African Infrastructure Database
Connecting Africa through infrastructure

Project Showcase

Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.

647 published projects6 presentation themesAtlas map modeVoice narration
  1. 1Filter projectsby sector, country, stage or programme
  2. 2Selectthe projects you want to present
  3. 3Create a showwith AID Intelligence and present full screen
47 of 47 published projects
#
Project
Investment · stage
1
Grand INGA Phase 1 E.30.16
The project proposes electricity interconnections from the Grand Inga hydropower station through a northern axis, southern axes using eastern and western corridors, and a western axis. The generation and transmission…
Energy Democratic Republic of Congo, South Africa Central Africa, Southern Africa 2020
$14B Feasibility Active Express interest →
2
LAPSSET Railway Project T.RL.26.02
The LAPSSET Railway Project forms the railway component of the Lamu Port-South Sudan-Ethiopia Transport Corridor. Its approved purpose is to create a new regional rail connection from the Indian Ocean…
Transport Ethiopia, Kenya, South Sudan, Uganda East Africa, North-Eastern Africa 2020
$13.5B Feasibility Active Express interest →
3
Establishment of a Navigational Line between Lake Victoria and the Mediterranean Sea - Feasibility Study Phase 2 (VICMED) T.IW.26.04
The VICMED initiative proposes an integrated navigation and multimodal transport corridor from Lake Victoria to the Mediterranean Sea. It is intended to connect Nile Basin countries through river, lake and…
Transport Burundi, Democratic Republic of Congo, Egypt, Ethiopia, Kenya, Rwanda, South Sudan, Sudan, Tanzania, Uganda Central Africa, East Africa, North Africa, North-Eastern Africa 2020
$12B Feasibility Active Express interest →
4
Rehabilitation, Modernisation and Service Improvement of the Trans-Maghreb Railway T.RL.26.05
The project is intended to restore and modernise a continuous railway corridor between Morocco, Algeria and Tunisia. The approved first-phase scope includes modernisation of the Fez-Oujda line, rehabilitation of the…
Transport Algeria, Morocco, Tunisia North Africa 2020
$4B Pre-Feasibility Active Express interest →
5
INGA 3 Transmission Interconnector E.30.15
The project covers feasibility studies for the design, development, operation and maintenance of a high-voltage direct-current transmission scheme associated with the Inga 3 Low Head Project. The studies will cover…
Energy Botswana, Democratic Republic of Congo, South Africa, Zambia, Zimbabwe Central Africa, Southern Africa 2020
$3.6B Project Definition Active Express interest →
6
Construction of a Bridge over the Oubangui River and Development of the Bangui-Kisangani-Kampala and Kisangani-Bujumbura Corridors T.BD.20.02
The Oubangui River crossing between Bangui and Zongo is a missing physical link between the Central African Republic and the Democratic Republic of Congo. The project is designed as more…
Transport Burundi, Central African Republic, Democratic Republic of Congo, Uganda Central Africa, East Africa 2020
$3.5B Feasibility Active Express interest →
7
Continental Africa Water Investment Support Programme (AIP) W.30.01
AIP provides an enabling and project-preparation framework for priority transboundary and regional water investments submitted by African member states. It supports integrated water, health, energy and food-security projects; strengthens institutional…
Water Benin, Cameroon, Ghana, Kenya, Nigeria, Tunisia, Uganda, Zambia Central Africa, East Africa, North Africa, Southern Africa, West Africa 2020
$1.9B Project Definition Active Express interest →
8
Lobito Port Expansion and Modernization Project T-PT-26-002
The Lobito Port Expansion and Modernization Project is a major infrastructure initiative to transform the Port of Lobito into a modern, high-capacity Atlantic gateway for the Lobito Corridor. The project…
Transport Angola, Democratic Republic of Congo, Zambia Central Africa, Southern Africa pap1
$800M Project Structuring Active Express interest →
9
Dawa River Multi-purpose Dam W.30.06
The project proposes a multipurpose dam on the Dawa River approximately 20 km upstream of Rhamu Dimtu in Kenya and near Boni in Ethiopia. Current PIDA specifications indicate an estimated…
Water Ethiopia, Kenya, Somalia East Africa, North-Eastern Africa 2020
$604M Project Definition Active Express interest →
10
Integrated Watershed Management in Priority Catchments (Ribb, Gumera and Jema Watersheds) BIP_ENTRO_019
The Integrated Watershed Management in the Ribb, Gumera and Jema Watersheds project is one of the four fast track projects prepared in 2007 under the Eastern Nile Watershed Management (ENWM)…
Water Ethiopia North-Eastern Africa ENTRO
$399M Feasibility Active Express interest →
11
Jita Integrated Watershed Management Project BIP_ENTRO_021
The Jita sub-basin measures 2,915 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin partially covers five Woredas…
