The proposed project road is one of the six (6) international trunk routes connecting Zimbabwe with the neighbouring countries of Botswana and South Africa Overall, it is intended that the proposed…
TransportBotswana, South Africa, Zambia, ZimbabweSouthern Africapap1
Chirundu - Harare Road Link 1 (Chirundu Border Post - Makuti - Hells Gate)T.06.03.03.01
The Chirundu - Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of…
The project is designed to meet the need for additional liquid bulk capacity through design of a BOT project for a single buoy point or off shore jetty system.
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of…
RN18 is a 56km road on the Central Corridor along the RN7- RN18- RN16 route and is a conduit for movement of traffic from Tanzania to Gitega and Bujumbura. RN18…
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the 96km Kenyan section of the 2,800km ZTK interconnector, which runs from…
The proposed off-dock ICDs/CFSs Integration Program comprise: (1) Relocating all container processing activities from marine yard to CFSs. (2) Simplifying of transfers between marine yard and CFS, and (3) CFSs…
Construction of a transmission line (580 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The…
ZiZaBoNa Transmission Interconnector (Hwange - Victoria Falls - Livingstone section)E.02.07.01
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project is the first phase…
Lomahasha / Namaacha Cross Border Potable Water Supply Project
Preparation of preliminary/detailed designs and construction of Phase II of Lomahasha and Siteki (Phase II in Swaziland),and Namaacha Water Supply Project. This phase will ensure water supply to the Lomahasha…
The project comprise of the following: (1) complete or initiate dredging of port of Mwanza to restore design depths of generally around 6 m on approach to, in anchorage and…
The project is code named "ANNA" meaning the interconnection between Angola and Namibia. The proposed interconnector involves the construction of power transmission routed via the proposed Baynes Hydropower Plant in…
Reconstruction of the cargo and passenger transport system on the Beira-Machipanda railway line, linking the provinces of Sofala and Manica to neighbouring Zimbabwe, via the Machipanda border post, will once…
The project comprises the following components: (a) Civil works for; (i) Rehabilitation of the Blantyre-Zomba Road (59 km); (ii) Rehabilitation of the Mzuzu-Nkhata Bay Road (47km) - PROJECT ID 658;…
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its…
TransportBurundiEast Africapap1
Not reportedTransaction Support & Financial CloseActiveExpress interest →
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its…
The project comprise of the following: (1) complete or initiate dredging of port of Bujumbura to restore design depths of generally around 6 m on approach to, in anchorage and…
O projecto faz parte da interligação de transmissão Inga-Cabinda-Pointe Noire, ligando os sistemas de energia da RDC, Angola e Congo, com uma capacidade de transferência de 600 MW.
EnergyAngola, Democratic Republic of CongoCentral Africa, Southern Africapap1
Establishing Forbes/ Machipanda One-Stop Border Post (OSBP). Zimbabwe has prepared improvement plans for both Forbes and Nyamapanda that have been ready since 2005 but have not been implemented. The improvement…
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya -…
TransportEthiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The Grand Ethiopian Renaissance Dam (GERD ) formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is a gravity dam on the Blue Nile River in…
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya -…
TransportEthiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
Construction of a petroleum pipeline between Eldoret, Kenya and Kampala, Uganda. This involves the section from the border with Kenya to Kampala, Uganda.
The project comprise of the following: (1) complete or initiate dredging of port of Kigoma to restore design depths of generally around 6 m on approach to, in anchorage and…
Kinshasa - Kigali/Bujumbura Fibre-optic Link (DRC section)I.02.08.01
Construction of DRC section of the fibre optic link between Kinshasa (DRC) and Kigali/Bujumbura (Rwanda/Burundi).
EDIT : This project involves the roll out of a fiber optic backbone linked to regional…
ICTBurundi, Democratic Republic of Congo, RwandaCentral Africa, East Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya -…
TransportEthiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya -…
TransportEthiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The Lobito Dry Port is a major logistics platform under development in Angola, designed to serve as a critical inland container depot (ICD) and transshipment hub for the Lobito Corridor.…
The Lobito Port Upgrading project is a major infrastructure initiative in Angola aimed at modernizing and expanding the Port of Lobito to increase its capacity and efficiency. The project scope…
This project is the Zimbabwe section of the Beira - Harare railway (rail component of the Beira multimodal corridor), from the Mozambique border at Machipanda, to the capital Harare.
