Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.
647 published projects6 presentation themesAtlas map modeVoice narration
1Filter projectsby sector, country, stage or programme
2Selectthe projects you want to present
3Create a showwith AID Intelligence and present full screen
Widening of the road from 6m to 7m with a paved shoulder to harmonise with EAC standard. The Muyinga-Gitega road is about 104 km on the RN12. This road forms…
La réalisation du projet se fera en deux phases suivant le financement actuel.Il comprend des travaux routiers, des mesures de facilitation de transport et d'autres activités connexes de développement. La…
TransportGabon, Republic of CongoCentral Africapap1
The project involves the extension of Chingola - Solwezi Railway to the border with Angola at Jimbe, to service new mines in the Copperbelt region. Angola has already commenced construction from…
TransportAngola, Democratic Republic of Congo, ZambiaCentral Africa, Southern Africapap1
The project involves the construction of the Koukoutamba multi-purpose dam (previously known as Gourbassy dam) between Mali and Senegal.
A feasibility study and preliminary design for the Gourbassy Dam was completed by…
Strategically located half-way down the coast of Namibia, with direct access to principal shipping routes, Walvis Bay is a natural gateway for international trade. Walvis Bay is Namibia's largest commercial…
Egypt - Libya section of ELTAM Transmission Interconnector (Egypt part)E.09.03.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Egypt…
ZTK Transmission Interconnector (Tanzania section - Iringa to Shinyanga)E.02.03.01
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga…
ZTK Transmission Interconnector (Tanzania section - Singida to Namanga) E.02.03.01
Construction of a transmission linethat connects the power networks ofTanzania and Kenya. This projectincludes the section of 414km of400kV transmission line from Singidato Namanga via Arusha. The designcapacity is 2,000MW.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project initially included the section of 400kV, 1134km bidirectional Tanzanian section of the 2,800km ZTK…
The project involves the modernisation of the Dar es Salaam Port, including upgrade to berths 1 to 7, deepening of the harbour, improveing cargo handling and port layout.
Serenje - Nakonde Road Link 1 (Serenje - Mpika)T.06.03.01.01
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
TransportBotswana, Malawi, Namibia, Republic of Congo, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The project involves the construction of a new coal terminal at Beira port. A 50 ha site has been set aside for this purpsoe. The terminal is intended to process…
The project is part of the Inga-Cabinda-Pointe Noire transmission interconnector, linking the power systems of DRC, Angola and Congo, with a transfer capacity of 600 MW. The project involves the…
EnergyAngola, Democratic Republic of CongoCentral Africa, Southern Africapap1
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The proposed 330 kV line is approximately 300…
The Kayanza- Bugarama road is about 59 km on the RN1. It originates from Bugarama and terminates in Kayanza City. This road forms part of the trade route with Rwanda.
Nyahua-Chaya, Urambo-Kaliua, Kazirambwa-Chagu and Malagarasi-Uvinza RoadsT.08.03.16
The project involves upgrading of missing links along part of the Central Corridor of Manyoni-Itigi-Tabora-Urambo-Kaliua-Kigoma: Nyahua to Chaya (90km), Urambo to Kaliua (33km), Kazirambwa to Chagu (40km) and Malagarasi to…
Serenje - Nakonde Road Link 3 (Chinsali - Nakonde)T.06.03.01.03
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
TransportBotswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km ZTK interconnector from…
Algeria - Tunisia section of ELTAM Transmission Interconnector (Algeria part)E.09.01.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Algeria…
Harare - Beitbridge Road Link 4 (Turn Off to Beitbridge Border Post)T.06.03.03.08
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of…
The Sena line runs from Limbe (going through Chiromo where the railway line crosses the Shire River, where the culvert has been washed away and Nsanje) to Marka, the border…
Libya - Tunisia section of ELTAM Transmission Interconnector (Libya part)E.09.02.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Libya…
Serenje - Nakonde Road Link 2 (Mpika - Chinsali)T.06.03.01.02
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
TransportBotswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
Harare - Beitbridge Road Link 2 (Chivhu to Masvingo)T.06.03.03.06
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km.The Harare-Beitbridge road is part of the…
