1
Establishment of a Navigational Line between Lake Victoria and the Mediterranean Sea - Feasibility Study Phase 2 (VICMED) T.IW.26.04
The VICMED initiative proposes an integrated navigation and multimodal transport corridor from Lake Victoria to the Mediterranean Sea. It is intended to connect Nile Basin countries through river, lake and…
Transport Burundi, Democratic Republic of Congo, Egypt, Ethiopia, Kenya, Rwanda, South Sudan, Sudan, Tanzania, Uganda Central Africa, East Africa, North Africa, North-Eastern Africa 2020
$12B Feasibility Active
2
Mtwara-Mbamba Bay Standard Gauge Railway with Spurs to Liganga and Mchuchuma T.RL.26.01
The project will connect Mtwara Port with Mbamba Bay through southern Tanzania and provide branch lines to the Mchuchuma coal and Liganga iron-ore deposits. The PAP II concept covers approximately…
Transport Malawi, Mozambique, Tanzania, Zambia, Zimbabwe East Africa, Southern Africa 2020
$5.5B Transaction Support & Financial Close Active
3
Dar es Salaam - Isaka - Mwanza Standard Gauge Railway T.08.05.01
Tanzania is constructing the high speed electric standard gauge railway line from the port of Dar es Salaam to the inland Lake Victoria (at Mwanza) (1219 Km) with a target speed…
Transport Rwanda, Tanzania, Uganda East Africa pap1
$2.5B Construction Active
4
Isaka - Kigali Standard Gauge Railway T.08.05.01
Tanzania is constructing the high speed electric standard gauge railway line from Isaka to Rusumo connects Keza in Kigali (371 Km)
Transport Rwanda, Tanzania, Uganda East Africa pap1
$2.5B Tendering Active
5
Dar es Salaam - Chalinze - Morogoro Road Capacity Upgrade
Rehabilitation and upgrading of the 197 km of road which would be the first toll road in Tanzania (First 100 km 6 lanes and then 4 lanes). The project requires…
Transport Burundi, Rwanda, Tanzania, Uganda East Africa pap1
$948M Construction Active
6
Development of Ports and Maritime Transport on Lake Victoria BIP_LVBC_002
The project will deliver: (i) Reduced transport costs for landlocked EAC states (Uganda, Rwanda, Burundi) and neighbouring countries like DRC, by shifting cargo from long road hauls to lake…
Transport Kenya, Tanzania, Uganda East Africa 2024-01-NRBIP
$700M Feasibility Active
7
Dar es Salaam New Container Terminal T.08.04.04
Development of new container terminal (berths 13 and 14) with dredging of the access channel at Dar es Salaam Port.
Transport Tanzania East Africa pap1
$628M Transaction Support & Financial Close Active
8
Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre I.02.30.05
The Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre is a multi-country ICT infrastructure project under the PIDA Priority Action Plan 2 (PAP 2) 2021-2030. The project…
ICT Ethiopia, Kenya, Somalia, South Sudan, Tanzania, Uganda East Africa, North-Eastern Africa IGAD
$530M Project Structuring Active
9
Dar es Salaam New Berths Vijibweni, Mbwamaji and Kunduchi T.08.04.03
This project includes development of 3 new berths on the eastern side of Dar es Salaam port, linked by a bridge south of the existing dockyard and fronting the new…
Transport Tanzania East Africa pap1
$500M Project Definition Active
10
Regional Rusumo Falls Hydroelectric Power Project II E.13.01
Regional Rusumo Falls Hydroelectric Project (RRFHP) Development Objective is to increase the supply of electricity to the national grids of Rwanda, Tanzania and Burundi. It Comprises of construction of an…
Energy Burundi, Rwanda, Tanzania East Africa pap1
$461M Operation Active
11
Mpanda-Kasulu-Nyakanazi and Kasulu-Kigoma Roads T.08.03.10
The project will enable a direct road link between the Central Corridor and Lake Victoria at Kigoma.
Transport Tanzania East Africa pap1
$404M Construction Active
12
Masaka - Mwanza Transmission Line Project E.30.01
The approved project comprises a 98 km transmission line operating at 220 kV. It was identified as a least-cost transmission investment in the Tanzania Power System Master Plan and the…