Water Ethiopia North-Eastern Africa ENTRO
$262M Feasibility Active Express interest →
12
Chemoga-Yeda Integrated Watershed Management Project BIP_ENTRO_012
The Chemoga-Yeda sub-basin measures 2,738 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin is located in Amhara…
Water Ethiopia North-Eastern Africa ENTRO
$117M Project Structuring Active Express interest →
13
Kinyeti River Multi-purpose Water Resources Development Project BIP_ENTRO_009
Kinyeti River has its origins in the Imatong Mountains close to the South Sudan-Uganda border and from there flows northwards, eventually dispersing into the Badigeru swamp. The proposed project has…
Water South Sudan North-Eastern Africa ENTRO
$106M Feasibility Active Express interest →
14
Development of Data Centre Infrastructures Underpinning the Digital Economy I.02.30.04
The Development of Data Centre Infrastructures Underpinning the Digital Economy is a regional ICT programme under the Economic Community of Central African States (ECCAS). It envisions establishing six new…
ICT Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and Principe Central Africa, East Africa, Southern Africa, West Africa 2020
$93M Project Definition Active Express interest →
15
Interconnection of Member States' Broadband Networks I.02.30.11
Regional project under PIDA PAP 2 (2021-2030) to provide and strengthen each ECCAS Member State with high bandwidth fiber optic connectivity and establish a sub-regional data hosting centre in the…
ICT Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and Principe Central Africa, East Africa, Southern Africa, West Africa 2020
$92M Project Definition Active Express interest →
16
Dinger-Bereha Irrigation and Drainage Project BIP_ENTRO_002
Dinger Bereha Irrigation and Drainage Project is located in Chewaka Woreda develop a 7,500 ha irrigation scheme at Dinger Bereha in Chewaka Woreda. The project will abstract water from the…
Water Ethiopia North-Eastern Africa 2024-01-NRBIP
$70M Feasibility Active Express interest →
17
Wad Meskin Irrigation Project BIP_ENTRO_023
Wad Meskin barrage across Rahad River has been planned to regulate the flood flows during rainy season, for Dinder and Rahad rivers so as to satisfy the needs of Rahad…
Water Sudan North-Eastern Africa ENTRO
$69M Project Structuring Active Express interest →
18
Angololo Multipurpose Water Resources Transboundary Project
Angololo Water Resources Development Project (AWDP) is located on the transboundary Malaba River shared by Kenya and Uganda and falls within the Sio-Malaba Malakisi (SMM) River Basin of the Nile Basin. The project…
Water Kenya, Uganda East Africa
$67M Feasibility Active Express interest →
19
The Ethiopia-Sudan Transmission Interconnection Project
The power system interconnection project involved the construction of a high voltage transmission line from Ethiopia to Sudan to utilise surplus hydropower from Ethiopia to replace oil-based thermal generation in…
Energy Ethiopia, Sudan North-Eastern Africa ENTRO
$66M Operation Active Express interest →
20
Atbara-Kerib Land Rehabilitation Project (Integrated Watershed Management in Priority Catchments (Atbara Watersheds)) BIP_ENTRO_011
The Atbara Kerib Land Rehabilitation Project was one of 13 potential first-round investment projects identified in 2007 under the Cooperative Regional Assessment (CRA) of Watershed Management in the Eastern Nile…
Water Sudan North-Eastern Africa ENTRO
$36M Project Structuring Active Express interest →
21
Lau Watershed Management Project BIP_ENTRO_016
The Lau Watershed Management project is one of the four fast track projects prepared in 2007 under the Eastern Nile Watershed Management (ENWM) Project. The Lau Watershed project area is administratively located within…
Water South Sudan North-Eastern Africa ENTRO
$35M Operation Active Express interest →
22
Majang Multipurpose Water Resources Development Project BIP_ENTRO_008
Majang development project is located in the Dunchaye kebele within the Godere woreda (Majang zone) Gambela Region, Ethiopia. The Majang Project, which will draw water from the Duchaye River, has…
Water Ethiopia North-Eastern Africa ENTRO
$14M Feasibility Active Express interest →
23
Integrated Watershed Management in Dinder/Alitash national park sub-catchment BIP_ENTRO_014
The Alatish-Dinder Transboundary Park Project was one of 13 potential first-round investment projects identified in 2007 under the Cooperative Regional Assessment (CRA) of Watershed Management in the Eastern Nile Basin.…
Water Ethiopia, Sudan North-Eastern Africa ENTRO
$12M Pre-Feasibility Active Express interest →
24
Integrated Watershed Management Project in Atbara Catchment BIP_ENTRO_015
The Dinder, Atbara and Bau Watershed Management Project is one of the four fast track projects prepared in 2007 under the Eastern Nile Watershed Management (ENWM) Project. Three watersheds were…