ZTK Transmission Interconnector (Tanzania section -Mbeya to Tunduma) E.02.03.01
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 400kV, 292km Iringa - Kisada - Mbeya transmission line,Â…
Harare - Beitbridge Road Link 1 (Harare to Chivhu)T.06.03.03.05
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of…
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The project involves the construction of approximately 350…
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project…
Construction of Amilcar Cabral Submarine Cable SystemI.02.30.02
The Amilcar Cabral Submarine Cable System (ACSCS) is a 3,555 km submarine fibre optic cable project connecting Cabo Verde, The Gambia, Guinea, Guinea-Bissau, Liberia, and Sierra Leone. The system comprises…
ICTAlgeria, Cabo Verde, Gambia, Guinea, Guinea-Bissau, Liberia, Sierra LeoneNorth Africa, West Africa2020
The project involves the construction of the Kousséré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
The road runs in a south westernly direction from Bulawayo to the Beitbridge Border Post (between Botswana and South-Africa), covering a total of 320km. See this project on an interactive…
Support Programme for the Facilitation of Transport by Inland Waterways, Securing River Navigation and the Sustainable Management of Water Resources in the Congo BasinW.30.15
The Congo Basin contains more than 25,000 km of naturally navigable waterways, including at least 15,000 km of classified routes. Managed through CICOS, the programme will improve the safety, reliability…
WaterAngola, Cabo Verde, Central African Republic, Chad, Democratic Republic of Congo, Gabon, Republic of CongoCentral Africa, Southern Africa, West Africa2020
The road runs in a north-easterly direction from Harare to the Nyamanpanda Border Post (between Zimbabwe and Mozambique), covering a total distance of 278km. See this project on an interactive…
TransportMalawi, Mozambique, South Africa, ZimbabweSouthern Africapap1
Chirundu - Harare Road Link 4 (Chinhoyi to Harare)T.06.03.03.04
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km.…
Navigation on the Congo river and its tributaries the rivers Oubangui and SanghaT.18.04
The project aims to identify all the obstacles to navigate the Congo River, and the Oubangui and Sangha tributaries as well as the port infrastructure needs in order to improve the…
TransportCentral African Republic, Chad, Democratic Republic of Congo, Republic of CongoCentral Africapap1
This project is part of the expansions at 2020 gap airports Phase 1. It will see upgrades at the N'djili Airport (also known as the Kinshasa International Airport).
TransportDemocratic Republic of CongoCentral Africapap1
The road is currently paved with bitumen and needs upgrading to asphalt concrete as well as carriageway expansion from 6 meter to 7 meters. The Kobero-Muyinga is on the RN6.…
Harare - Beitbridge Road Link 3 (Masvingo to Turn Off)T.06.03.03.07
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of…
Chirundu - Harare Road Link 3 (Karoi to Chinhoyi)T.06.03.03.03
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km.The…
The project involves the construction of 117 km section of single carriageway road between Mako and Dialocoto. This section is of the missing links on the Dakar-Bamako road.
Chirundu - Harare Road Link 2 (Makuti to Karoi)T.06.03.03.02
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km.…
Rehabilitation of 75 km of existing Kampala-Jinja road to widen and strengthen the carriageway. The road forms a critical section of the Northern Corridor, linking landlocked East African countries with the Port of…
The proposed project road is one of the six (6) international trunk routes connecting Zimbabwe with the neighbouring countries of Botswana and South Africa Overall, it is intended that the proposed…
TransportBotswana, South Africa, Zambia, ZimbabweSouthern Africapap1
Chirundu - Harare Road Link 1 (Chirundu Border Post - Makuti - Hells Gate)T.06.03.03.01
The Chirundu - Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of…
Widening of the road from 6m to 7m with a paved shoulder to harmonise with EAC standard. The Muyinga-Gitega road is about 104 km on the RN12. This road forms part of the shortest route to the port of Dar es Salaam and carries 60% of international traffic with Burundi.
La réalisation du projet se fera en deux phases suivant le financement actuel.Il comprend des travaux routiers, des mesures de facilitation de transport et d'autres activités connexes de développement. La phase1 comprend le bitumage de 144 km (Ndende-Doussala) au Gabon et 93 km (Dolisie-Kibangu) au Congo, la réhabilitation de 130 km (Kibangu-Ngongo-frontière du Gabon) et la mise en oeuvre des mesures de facilitation de transport.