Energy Tanzania, Uganda East Africa EAPP
$325M Tendering Active
13
Akagera River Transport Project BIP_LVBC_001
The Project aims to develop inland water transport infrastructure and services along the Akagera River to improve regional connectivity between Rwanda, Tanzania, and Uganda. The project involves river navigation improvements,…
Transport Rwanda, Tanzania, Uganda East Africa 2024-01-NRBIP
$298M Feasibility Active
14
Akagera River Transport T.IW.26.02
The project is intended to create an inland-water transport connection from Lake Victoria through the Kagera/Akagera River to Kagitumba in eastern Rwanda. Its approximately 260 km scope may require river…
Transport Burundi, Rwanda, Tanzania, Uganda East Africa 2020
$298M Feasibility Active
15
ZTK Transmission Interconnector (Tanzania section - Iringa to Shinyanga) E.02.03.01
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga…
Energy Kenya, Tanzania, Zambia East Africa, Southern Africa EAPP
$242M Construction Active
16
ZTK Transmission Interconnector (Tanzania section - Singida to Namanga) E.02.03.01
Construction of a transmission linethat connects the power networks ofTanzania and Kenya. This projectincludes the section of 414km of400kV transmission line from Singidato Namanga via Arusha. The designcapacity is 2,000MW.
Energy Kenya, Tanzania, Zambia East Africa, Southern Africa EAPP
$242M Operation Active
17
ZTK Transmission Interconnector (Tanzania section) E.02.03.01
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project initially included the section of 400kV, 1134km bidirectional Tanzanian section of the 2,800km ZTK…
Energy Kenya, Tanzania, Zambia East Africa, Southern Africa pap1
$242M Tendering Active
18
Dar es Salaam Port Modernisation T.08.04.01
The project involves the modernisation of the Dar es Salaam Port, including upgrade to berths 1 to 7, deepening of the harbour, improveing cargo handling and port layout.
Transport Tanzania East Africa pap1
$214M Construction Active
19
Borenga Dam and Mara Valley Multipurpose Water Resources Development Project BIP_NELSAP_011
The Mara River Basin Project contributes to improved living conditions of the basin communities by creating an enabling environment for sustainable development-oriented investments and building capacity of riparian staff and communities in integrated water…
Water Tanzania East Africa
$212M Project Structuring Active
20
Serenje - Nakonde Road Link 1 (Serenje - Mpika) T.06.03.01.01
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
Transport Botswana, Malawi, Namibia, Republic of Congo, Tanzania, Zambia, Zimbabwe Central Africa, East Africa, Southern Africa pap1
$202M Tendering Active
21
Ngono MPP Water Resources Development Project (MPP) BIP_NELSAP_015
The Ngono Valley project (located in the western shores of Lake Victoria and shared by the Districts of Bukoba Rural and Missenyi) will…
Water Tanzania East Africa
$172M Project Structuring Active
22
Nyahua-Chaya, Urambo-Kaliua, Kazirambwa-Chagu and Malagarasi-Uvinza Roads T.08.03.16
The project involves upgrading of missing links along part of the Central Corridor of Manyoni-Itigi-Tabora-Urambo-Kaliua-Kigoma: Nyahua to Chaya (90km), Urambo to Kaliua (33km), Kazirambwa to Chagu (40km) and Malagarasi to…
Transport Tanzania East Africa pap1
$171M Transaction Support & Financial Close Active
23
Serenje - Nakonde Road Link 3 (Chinsali - Nakonde) T.06.03.01.03
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
Transport Botswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, Zimbabwe Central Africa, East Africa, Southern Africa pap1
$169M Tendering Active
24
ZTK Transmission Interconnector (Zambia section) E.02.03.03
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km ZTK interconnector from…
Energy Kenya, Tanzania, Zambia East Africa, Southern Africa EAPP
$162M Active
25
Nsongezi Hydroelectric Power Station BIP_NELSAP_007