Water Ethiopia North-Eastern Africa ENTRO
$12M Feasibility Active Express interest →
25
Transboundary Hydro-Meteorological and Environmental Monitoring System and Environmental Flows Assessment
Transboundary Hydro-Meteorological and Environmental Monitoring System and Environmental Flows Assessment Project is one of nine medium and long-term projecs identified and prioiritized under the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Study…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$10M Feasibility Active Express interest →
26
Telkuk Water Harvesting Project BIP_ENTRO_022
Telkuk Water Harvesting Project Telkuk Water Harvesting Project is to promote the sustainable management of rangeland in the Talkuk Locality, Kassala State. Proposed project interventions include: Increasing water harvesting through constructing traditional teras, libish,…
Water Sudan North-Eastern Africa ENTRO
$8M Pre-Feasibility Active Express interest →
27
Akobo-Gambella Floodplains Transboundary Development Programme BIP_ENTRO_007
The Akobo-Gambella floodplains transboundary development programme is one of the three short term projects proposed as part of the Baro-Akobo-Sobat multipurpose water resources development study project. The three short term…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$8M Feasibility Active Express interest →
28
Sudd Wetlands Management Plan
The Sudd wetland is one of the most unique and valuable ecosystems on Earth. It is the largest wetland in Africa, and a designated a Ramsar site. The Sudd wetlands…
Water Egypt, Ethiopia, Kenya, South Sudan, Sudan, Uganda East Africa, North Africa, North-Eastern Africa ENTRO
$6M Project Definition Active Express interest →
29
Integrated BAS Hydropower, Irrigation and Multipurpose Development Programme - Phase 1: Baro/Sobat Component. BIP_ENTRO_003
Integrated BAS Hydropower, Irrigation and Multipurpose Development Programme - Phase 1: Baro/Sobat Component.’ is one of nine priority medium to long-term projects under the Integrated Water Resources Development and Management…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$1M Pre-Feasibility Active Express interest →
30
Sudan Hydropower Sequencing and Operations Study (Sherieq, Dal/Low Dal, Kajbar, Dagash, Mugrat, and Sabaloka HPP Project) BIP_ENTRO_006
The Dal project site is located on the Nile in Sudan some 280 km downstream of Dongola and immediately upstream of Lake Nubia / Lake Nasser. The project comprises of a 30 m…
Energy Sudan North-Eastern Africa ENTRO
$1M Pre-Feasibility Active Express interest →
31
Integrated Watershed Management in Priority Catchment (Dinder/Rahad Watersheds Management Projects) BIP_ENTRO_013
Dinder and Rahad Rivers originate in the Ethiopian Highlands and flow northwestwards before joining with the Abbay River downstream of Sennar dam to form the Blue Nile River. The two…
Water Sudan North-Eastern Africa ENTRO
$1M Pre-Feasibility Active Express interest →
32
Akobo â€" Pibor transboundary multipurpose development project
Akobo and Pibor Rives that are shared by Ethiopia and South Sudan have a lot of potential to support socio-economic development, including hydropower generation, agricultural irrigation, fisheries resoures development and…
Water Ethiopia, South Sudan North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
33
Boma-Gambella Transboundary National Park
Gambela National Park (GNP) (4,575 km2) â€" the largest protected area in Ethiopia â€" is located in south western Ethiopia adjacent to the border with South Sudan. Located south of…
Water Ethiopia, South Sudan North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
34
Butana Plains Watershed Management Project
The Butana Plains Watershed Management Project was one of 13 potential first-round investment projects identified in 2007 under the Cooperative Regional Assessment (CRA) of Watershed Management in the Eastern Nile…
Water Sudan North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
35
Cingaineta River Multipurpose Development Project
Cingaineta River originates in the Didinga foothills of the Imatong Mountains close to the South Sudan â€" Uganda border, and flows through the town of Kapoeta in in Eastern Equatoria…
Water South Sudan North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
36
Development of a Continental Aviation Infrastructure Master Plan Including a Seamless Airspace Architecture T.AV.26.01
The project supports operationalisation of the Single African Air Transport Market by addressing the infrastructure and airspace-management constraints that limit safe, efficient and competitive air transport. It covers both physical…