La phase 2 comprendra le bitumage des tronçons restants entre Kibangu et Ngongo,l'aménagement de la voie de contournement de la ville de pointe noire,l'aménagement des ports secs de Dolisie(Congo) et de Ndende(Gabon) et la mise en oeuvre des mesures de facilitation de transport.
Angola, Democratic Republic of Congo, ZambiaCentral Africa, Southern Africapap1
The project involves the extension of Chingola - Solwezi Railway to the border with Angola at Jimbe, to service new mines in the Copperbelt region. Angola has already commenced construction from Luena on the Lobito Corridor towards Jimbe which lies on the Angola- Zambia border. This project will see full rail service on the Lobito Corridor.
WaterW.05.01Koukoutamba (ex-Gourbassy) Multi-purpose Dam
Mali, SenegalWest Africapap1
The project involves the construction of the Koukoutamba multi-purpose dam (previously known as Gourbassy dam) between Mali and Senegal.
A feasibility study and preliminary design for the Gourbassy Dam was completed by SNC LAVALIN International in 2012 for the OMVS Secretariat (Haut Commissariat de l"’OMVS), with funding from the World Bank under the project PGIRE 1. The main summary report is dated July 2012.
Since then, some (rather modest) progress has been made on further project preparation and mobilisation of finance. Activities that have been undertaken include: preparation of terms of reference for detailed design studies and tender documents. The preparation of studies to assess the cost of building the dam; and development of plans to mobilise finance, including planning for a donor round table and sending out funding requests to potential partners has been done.
TransportT.11.09Walvis Bay Port New Container Terminal
NamibiaSouthern Africapap1
Strategically located half-way down the coast of Namibia, with direct access to principal shipping routes, Walvis Bay is a natural gateway for international trade. Walvis Bay is Namibia's largest commercial port, receiving approximately 3,000 vessel calls each year and handling about 5 million tonnes of cargo. In order to deal with even higher levels of throughput, cargo-handling facilities have been improved, and Namibia Port Authority (Namport) remains committed to infrastructure development, in line with Namport's Mission to provide efficient and effective port and related services.
The project will expand the Port of Walvis Bay"’s container handling as well as bulk handling capacity ahead of demand by the construction of a 30 hectare large new modern container terminal on reclaimed land with 600m of quay wall length designed for a water depth of 16.5m alongside but dredged to 14.0m initially. In so doing the current container terminal will be converted back to a multipurpose terminal capable of handling more bulk and break bulk cargo.
EnergyE.09.03.01Egypt - Libya section of ELTAM Transmission Interconnector (Egypt part)
Egypt, LibyaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Egypt part of the 340 km / 500 kV Egypt to Libya section from the Mersa Matruh to the Libya border.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga via Dodoma and Singida. The design capacity of this section is 2000MW.
Construction of a transmission linethat connects the power networks ofTanzania and Kenya. This projectincludes the section of 414km of400kV transmission line from Singidato Namanga via Arusha. The designcapacity is 2,000MW.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project initially included the section of 400kV, 1134km bidirectional Tanzanian section of the 2,800km ZTK interconnector from Kasama in Zambia to Tunduma-Mbeya-Iringa-Singida-Arusha in Tanzania terminating at Isinya in Kenya. The design capacity of the Tanzania section is 2000MW. The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV.
The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.
TransportT.08.04.01Dar es Salaam Port Modernisation
TanzaniaEast Africapap1
The project involves the modernisation of the Dar es Salaam Port, including upgrade to berths 1 to 7, deepening of the harbour, improveing cargo handling and port layout.
TransportT.06.03.01.01Serenje - Nakonde Road Link 1 (Serenje - Mpika)
Botswana, Malawi, Namibia, Republic of Congo, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province covering a total distance of 611.5 km. The road is divided in 3 links: Link 1: Serenje to Mpika (238.3 km), Link 2: Mpika to Chinsali (164.6 k), Link 3: Chinsali to Nakonde (208.6 km) The Serenje-Nakonde road is part of the Regional Trunk Road Network (RTRN Link 15) as well as the Trans-African Highway Nr 4.