The Nsongezi Hydropower Project is a proposed run-of-river scheme on the Kagera River, located along the border between Uganda and Tanzania. The project is also regionally relevant, with potential power…
Energy Rwanda, Tanzania, Uganda East Africa 2024-01-NRBIP
$157M Feasibility Active
26
Serenje - Nakonde Road Link 2 (Mpika - Chinsali) T.06.03.01.02
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
Transport Botswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, Zimbabwe Central Africa, East Africa, Southern Africa pap1
$142M Tendering Active
27
ZTK Transmission Interconnector (Tanzania section -Mbeya to Tunduma) E.02.03.01
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 400kV, 292km Iringa - Kisada - Mbeya transmission line,Â…
Energy Kenya, Tanzania, Zambia East Africa, Southern Africa EAPP
$123M Tendering Active
28
Lake Victoria Water and Sanitation Initiative Phase II (LVWATSAN II)
This project involved construction of water supply and sanitation systems, improving solid waste and storm water management, improving watershed management, improving urban planning and building capacity of urban authorities in 15 secondary towns…
Water Burundi, Kenya, Rwanda, Tanzania, Uganda East Africa
$110M Operation Completed
29
Kakono Hydropower Project BIP_NELSAP_004
The Kakono hydropower site is located on the Kagera River, Northwest Tanzania near the border with Uganda. As a key component of Tanzania's energy strategy, Kakono offers a strategic opportunity…
Energy Tanzania East Africa 2024-01-NRBIP
$96M Feasibility Active
30
Lusahunga-Rusumo Road T.08.03.25
Rehabilitation of 91 km of single carriageway road between Lusahunga and Rusumo in Tanzania.
Transport Tanzania East Africa pap1
$73M Tendering Active
31
Karazi Multipurpose Water Resources Development Project BIP_NELSAP_013
Water Tanzania East Africa 2024-01-NRBIP
$63M Feasibility Active
32
Tabora-Nyahua Road T.08.03.19
Upgrading of 85 km of single carriageway road from Tabora to Nyahua in Tanzania.
Transport Tanzania East Africa pap1
$58M Operation Completed
33
Extension of National ICT Broadband Backbone (NICTBB) to DRC by construction of optical fibre cable across Lake Tanganyika and point of presences (PoPs) for providing connectivity with DRC I.02.30.10
The project involves the construction of a submarine optical fiber cable across Lake Tanganyika, connecting Kigoma in Tanzania to Kalemie in the Democratic Republic of the Congo (DRC). The cable…
ICT Democratic Republic of Congo, Mozambique, Tanzania Central Africa, East Africa, Southern Africa 2020
$56M Pre-Feasibility Active
34
ZTK Transmission Interconnector (Kenya section) E.02.03.02
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the 96km Kenyan section of the 2,800km ZTK interconnector, which runs from…
Energy Kenya, Tanzania, Zambia East Africa, Southern Africa EAPP
$50M Operation Active
35
Peatland Emission Avoidance through Transboundary Watershed Investments Supporting Sustainable Ecosystems and Livelihoods BIP_NELSAP_002
PEAT-WISE was conceived to address the growing threats to peatlands caused by unsustainable practices such as drainage for agriculture, burning, and peat extraction. These activities have led to land degradation,…
Water Burundi, Rwanda, Tanzania, Uganda East Africa 2024-01-NRBIP
$42M Project Structuring Active
36
Mutukula OSBP T.08.02.03
Construction of Mutukula One-Stop Border Post between Tanzania and Uganda. Border type: Juxtaposed.
Transport Tanzania, Uganda East Africa pap1
$15M Operation Active
37
Mwanza Port Dredging and Upgrading T.05.04.03
The project comprise of the following: (1) complete or initiate dredging of port of Mwanza to restore design depths of generally around 6 m on approach to, in anchorage and…
Transport Tanzania East Africa pap1
$10M Construction Active
38
SADC Regional Carrier-Neutral Data Centre I.02.30.07
The SADC Regional Carrier-Neutral Data Centre a strategic ICT infrastructure project under the PIDA Priority Action Plan 2 (PAP2) to develop a Tier III certified, carrier-neutral data centre to serve…