Transport Algeria, Angola, Benin, Botswana, Burkina Faso, Burundi, Cabo Verde, Cameroon, Central African Republic, Chad, Comoros, Côte d'Ivoire, Democratic Republic of Congo, Djibouti, Egypt, Equatorial Guinea, Eritrea, Eswatini, Ethiopia, Gabon, Gambia, Ghana, Guinea, Guinea-Bissau, Kenya, Lesotho, Liberia, Libya, Madagascar, Malawi, Mali, Mauritania, Mauritius, Morocco, Mozambique, Namibia, Niger, Nigeria, Republic of Congo, Rwanda, SADC Countries, Sao Tome and Principe, Senegal, Seychelles, Sierra Leone, Somalia, South Africa, South Sudan, Sudan, Tanzania, Togo, Tunisia, Uganda, Zambia, Zimbabwe, _Not Applicable African Continent, Central Africa, East Africa, North Africa, North-Eastern Africa, Southern Africa, West Africa 2020
Not reported Project Definition Active Express interest →
37
Eastern Nile Transboundary Water Quality Monitoring Programme
Rapid population increase coupled with expanding agriculture, urbanisation, industrialisation, aging waste water treatment infrastructure and expansion of irrigation schemes in the Eastern Nile pose a serious threat to water quality…
Water Egypt, Ethiopia, South Sudan, Sudan North Africa, North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
38
Gambella - Machar Transboundary National Park Environmental Protection Project
Gambella National Park (GNP) (5,060 km2) â€" the largest protected area in Ethiopia â€" is located in southwestern Ethiopia adjacent to the border with South Sudan. The park consists of…
Water Ethiopia, South Sudan North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
39
Jema Integrated Watershed Management Project
The Jema sub-basin measures 3,241 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin partially covers six woredas…
Water Ethiopia North-Eastern Africa Z1.00.00
Not reported Feasibility Active Express interest →
40
Rehabilitation and modernization of the existing Irrigation schemes (Ethiopia) Abbay/Blue Nile
There are more than 5.3 million ha of land currently under irrigation in the Eastern Nile, most with a poorThe project titled ‘Rehabilitation and modernization of the existing Irrigation schemes…
Water Ethiopia North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
41
Rehabilitation and modernization of the existing Irrigation schemes: Baro-Akobo-Sobat/White Nile
There are more than 5.3 million ha of land currently under irrigation in the Eastern Nile, most with a poorThe project identification was completed in 2015 with funding from the…
Water Egypt, Ethiopia, South Sudan, Sudan North Africa, North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
42
Sor Watershed Project
Sor Watershed Project . The Sor River originates in the highland Montane Forests that straddle the Illubabor Administrative Zone of Oromiya Regional State and of Kaffa Administrative Zone in Southern…
Water Ethiopia North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
43
Upper Birbir (West) Watershed Project
Upper Birbir (West) Watershed Project Upper Birbir (West) Watershed Project is to promote the sustainable management of the natural resources of the watershed while exploiting them to support livelihoods of…
Water Ethiopia North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
44
Wadi Allaqi Livelihoods Support Project
Wadi Allaqi Livelihoods Support Project Wadi Allaqi Livelihoods Support Project is to promote alternative livelihood activities that protect the unique biodiversity of the area. Project interventions include promoting tree planting…
Water Egypt North Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
45
Wadi Allaqi/Gabgaba (Sudan) UNESCO Biosphere Reserve Baseline Studies
Wadi Allaqi/Gabgaba (Sudan) UNESCO Biosphere Reserve Baseline Studies The prefeasibility study for the project was carried out in the period 2010-2012 under the Watershed Delineation and Prioritization Project.
Water Egypt North Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
46
Watershed management in priority catchments (Lake Nasser/Lake Nubia)
The project was identified and prepared under the Eastern Nile Watershed Management Project in 2007, and implemented nationally. The project objective was to support the development of a Lake Nasser/Nubia…
Water Egypt, Sudan North Africa, North-Eastern Africa ENTRO
Not reported Operation Completed Express interest →
47
Zamra-Araqua Watershed Project
Zamra-Araqua Watershed Project was one of 13 potential first-round investment projects identified in 2007 under the Cooperative Regional Assessment (CRA) of Watershed Management in the Eastern Nile Basin. The 13…
Water Ethiopia North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
Showing 47 of 47 published projects (Page 1 of 1)
Per page: 50 100 150 1
0 projects selected
AID Showcase 1 / 47
aid.nepad.org

Intelligent AID — Create Showcase

Showcase ready! You have a previously generated AI showcase for these projects in this session.

Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.

Narrative Style

Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment

Tone & Mood

Will generate for 15 projects (top by investment value). Estimated time: ~2 min.
Preparing...