TransportT.11.04Beira New Coal Terminal Development
MozambiqueSouthern Africapap1
The project involves the construction of a new coal terminal at Beira port. A 50 ha site has been set aside for this purpsoe. The terminal is intended to process export coal mined by Brazilian group Vale and Anglo-Australian group Rio Tinto.
Angola, Democratic Republic of CongoCentral Africa, Southern Africapap1
The project is part of the Inga-Cabinda-Pointe Noire transmission interconnector, linking the power systems of DRC, Angola and Congo, with a transfer capacity of 600 MW. The project involves the construction of a section in DRC from Inga to the border with Angola.
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The proposed 330 kV line is approximately 300 km long (177 km in CA´te d’Ivoire and 119 in Ghana) and involves a the construction of a transmission line, construction of a new substation at Akoupe-Zeudji in the North East of Abidjan in CA´te d’Ivoire and the construction of a new substation '"’Dunkwa"’"’ 2 at Dunkwa-on-Offin in Ghana.
The Kayanza- Bugarama road is about 59 km on the RN1. It originates from Bugarama and terminates in Kayanza City. This road forms part of the trade route with Rwanda.
TransportT.08.03.16Nyahua-Chaya, Urambo-Kaliua, Kazirambwa-Chagu and Malagarasi-Uvinza Roads
TanzaniaEast Africapap1
The project involves upgrading of missing links along part of the Central Corridor of Manyoni-Itigi-Tabora-Urambo-Kaliua-Kigoma: Nyahua to Chaya (90km), Urambo to Kaliua (33km), Kazirambwa to Chagu (40km) and Malagarasi to Uvinza (51km) from gravel to paved.
TransportT.06.03.01.03Serenje - Nakonde Road Link 3 (Chinsali - Nakonde)
Botswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province covering a total distance of 611.5 km. The road is divided in 3 links: Link 1: Serenje to Mpika (238.3 km), Link 2: Mpika to Chinsali (164.6 k), Link 3: Chinsali to Nakonde (208.6 km) The Serenje-Nakonde road is part of the Regional Trunk Road Network (RTRN Link 15) as well as the Trans-African Highway Nr 4.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km ZTK interconnector from Kabwe-Pensulo-Nakonde-Kasama in Zambia to Tunduma in Tanzania. The project was envisioned to be implemented in two phases starting with the Kabwe-Pensulo-Kasama-Nakonde section and the second phase would have comprised the Kabwe-Pensulo-Mpika-Kasama section. It will have had a capacity of 500MW, upgradable to 2000MW depending on power demand.
The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV. The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.
EnergyE.09.01.01Algeria - Tunisia section of ELTAM Transmission Interconnector (Algeria part)
Algeria, TunisiaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Algeria part of the 220 km / 400 kV Algeria to Tunisia section from Cheffia in Algeria to the Tunisia border.
TransportT.06.03.03.08Harare - Beitbridge Road Link 4 (Turn Off to Beitbridge Border Post)
ZimbabweSouthern Africapap1
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 25). This section covers 184 km from Turn Off to Beitbridge Border Post.
TransportT.09.02.03Sena Railway Line Rehabilitation
MozambiqueSouthern Africapap1
The Sena line runs from Limbe (going through Chiromo where the railway line crosses the Shire River, where the culvert has been washed away and Nsanje) to Marka, the border between Malawi and Mozambique.
EnergyE.09.02.01Libya - Tunisia section of ELTAM Transmission Interconnector (Libya part)
Libya, TunisiaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Libya part of the 210 km / 400 kV Libya to Tunisia section from Abou Kamach in Libya to the Tunisia border. It has a power transmission capacity of 1000 MW.
TransportT.06.03.01.02Serenje - Nakonde Road Link 2 (Mpika - Chinsali)
Botswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province covering a total distance of 611.5 km. The road is divided in 3 links: Link 1: Serenje to Mpika (238.3 km), Link 2: Mpika to Chinsali (164.6m), Link 3: Chinsali to Nakonde (208.6 km) The Serenje-Nakonde road is part of the Regional Trunk Road Network (RTRN Link 15) as well as the Trans-African Highway Nr 4.