ICT Angola, Botswana, Democratic Republic of Congo, Eswatini, Lesotho, Madagascar, Malawi, Mauritius, Mozambique, Namibia, SADC Countries, Seychelles, South Africa, Tanzania, Zambia, Zimbabwe Central Africa, East Africa, Southern Africa 2020
$9M Project Definition Active
39
Extension of National ICT Broadband Backbone (NICTBB) to Mozambique I.02.30.08
The project involves the extension of the Tanzania National ICT Broadband Backbone (NICTBB) southwards to connect with Mozambique's national backbone via the Mtambaswala border crossing. The primary component is the…
ICT Mozambique, Tanzania East Africa, Southern Africa 2020
$2M Pre-Feasibility Active
40
Agriculture and Climate Risk Management in the Lake Victoria Basin Programme
The programme will contribute to the reduction of emissions estimated to be 149,505,100 tCO2-eq. This estimation is based on 2006 IPCC Guidelines for National Greenhouse Gas Inventories and National…
Water Burundi, Kenya, Rwanda, Tanzania, Uganda East Africa Z1.00.00
Not reported Enabling Environment and Needs Assessment Active
41
Berths 13 – 14 in Port of Dar es Salaam (Tanzania).
Transport Tanzania East Africa
Not reported Active
42
Chaya-Manyoni Road T.08.03.20
Data not available
Transport Tanzania East Africa pap1
Not reported Construction Active
43
Construction of Standard Gauge railway from Mtwara - Mbamba Bay railway with/and spurs to Liganga, and Mchuchuma (MALAWI SECTION)
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal…
Transport Malawi, Mozambique, Tanzania, Zimbabwe East Africa, Southern Africa T.11
Not reported Transaction Support & Financial Close Active
44
Construction of Standard Gauge railway from Mtwara - Mbamba Bay railway with/and spurs to Liganga, and Mchuchuma (Mozambique Section)
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal…
Transport Malawi, Mozambique, Tanzania, Zimbabwe East Africa, Southern Africa T.11
Not reported Transaction Support & Financial Close Active
45
Construction of Standard Gauge railway from Mtwara - Mbamba Bay railway with/and spurs to Liganga, and Mchuchuma (TANZANIA SECTION)
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal…
Transport Malawi, Mozambique, Tanzania, Zimbabwe East Africa, Southern Africa T.11
Not reported Transaction Support & Financial Close Active
46
Construction of Standard Gauge railway from Mtwara - Mbamba Bay railway with/and spurs to Liganga, and Mchuchuma (Zimbabwe section)
The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal…
Transport Malawi, Mozambique, Tanzania, Zimbabwe East Africa, Southern Africa T.11
Not reported Transaction Support & Financial Close Active
47
Dar es Salaam - Kampala Fibre-optic Link (Tanzania section) I.02.29.01
ICT Tanzania, Uganda East Africa pap1
Not reported Construction Completed
48
Dar es Salaam New SPM Oil Terminal T.08.04.02
Construction of new SPM Oil Terminal at Dar es Salaam Port (Tanzania).
Transport Tanzania East Africa pap1
Not reported Operation Completed
49
Dar es Salaam Port Access Roads Development T.08.03.08
The project involves the construction of a grade separated flyover for Morogoro Road / Nelson Mandela intersection.
Transport Tanzania East Africa pap1
Not reported Project Definition Active
50
Dar es Salaam-Bujumbura Fibre-optic Link (Tanzania Section) I.02.28.01
ICT Burundi, Tanzania East Africa pap1
Not reported Operation Completed
Showing 50 of 75 published projects (Page 1 of 2)
Per page: 50 100 150 1 2 Next →
0 projects selected
AID Showcase 1 / 50
aid.nepad.org

Intelligent AID — Create Showcase

Showcase ready! You have a previously generated AI showcase for these projects in this session.

Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.

Narrative Style

Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment

Tone & Mood

Will generate for 15 projects (top by investment value). Estimated time: ~2 min.
Preparing...