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
The project entails the construction of a 200 km, 400 kV(initially 220 kV) power line from Matambo substation, in Mozambique, to Phombeya, north of Blantyre. The first assignment will involve…
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road is described as
1) Rumonge-Nyanza Lac (45 km): Works are planned,…
Tororo - Gulu - Pakwach Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.03
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
Botswana, South Africa, Zambia, ZimbabweSouthern Africapap1
The proposed project road is one of the six (6) international trunk routes connecting Zimbabwe with the neighbouring countries of Botswana and South Africa Overall, it is intended that the proposed intervention will reduce travel costs for road users as well as maintenance costs for the Government. A major objective is to help improve road safety conditions for international and regional traffic and for local residents
The project road starts from the Bulawayo Main Post Office and ends at the intersection* with the Masvingo road about 4 km north of the international border area. The approximate limits of the subject Project road are indicated in Map.
TransportT.06.03.03.01Chirundu - Harare Road Link 1 (Chirundu Border Post - Makuti - Hells Gate)
ZimbabweSouthern Africapap1
The Chirundu - Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km. The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. Llink 1 runs a distance of 75 km from Chirundu Border Post to Hells Gate.
TransportT.05.06.02Mombasa Port New Petroleum Facility
KenyaEast Africapap1
The project is designed to meet the need for additional liquid bulk capacity through design of a BOT project for a single buoy point or off shore jetty system.
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of a 231 km / 330 kV transmission interconnector from Livingstone Substation (Zambia) to Zambezi Substation at Katima (Botswana), with a transmission capacity of 300 MW. Here it joins the Caprivi HVDC link.
RN18 is a 56km road on the Central Corridor along the RN7- RN18- RN16 route and is a conduit for movement of traffic from Tanzania to Gitega and Bujumbura. RN18 requires upgrading from gravel to asphalt concrete and expansion of the carriageway from 6 metres to 7 metres.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the 96km Kenyan section of the 2,800km ZTK interconnector, which runs from Arusha in Tanzania to Isinya in Kenya. In Kenya, the line will be linked to the high-voltage direct current interconnector between Kenya and Ethiopia
TransportT.05.06.01Mombasa Port New Container Terminal
KenyaEast Africapap1
The proposed off-dock ICDs/CFSs Integration Program comprise: (1) Relocating all container processing activities from marine yard to CFSs. (2) Simplifying of transfers between marine yard and CFS, and (3) CFSs enhancing facilities and technical competency to handle increased transfers from marine yard and to service clients.
EnergyE.02.02.01GERD (Ethiopia)- Khartoum (Sudan)Transmission Line
Ethiopia, SudanNorth-Eastern AfricaIGAD
Construction of a transmission line (580 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The interconnector will have a transmission capacity of 3000 MW.
The Project also includes two new, 500kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).Â
Construction of a 500kV transmission line and the associated substations that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The line will be 580 km in total, 564 km in Sudan, terminating in Khartoum, 16 km in Ethiopia, terminating at the Grand Renaissance Dam. The Project also includes two new, 500 kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).
It is expected that the project would assist the two partners to obtain the following specific benefits: to promote power system stability in the countries concerned; to promote energy connectivity among the countries by assisting them to integrate their respective networks and thereby develop ability for building larger power projects to meet larger regional markets; to develop ability to negotiate better terms for procurement of power equipment and technical assistance; to reduce the cost of power in both countries; in the long term, complete integration of the power systems in Egypt and Sudan; and to create productive employment and economic development across the borders. The main objectives of the project include provision of transmission capacity to cater for grid interconnection between Egypt and Sudan, provision of transmission infrastructure to cater for future grid interconnections to other countries, promotion of regional cooperation through sharing of power generation resources and facilitation of rural electrification and improve the standard of living for the population in project areas
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project is the first phase of the bigger ZiZaBoNa project and involves the construction of a 101 km / 330 kV transmission interconnector from Hwange Power Station to Victoria Falls Substation in Zimbabwe and construction of the 14km Victoria Falls to Livingstone cross-border link with a transmission capacity of 300 MW.
WaterLomahasha / Namaacha Cross Border Potable Water Supply Project
Eswatini, MozambiqueSouthern Africa
Preparation of preliminary/detailed designs and construction of Phase II of Lomahasha and Siteki (Phase II in Swaziland),and Namaacha Water Supply Project. This phase will ensure water supply to the Lomahasha area in Swaziland and extending it to the Namaacha town in Mozambique through a memorandum of understanding for supply of water to communities residing along common borders of the two countries. It aims to supply a total population of 100 000 people with a safe drinking water supply and sanitation service as well as irrigating 1,000 hectares of land. The project aims to: - Improve health of the residents; - Promote economic activity; - Create employment opportunities; - Increase food security and reduction of poverty; and - Provide additional revenue for the water utilities. The project began as the Siteki Lomahasha water supply project, funded under the Government of Swaziland capital projects budget. Due to the financial constraints, the Corporation concentrated on the Siteki component which is now almost complete. Fiscal constraints also resulted in the suspension of the Lomahasha component, pending further identification of infrastructure funding possibilities.