TransportT.06.03.03.06Harare - Beitbridge Road Link 2 (Chivhu to Masvingo)
ZimbabweSouthern Africapap1
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km.The Harare-Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 25). This section covers 151 km from Chivhu to Masvingo.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 400kV, 292km Iringa - Kisada - Mbeya transmission line, 122km of 400kV Mbeya - Tunduma transmission line and 4km of 400kV transmission line from Tunduma to Border of Zambia.Â
TransportT.06.03.03.05Harare - Beitbridge Road Link 1 (Harare to Chivhu)
ZimbabweSouthern Africapap1
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 25). This section covers 141 km from Harare to Chivhu.
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The project involves the construction of approximately 350 km of 330 kV transmission line from Tema Swithching Station in Ghana (Volta) over a distance of 140 km to the Ghana /Togo Border (Lome "C") and 98 km of 330 kV line from Lome "C" to the Togo/Benin Border and from there an 110 km 330 kV line to the Sakete Substation in Benin. It also comprises the extension of the 330 kV switching substation in Tema, Ghana, construction of 330/161/20 kV substation in Lome "C", Togo and the extension of the 330 kV substation at Sakete in Benin.
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project comprises the update of project studies.
ICTI.02.30.02Construction of Amilcar Cabral Submarine Cable System
Algeria, Cabo Verde, Gambia, Guinea, Guinea-Bissau, Liberia, Sierra LeoneNorth Africa, West Africa2020
The Amilcar Cabral Submarine Cable System (ACSCS) is a 3,555 km submarine fibre optic cable project connecting Cabo Verde, The Gambia, Guinea, Guinea-Bissau, Liberia, and Sierra Leone. The system comprises a 2,955 km main trunk and includes four branching units to the mainland countries and two stubs for future expansion to the north and south respectively. It is designed with a minimum capacity of 12 Tbps per fibre pair and a 25-year operational lifespan. The cable will land in Praia, Cabo Verde, and connect to the EllaLink submarine cable system, providing a direct link to Brazil and Europe. The project is a key component of the ECOWAS broadband backbone programme and aims to provide a redundant, high-capacity international gateway for the participating countries, which currently rely predominantly on the Africa Coast to Europe (ACE) submarine cable. The project has been in development since 2018 and is led by a consortium of national operators and public entities from the six participating countries, coordinated by the ECOWAS Project Preparation and Development Unit (PPDU). The full system cost is estimated at USD 91.3 million, with Liberia's portion estimated at USD 14.29 million.
The Amilcar Cabral submarine Cable Project is part of the ECOWAS broadband Backbone infrastructure programme aimed at connecting the island nation of Cabo Verde to its nearest neighbors on the mainland namely Guinea, Guinea-Bissau, Liberia, Sierra Leone and The Gambia.
The project involves the construction of the Kousséré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
The road runs in a south westernly direction from Bulawayo to the Beitbridge Border Post (between Botswana and South-Africa), covering a total of 320km. See this project on an interactive GIS map (with Google Earth satellite imagery and geo-referenced photographs) at www.tmsagis.co.za. The Bulawayo - Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 311).
WaterW.30.15Support Programme for the Facilitation of Transport by Inland Waterways, Securing River Navigation and the Sustainable Management of Water Resources in the Congo Basin
Angola, Cabo Verde, Central African Republic, Chad, Democratic Republic of Congo, Gabon, Republic of CongoCentral Africa, Southern Africa, West Africa2020
The Congo Basin contains more than 25,000 km of naturally navigable waterways, including at least 15,000 km of classified routes. Managed through CICOS, the programme will improve the safety, reliability and management of inland waterway transport and strengthen integrated water-resource management. Activities include needs assessment and project definition, navigation and hydrometric information, harmonised rules and procedures, institutional capacity, planning for channel and terminal improvements, and data services for governments, operators, communities and research institutions.
Malawi, Mozambique, South Africa, ZimbabweSouthern Africapap1
The road runs in a north-easterly direction from Harare to the Nyamanpanda Border Post (between Zimbabwe and Mozambique), covering a total distance of 278km. See this project on an interactive GIS map (with Google Earth satellite imagery and geo-referenced photographs) at www.tmsagis.co.za.
