia, SudanNorth-Eastern AfricaIGAD
Construction of a transmission line (580 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The interconnector will have a transmission capacity of 3000 MW.
The Project also includes two new, 500kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).Â
Construction of a 500kV transmission line and the associated substations that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The line will be 580 km in total, 564 km in Sudan, terminating in Khartoum, 16 km in Ethiopia, terminating at the Grand Renaissance Dam. The Project also includes two new, 500 kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).
It is expected that the project would assist the two partners to obtain the following specific benefits: to promote power system stability in the countries concerned; to promote energy connectivity among the countries by assisting them to integrate their respective networks and thereby develop ability for building larger power projects to meet larger regional markets; to develop ability to negotiate better terms for procurement of power equipment and technical assistance; to reduce the cost of power in both countries; in the long term, complete integration of the power systems in Egypt and Sudan; and to create productive employment and economic development across the borders. The main objectives of the project include provision of transmission capacity to cater for grid interconnection between Egypt and Sudan, provision of transmission infrastructure to cater for future grid interconnections to other countries, promotion of regional cooperation through sharing of power generation resources and facilitation of rural electrification and improve the standard of living for the population in project areas
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project is the first phase of the bigger ZiZaBoNa project and involves the construction of a 101 km / 330 kV transmission interconnector from Hwange Power Station to Victoria Falls Substation in Zimbabwe and construction of the 14km Victoria Falls to Livingstone cross-border link with a transmission capacity of 300 MW.
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of a 76 km / 330 kV transmission interconnector from Pandamatenga Substation (Botswana) to Victoria Falls Substation (Zimbabwe), with a transmission capacity of 300 MW.
Construction of Ouidah/Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This part of the project relates specifically to the facilities in Togo.
The Noépé One-Stop Border Post (OSBP) is a key infrastructure project on the Abidjan-Lagos Corridor, located at the Ghana-Togo border. The project involves the construction of a modern, integrated border facility on the Togolese side at Noépé, opposite Aflao in Ghana. The scope includes constructing new administrative buildings, inspection bays, parking areas, and associated infrastructure (water, sanitation, ICT) to facilitate joint border operations. The project is designed to implement the OSBP concept, harmonizing procedures between Ghana and Togo to create a single customs and immigration control point.
Construction of Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This is a Joint Border Control Facility for border control officials from Benin and Togo to jointly undertake border control formalities to reduce border crosing time for goods and persons. OSBT: Straddling.
Cameroon, Central African RepublicCentral Africapap1
Construction of the Garoua Boulai One-Stop Border Post between Cameroon and Central African Republic on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
The project involves the construction of Koutéré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
TransportT.05.04.03Mwanza Port Dredging and Upgrading
TanzaniaEast Africapap1
The project comprise of the following: (1) complete or initiate dredging of port of Mwanza to restore design depths of generally around 6 m on approach to, in anchorage and along Berths; (2) establish a watercourse management system to minimize soil erosion and sedimentation at ports; and (3) rehabilitating or establishing of areas and ramps to accommodate vehicles (in particular MAFI trailers and forklifts) involved with RoRo operations at ports.
The IAS faces multiple constraints; in particular difficulties of access to water resources related to the excessive depth (over 600 m) in some regions. Moreover, the lack of sub-regional strategic water resources management has led to changes in aquifer hydro-dynamics and water quality degradation. It constitutes the main perennial resource of potable water and a strategic resource for the sustainable development of the concerned countries.
ICTI.02.22.01Burkina Faso-Benin Fibre-optic Link (Burkina Faso section)
Benin, Burkina FasoWest Africapap1
Burkina Faso is already connected to all its neighbors, with the exception of Benin, which is already present in Porga (Border with Burkina). Thus, the realization of this link is fully integrated into PIDA PAP 2020 and the ECOWAS Regional Connectivity Integration Strategy, which has made the development of broadband infrastructure among Member States a priority. This link will be integrated into the network currently being deployed as part the National Backbone Telecommunications Project (PBNT), of which Fada N'Gourma is a main node of the national and international transmission network.
The section goes from Fada N'Grouma to Benin border at Porga where the physical interconnection of the optical cables will be realized with Benin Telecoms.
The passive infrastructure includes two HDPE tubes, one of which will contain a 36-core G.652D cable. The length of the network is 160 km. The transmission network is IP-MPLS over OTN over DWDM with a transport capacity at the installation of 100 G. One point of presence will be created halfway to Pama.
Develop the Kampala Bombo Expressway to facilitate mobility and trade between Kampala and the major towns of Bombo,Masindi, Kigumba and Gulu, as well as to the neighbouring countries of Sudan and the DRC.