TransportT.05.04.03Mwanza Port Dredging and Upgrading
TanzaniaEast Africapap1
The project comprise of the following: (1) complete or initiate dredging of port of Mwanza to restore design depths of generally around 6 m on approach to, in anchorage and along Berths; (2) establish a watercourse management system to minimize soil erosion and sedimentation at ports; and (3) rehabilitating or establishing of areas and ramps to accommodate vehicles (in particular MAFI trailers and forklifts) involved with RoRo operations at ports.
The project is code named "ANNA" meaning the interconnection between Angola and Namibia. The proposed interconnector involves the construction of power transmission routed via the proposed Baynes Hydropower Plant in Lower Kunene, Namibia, to link the Namibian and Angolan electricity networks in the north western part of Namiiba and the southern part of Angola.
Reconstruction of the cargo and passenger transport system on the Beira-Machipanda railway line, linking the provinces of Sofala and Manica to neighbouring Zimbabwe, via the Machipanda border post, will once again allow people and goods to travel, particularly rural workers along the Beira corridor. This section of railway is of particular importance to Mozambique as it is expected to offer greater dynamism to the strategy of linking different development hubs in the country and neighbouring regions, and improve efficiency in transporting passengers and cargo between points along the railway.
The project comprises the following components: (a) Civil works for; (i) Rehabilitation of the Blantyre-Zomba Road (59 km); (ii) Rehabilitation of the Mzuzu-Nkhata Bay Road (47km) - PROJECT ID 658; (b) Consultancy services for: (i) Supervision of civil works for the above; (ii) The feasibility and detail engineering design studies for the Ntcheu- NenoTsangano-Mwanza Road; c) Compensation and resettlement and (d) Audit services
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its upgrading are ongoing, NEPAD/IPPF funds;
2) Rumonge-Nyanza Lac (45 km): Works are planned, funds from AfDB;
3) Nyanza Lac-Mugina (45 km): Upgrading completed.
TransportT.08.03.02Bujumbura - Rumonge-Nyanza Lac-Mugina (RN3) Road (168 km)
BurundiEast Africapap1
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections:
1) Bujumbura-Rumonge (78 km): Studies of its upgrading are ongoing, NEPAD/IPPF funds;
2) Rumonge-Nyanza Lac (45 km): Works are planned, funds from AfDB;
3) Nyanza Lac-Mugina (45 km): Upgrading completed.
The project comprise of the following: (1) complete or initiate dredging of port of Bujumbura to restore design depths of generally around 6 m on approach to, in anchorage and along Berths; (2) establish a watercourse management system to minimize soil erosion and sedimentation at ports; and (3) rehabilitating or establishing of areas and ramps to accommodate vehicles (in particular MAFI trailers and forklifts) involved with RoRo operations at ports.
Angola, Democratic Republic of CongoCentral Africa, Southern Africapap1
O projecto faz parte da interligação de transmissão Inga-Cabinda-Pointe Noire, ligando os sistemas de energia da RDC, Angola e Congo, com uma capacidade de transferência de 600 MW.
Establishing Forbes/ Machipanda One-Stop Border Post (OSBP). Zimbabwe has prepared improvement plans for both Forbes and Nyamapanda that have been ready since 2005 but have not been implemented. The improvement plans envisage the expansion of the border control area and building of additional facilities and infrastructure. The existing Forbes border post building is currently under renovation and expansion to accommodate commercial office and increasing space in the travellers' clearance hall.
Ethiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.
The project is divided into four sections as follows:
Lamu - Garissa Road -263km
Garissa-Isiolo Road - 305km
Isiolo - Nginyang Road - 212km
Nginyang - Lokichar - Nadapal - 533km
NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.
The Grand Ethiopian Renaissance Dam (GERD ) formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is a gravity dam on the Blue Nile River in Ethiopia currently under construction. It is in the Benishangul-Gumuz Region of Ethiopia, about 40 km east of the border with Sudan. At 6,000 MW, the dam will be the largest hydroelectric power plant in Africa when completed, as well as the 8th largest in the world. The reservoir at 72 billion cubic meters will be one of the continent's largest. According to the Ethiopian government, as of June  2017, the Dam is 60% complete.
Ethiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.