The Harare-Nyamapanda road is part of the Regional Trunk Road Network (RTRN Link NR 25) as well as the Trans-African Highway NR 9 and the rehabilitation of Marehwa-Nyamapanda is a section of this project, which covers a distance of 172km.
TransportT.06.03.03.04Chirundu - Harare Road Link 4 (Chinhoyi to Harare)
ZimbabweSouthern Africapap1
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km. The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. This section covers a distance of 101 km from Chinhoyi to Harare.
TransportT.18.04Navigation on the Congo river and its tributaries the rivers Oubangui and Sangha
Central African Republic, Chad, Democratic Republic of Congo, Republic of CongoCentral Africapap1
The project aims to identify all the obstacles to navigate the Congo River, and the Oubangui and Sangha tributaries as well as the port infrastructure needs in order to improve the conditions and the capacity of safe river transport.
The Congo River is navigable for a distance of about 1700 km between Kinshasa and Kisangani. The Oubangui is navigable to Bangui from Liranga, which is 600 km from Brazzaville and the Sangha is navigable for a distance of roughly 710 km between Nola and the confluence with the Congo River.
The project proposes sustainable solutions for the rehabilitation, development and operation of the river transport network. At the end of the feasibility study phase, the following developments are proposed for navigation and ports:
Navigation: Improvement of the markup, the dredging of the main and secondary channel of the Congo River as well as the management of the difficult passes identified on Oubangui and Sangha.
Ports: Dredging in front of wharves, salvaging wrecks, rehabilitating quay walls and quays, acquiring and repairing port operating equipment, rehabilitating buildings, warehouses and roads as well as the layout of certain existing berthing areas, etc.
In addition, the project proposes skills development of the personnel of the institutions in charge of river transport of the three countries in the fields related to the code of inland navigation, the safety and security of navigation and port operations.
This project is part of the expansions at 2020 gap airports Phase 1. It will see upgrades at the N'djili Airport (also known as the Kinshasa International Airport).
The road is currently paved with bitumen and needs upgrading to asphalt concrete as well as carriageway expansion from 6 meter to 7 meters. The Kobero-Muyinga is on the RN6. This road forms part of the shortest route to a trade port (Dar es Salaam), and carries 60% of international traffic with Burundi.
TransportT.06.03.03.07Harare - Beitbridge Road Link 3 (Masvingo to Turn Off)
ZimbabweSouthern Africapap1
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 25). This section covers 95 km from Masvingo to Turn Off.
TransportT.06.03.03.03Chirundu - Harare Road Link 3 (Karoi to Chinhoyi)
ZimbabweSouthern Africapap1
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km.The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. This section covers a distance of 94 km from Karoi to Chinhoyi.
The project involves the construction of 117 km section of single carriageway road between Mako and Dialocoto. This section is of the missing links on the Dakar-Bamako road.
TransportT.06.03.03.02Chirundu - Harare Road Link 2 (Makuti to Karoi)
ZimbabweSouthern Africapap1
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km. The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. This section covers 78 km from Makuti to Karoi.
Rehabilitation of 75 km of existing Kampala-Jinja road to widen and strengthen the carriageway. The road forms a critical section of the Northern Corridor, linking landlocked East African countries with the Port of Mombasa.
Botswana, South Africa, Zambia, ZimbabweSouthern Africapap1
The proposed project road is one of the six (6) international trunk routes connecting Zimbabwe with the neighbouring countries of Botswana and South Africa Overall, it is intended that the proposed intervention will reduce travel costs for road users as well as maintenance costs for the Government. A major objective is to help improve road safety conditions for international and regional traffic and for local residents
The project road starts from the Bulawayo Main Post Office and ends at the intersection* with the Masvingo road about 4 km north of the international border area. The approximate limits of the subject Project road are indicated in Map.
TransportT.06.03.03.01Chirundu - Harare Road Link 1 (Chirundu Border Post - Makuti - Hells Gate)
ZimbabweSouthern Africapap1
The Chirundu - Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km. The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. Llink 1 runs a distance of 75 km from Chirundu Border Post to Hells Gate.
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment
Tone & Mood
Will generate for 15projects (top by investment value). Estimated time: ~2 min.