The name ZIZABONA was derived by taking the first two letters of the following country names: Zimbabwe, Zambia, Botswana and Namibia. It is a 400/330kV Interconnector line envisaged to establish the required infrastructure to interconnect the countries as indicated above. The project will enable the wheeling of power north south or vice versa via the Zambezi HVDC Link. The ZIZABONA project components include a direct line from Mukuni (previosuly known as Livingstone) to Zambezi together with a radial connection from Victoria Falla to Pandamatenga.
The project consists of the construction of the following key transmission lines;
Zimbabwe (Hwange) - Zambia Livingstone (Mukuni) - 101km (Hwange to border) and 14km (border to Mukuni)
Zimbabwe (Victoria Falls) - Botswana (Pandamatenga) - 76km
Zambia (Mukuni) - Namibia (Zambezi) - 231km
ICTI.02.19.01Lusaka - Lilongwe Fibre-optic Link (Zambia section)
Malawi, ZambiaSouthern Africapap1
The project entails the installation of the Zambia section of the 600 km fibre-optic link between Lusaka and Lilongwe: from Lusaka to the border with Malawi.
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.
The AXIS Project is being implemented through two phases. Phase I consists of capacity building to support the establishment of national IXPs through providing a series of two workshops for stakeholders and the Internet Service Provider Association (ISPA) on I) best practice and benefits of IXP and II) technical assistance through workshops which will cover the technical and administrative skills needed to set up, operate, and administer an IXP.
Phase II focuses on supporting establishment of Regional IXP and Regional Internet Carrier through provisioning Capacity building workshops on best practice and benefits of setting up RIXP/IC and providing technical assistance.
The AXIS Project is a flagship project of the African Regional Action Plan on Knowledge Economy (ARAPKE) endorsed by the African Union Executive Council.
The Burkina Faso Exchange Point was set up through the AXIS and ISOC Skills Building Program and the World Bank through WARCIP (West Africa Regional Communications Infrastructure Program) for acquisition, installation and configuration IXP equipments and the layout of the technical room.
A non-profit association bringing together operators, internet service providers and research centers is set up to exploit and develop the platform. The association is called BFIX (http://www.bfix.bf/)
The project forms part of the upgrading of the 1,200 km of narrow gauge railway between Abidjan and Ouagadougou. In particular it involves the section in Burkina Fasso, from the border with Ivory Coast to Ouagadougou.
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.
The AXIS Project is being implemented through two phases. Phase I consists of capacity building to support the establishment of national IXPs through providing a series of two workshops for stakeholders and the Internet Service Provider Association (ISPA) on I) best practice and benefits of IXP and II) technical assistance through workshops which will cover the technical and administrative skills needed to set up, operate, and administer an IXP.
Phase II focuses on supporting establishment of Regional IXP and Regional Internet Carrier through provisioning Capacity building workshops on best practice and benefits of setting up RIXP/IC and providing technical assistance.
The AXIS Project is a flagship project of the African Regional Action Plan on Knowledge Economy (ARAPKE) endorsed by the African Union Executive Council.
The project is code named "ANNA" meaning the interconnection between Angola and Namibia. The proposed interconnector involves the construction of power transmission routed via the proposed Baynes Hydropower Plant in Lower Kunene, Namibia, to link the Namibian and Angolan electricity networks in the north western part of Namiiba and the southern part of Angola.
Reconstruction of the cargo and passenger transport system on the Beira-Machipanda railway line, linking the provinces of Sofala and Manica to neighbouring Zimbabwe, via the Machipanda border post, will once again allow people and goods to travel, particularly rural workers along the Beira corridor. This section of railway is of particular importance to Mozambique as it is expected to offer greater dynamism to the strategy of linking different development hubs in the country and neighbouring regions, and improve efficiency in transporting passengers and cargo between points along the railway.
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.
The AXIS Project is being implemented through two phases. Phase I consists of capacity building to support the establishment of national IXPs through providing a series of two workshops for stakeholders and the Internet Service Provider Association (ISPA) on I) best practice and benefits of IXP and II) technical assistance through workshops which will cover the technical and administrative skills needed to set up, operate, and administer an IXP.
Phase II focuses on supporting establishment of Regional IXP and Regional Internet Carrier through provisioning Capacity building workshops on best practice and benefits of setting up RIXP/IC and providing technical assistance.
The AXIS Project is a flagship project of the African Regional Action Plan on Knowledge Economy (ARAPKE) endorsed by the African Union Executive Council.
The project involves rehabilitation of Kalabayd - Hargeisa - Berbera road (221km); and Upgrading of Kalabayd - Togwachalle road section (20km). Also project involves construction of Hargeisa bypass (25km).
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment
Tone & Mood
Will generate for 15projects (top by investment value). Estimated time: ~2 min.