The project is divided into four sections as follows:
Lamu - Garissa Road -263km
Garissa-Isiolo Road - 305km
Isiolo - Nginyang Road - 212km
Nginyang - Lokichar - Nadapal - 533km
NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.
Construction of a petroleum pipeline between Eldoret, Kenya and Kampala, Uganda. This involves the section from the border with Kenya to Kampala, Uganda.
The project comprise of the following: (1) complete or initiate dredging of port of Kigoma to restore design depths of generally around 6 m on approach to, in anchorage and along Berths; (2) establish a watercourse management system to minimize soil erosion and sedimentation at ports; and (3) rehabilitating or establishing of areas and ramps to accommodate vehicles (in particular MAFI trailers and forklifts) involved with RoRo operations at ports.
ICTI.02.08.01Kinshasa - Kigali/Bujumbura Fibre-optic Link (DRC section)
Burundi, Democratic Republic of Congo, RwandaCentral Africa, East Africapap1
Construction of DRC section of the fibre optic link between Kinshasa (DRC) and Kigali/Bujumbura (Rwanda/Burundi).
EDIT : This project involves the roll out of a fiber optic backbone linked to regional network to improve quality and
reduce costs of communications services. The project links the DRC to Rwanda and Burundi and to the
East African countries networks and will offer redundancy loops for these networks with DRC and the
countries in the region.
Ethiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.
The project is divided into four sections as follows:
Lamu - Garissa Road -263km
Garissa-Isiolo Road - 305km
Isiolo - Nginyang Road - 212km
Nginyang - Lokichar - Nadapal - 533km
NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.
Ethiopia, Kenya, South SudanEast Africa, North-Eastern Africapap1
The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.
The project is divided into four sections as follows:
Lamu - Garissa Road -263km
Garissa-Isiolo Road - 305km
Isiolo - Nginyang Road - 212km
Nginyang - Lokichar - Nadapal - 533km
NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.
The Lobito Dry Port is a major logistics platform under development in Angola, designed to serve as a critical inland container depot (ICD) and transshipment hub for the Lobito Corridor. The project involves the construction of a dry port facility with a planned warehousing area of 10,000 hectares. Key components include container yards, customs facilities, bonded warehouses, cargo handling equipment, and road/rail connectivity to the Port of Lobito. The project is a key component of the broader Lobito Corridor development, which connects the Angolan coast to the Democratic Republic of the Congo (DRC) and Zambia.
The Lobito Port Upgrading project is a major infrastructure initiative in Angola aimed at modernizing and expanding the Port of Lobito to increase its capacity and efficiency. The project scope includes the expansion of the port area by 80,000 m2, the upgrading of existing dry dock facilities, and the construction of a new mineral terminal covering 150,000 m2 to serve the Lobito Corridor's mining exports. Key technical components involve deepening the access channel and berths, installing new cargo handling equipment (including gantry cranes), and constructing modern warehouses and container yards. The project is a critical node in the Lobito Atlantic Corridor, linking the port to the interior of Angola, the Democratic Republic of the Congo (DRC), and Zambia.
This project is the Zimbabwe section of the Beira - Harare railway (rail component of the Beira multimodal corridor), from the Mozambique border at Machipanda, to the capital Harare.
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.
The AXIS Project is being implemented through two phases. Phase I consists of capacity building to support the establishment of national IXPs through providing a series of two workshops for stakeholders and the Internet Service Provider Association (ISPA) on I) best practice and benefits of IXP and II) technical assistance through workshops which will cover the technical and administrative skills needed to set up, operate, and administer an IXP.
Phase II focuses on supporting establishment of Regional IXP and Regional Internet Carrier through provisioning Capacity building workshops on best practice and benefits of setting up RIXP/IC and providing technical assistance.
The AXIS Project is a flagship project of the African Regional Action Plan on Knowledge Economy (ARAPKE) endorsed by the African Union Executive Council.
The project entails the construction of a 200 km, 400 kV(initially 220 kV) power line from Matambo substation, in Mozambique, to Phombeya, north of Blantyre. The first assignment will involve the design, supply and installation of the 400 kV overhead transmission line from the Mozambique-Malawi border to a new substation at Phombeya. The second assignment will entail the design, supply and installation of the new 400 kV Phombeya substation. Other assignments include extension of Matambo substation (Mozambique) and upgrading of SCADA systems (EDM).
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road is described as
1) Rumonge-Nyanza Lac (45 km): Works are planned, funds from BADEA;
TransportT.05.05.01.03Tororo - Gulu - Pakwach Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Tororo to Gulu to Pakwach in Uganda.
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones