Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.

647 published projects6 presentation themesAtlas map modeVoice narration
  1. 1Filter projectsby sector, country, stage or programme
  2. 2Selectthe projects you want to present
  3. 3Create a showwith AID Intelligence and present full screen
43 of 43 published projects
#
Project
Investment · stage
1
Establishment of a Navigational Line between Lake Victoria and the Mediterranean Sea - Feasibility Study Phase 2 (VICMED) T.IW.26.04
The VICMED initiative proposes an integrated navigation and multimodal transport corridor from Lake Victoria to the Mediterranean Sea. It is intended to connect Nile Basin countries through river, lake and…
Transport Burundi, Democratic Republic of Congo, Egypt, Ethiopia, Kenya, Rwanda, South Sudan, Sudan, Tanzania, Uganda Central Africa, East Africa, North Africa, North-Eastern Africa 2020
$12B Feasibility Active Express interest →
2
Egypt and Sudan Electrical Grid as the First Stage of the Continental Electrical Interconnection E.30.14
The first stage will connect Egypt and Sudan along the Cairo-Cape Town road corridor through two high-voltage circuits. The PP2 concept considers 1,000 kV HVDC or a combination of 800…
Energy Egypt, Sudan North Africa, North-Eastern Africa 2020
$2.2B Feasibility Active Express interest →
3
Eastern Africa Green Power Transmission Network Project 6 - Guba (Ethiopia)-Khartoum (Sudan) E.30.06
The project will develop a cross-border high-voltage alternating-current transmission line from Guba in Ethiopia to Khartoum in Sudan. It is one of the interconnections proposed under the Eastern Africa Green…
Energy Ethiopia, Sudan North-Eastern Africa 2020
$670M Feasibility Active Express interest →
4
Egypt - Sudan Transmission Interconnector (Egypt section) E.02.01.01
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote…
Energy Egypt, Sudan North Africa, North-Eastern Africa pap1
$568M Operation Active Express interest →
5
Ethiopia - Sudan Transmission Interconnector (Sudan section) E.02.02.02
This project concerns the Sudan section of a high-voltage Ethiopia-Sudan power interconnection designed to move power from Ethiopia into Sudan and strengthen the Eastern Africa Power Pool. The existing database…
Energy Ethiopia, Sudan North-Eastern Africa IGAD
$484M Feasibility Stall Express interest →
6
Ethiopia-Sudan Power System Interconnection Project (Assosa-New Raback, New Jabel Awelya) BIP_EAPP_001
The Ethiopia-Sudan Power System Interconnection Project (Grand Renaissance-New Rabak, New Jabel Awelya) connects power generated by Ethiopia's Grand Ethiopian Renaissance Dam (GERD), via Assosa, to new substations at Rabak and…
Energy Ethiopia, South Sudan, Sudan North-Eastern Africa EAPP
$440M Feasibility Active Express interest →
7
El Fasher-Kabkabiya-El Geneina-Adri Road T.RD.26.06
The project is intended to provide a paved regional road from El Fasher through Kabkabiya and El Geneina to Adri at the Chad border. It covers about 328 km of…
Transport Chad, Sudan Central Africa, North-Eastern Africa 2020
$262M Project Definition Active Express interest →
8
Renk - Malakal Power Transmission Line BIP_NELSAP_022
The South Sudan (Renk) - South Sudan (Malakal) 220 kV High Voltage Power Transmission Interconnector project is located in the Upper Nile region, connecting the town of Renk in South…
Energy South Sudan, Sudan North-Eastern Africa 2024-01-NRBIP
$154M Feasibility Active Express interest →
9
Egypt - Sudan Transmission Interconnector (Sudan section) E.02.01.02
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project…
Energy Egypt, Sudan North Africa, North-Eastern Africa pap1
$120M Operation Active Express interest →
10
Rihaid El Birdi–Om Dafug Road T.RD.26.09
The project proposes construction of approximately 128.3 km of paved road from Rihaid El Birdi in Sudan to Om Dafug at the Central African Republic border. It would improve a…
Transport Central African Republic, Sudan Central Africa, North-Eastern Africa 2020
$103M Feasibility Active Express interest →
11
Wad Meskin Irrigation Project BIP_ENTRO_023
Wad Meskin barrage across Rahad River has been planned to regulate the flood flows during rainy season, for Dinder and Rahad rivers so as to satisfy the needs of Rahad…
Water Sudan North-Eastern Africa ENTRO
$69M Project Structuring Active Express interest →
12
The Ethiopia-Sudan Transmission Interconnection Project
The power system interconnection project involved the construction of a high voltage transmission line from Ethiopia to Sudan to utilise surplus hydropower from Ethiopia to replace oil-based thermal generation in…
Energy Ethiopia, Sudan North-Eastern Africa ENTRO
$66M Operation Active Express interest →
13
Sudan Section of the Fiber Optic Connectivity Component of the Port Sudan to Douala Corridor I.02.30.09
High-quality ducted fiber corridor linking Port Sudan undersea cable landings to inland Central African states, supporting broadband connectivity to Chad, Central African Republic, Ethiopia, and South Sudan. The corridor positions…
ICT Cabo Verde, Central African Republic, Chad, Ethiopia, South Sudan, Sudan Central Africa, North-Eastern Africa, West Africa 2020
$55M Pre-Feasibility Active Express interest →
14
Flood-Risk Mapping and Early Warning System BIP_ENTRO_010
To contribute to the improvement of the Eastern Nile Flood Risk Mitigation (EN-FRM) Project the following outputs are planned: An enhanced EN FFEWS, so that reliable flood forecasts and early…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$45M Feasibility Active Express interest →
15
Atbara-Kerib Land Rehabilitation Project (Integrated Watershed Management in Priority Catchments (Atbara Watersheds)) BIP_ENTRO_011
The Atbara Kerib Land Rehabilitation Project was one of 13 potential first-round investment projects identified in 2007 under the Cooperative Regional Assessment (CRA) of Watershed Management in the Eastern Nile…
Water Sudan North-Eastern Africa ENTRO
$36M Project Structuring Active Express interest →
16
GERD (Ethiopia)- Khartoum (Sudan)Transmission Line E.02.02.01
Construction of a transmission line (580 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The…
Energy Ethiopia, Sudan North-Eastern Africa IGAD
$29M Project Structuring Stall Express interest →
17
Integrated Watershed Management in Dinder/Alitash national park sub-catchment BIP_ENTRO_014
The Alatish-Dinder Transboundary Park Project was one of 13 potential first-round investment projects identified in 2007 under the Cooperative Regional Assessment (CRA) of Watershed Management in the Eastern Nile Basin.…
Water Ethiopia, Sudan North-Eastern Africa ENTRO
$12M Pre-Feasibility Active Express interest →
18
Transboundary Hydro-Meteorological and Environmental Monitoring System and Environmental Flows Assessment
Transboundary Hydro-Meteorological and Environmental Monitoring System and Environmental Flows Assessment Project is one of nine medium and long-term projecs identified and prioiritized under the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Study…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$10M Feasibility Active Express interest →
19
Telkuk Water Harvesting Project BIP_ENTRO_022
Telkuk Water Harvesting Project Telkuk Water Harvesting Project is to promote the sustainable management of rangeland in the Talkuk Locality, Kassala State. Proposed project interventions include: Increasing water harvesting through constructing traditional teras, libish,…
Water Sudan North-Eastern Africa ENTRO
$8M Pre-Feasibility Active Express interest →
20
Akobo-Gambella Floodplains Transboundary Development Programme BIP_ENTRO_007
The Akobo-Gambella floodplains transboundary development programme is one of the three short term projects proposed as part of the Baro-Akobo-Sobat multipurpose water resources development study project. The three short term…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$8M Feasibility Active Express interest →
21
Sudd Wetlands Management Plan
The Sudd wetland is one of the most unique and valuable ecosystems on Earth. It is the largest wetland in Africa, and a designated a Ramsar site. The Sudd wetlands…
Water Egypt, Ethiopia, Kenya, South Sudan, Sudan, Uganda East Africa, North Africa, North-Eastern Africa ENTRO
$6M Project Definition Active Express interest →
22
Integrated BAS Hydropower, Irrigation and Multipurpose Development Programme - Phase 1: Baro/Sobat Component. BIP_ENTRO_003
Integrated BAS Hydropower, Irrigation and Multipurpose Development Programme - Phase 1: Baro/Sobat Component.’ is one of nine priority medium to long-term projects under the Integrated Water Resources Development and Management…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$1M Pre-Feasibility Active Express interest →
23
Sudan Hydropower Sequencing and Operations Study (Sherieq, Dal/Low Dal, Kajbar, Dagash, Mugrat, and Sabaloka HPP Project) BIP_ENTRO_006
The Dal project site is located on the Nile in Sudan some 280 km downstream of Dongola and immediately upstream of Lake Nubia / Lake Nasser. The project comprises of a 30 m…
Energy Sudan North-Eastern Africa ENTRO
$1M Pre-Feasibility Active Express interest →
24
Integrated Watershed Management in Priority Catchment (Dinder/Rahad Watersheds Management Projects) BIP_ENTRO_013
Dinder and Rahad Rivers originate in the Ethiopian Highlands and flow northwestwards before joining with the Abbay River downstream of Sennar dam to form the Blue Nile River. The two…
Water Sudan North-Eastern Africa ENTRO
$1M Pre-Feasibility Active Express interest →
25
Review of Eastern Nile Livelihood Based Watershed Management programme - prioritizing interventions and taking to for scale for a basin wide impact BIP_ENTRO_018
Its main aim is to promote transboundary cooperation among Ethiopia, Sudan and South Sudan, to tackle watershed degradation, reduce sedimentation, and foster sustainable livelihoods and food security. The Baro-Akobo-Sobat IWRDMPlan's…
Water Ethiopia, South Sudan, Sudan North-Eastern Africa ENTRO
$1M Feasibility Active Express interest →
26
Butana Plains Watershed Management Project
The Butana Plains Watershed Management Project was one of 13 potential first-round investment projects identified in 2007 under the Cooperative Regional Assessment (CRA) of Watershed Management in the Eastern Nile…
Water Sudan North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
27
Development of a Continental Aviation Infrastructure Master Plan Including a Seamless Airspace Architecture T.AV.26.01
The project supports operationalisation of the Single African Air Transport Market by addressing the infrastructure and airspace-management constraints that limit safe, efficient and competitive air transport. It covers both physical…
Transport Algeria, Angola, Benin, Botswana, Burkina Faso, Burundi, Cabo Verde, Cameroon, Central African Republic, Chad, Comoros, Côte d'Ivoire, Democratic Republic of Congo, Djibouti, Egypt, Equatorial Guinea, Eritrea, Eswatini, Ethiopia, Gabon, Gambia, Ghana, Guinea, Guinea-Bissau, Kenya, Lesotho, Liberia, Libya, Madagascar, Malawi, Mali, Mauritania, Mauritius, Morocco, Mozambique, Namibia, Niger, Nigeria, Republic of Congo, Rwanda, SADC Countries, Sao Tome and Principe, Senegal, Seychelles, Sierra Leone, Somalia, South Africa, South Sudan, Sudan, Tanzania, Togo, Tunisia, Uganda, Zambia, Zimbabwe, _Not Applicable African Continent, Central Africa, East Africa, North Africa, North-Eastern Africa, Southern Africa, West Africa 2020
Not reported Project Definition Active Express interest →
28
Eastern Nile Transboundary Water Quality Monitoring Programme
Rapid population increase coupled with expanding agriculture, urbanisation, industrialisation, aging waste water treatment infrastructure and expansion of irrigation schemes in the Eastern Nile pose a serious threat to water quality…
Water Egypt, Ethiopia, South Sudan, Sudan North Africa, North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
29
Grand Ethiopian Renaissance Dam (GERD) E.01.01
The Grand Ethiopian Renaissance Dam (GERD ) formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is a gravity dam on the Blue Nile River in…
Energy Egypt, Ethiopia, Sudan North Africa, North-Eastern Africa IGAD
Not reported Operation Active Express interest →
30
Nubian Sandstone Aquifer System W.07.01
The Nubian Sandstone Aquifer System (NSAS) underlies the countries of Chad, Egypt, Libya and Sudan, the total population of which is over 136 million. It is the world’s largest ‘fossil’…
Water Chad, Egypt, Libya, Sudan Central Africa, North Africa, North-Eastern Africa IGAD
Not reported Tendering Active Express interest →
31
Port Sudan - Dakar railroad
Transport Burkina Faso, Chad, Mali, Niger, Senegal, Sudan Central Africa, North-Eastern Africa, West Africa
Not reported Express interest →
32
Rehabilitation and modernization of the existing Irrigation schemes: Baro-Akobo-Sobat/White Nile
There are more than 5.3 million ha of land currently under irrigation in the Eastern Nile, most with a poorThe project identification was completed in 2015 with funding from the…
Water Egypt, Ethiopia, South Sudan, Sudan North Africa, North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
33
Renk (South Sudan/Sudan) OSBP T.05.02.06
Construction of the One-Stop Border Post between South Sudan and Sudan, which lies on the Northern Corridor.
Transport South Sudan, Sudan North-Eastern Africa IGAD
Not reported Project Definition Active Express interest →
34
Sudan-Eritrea Fibre-optic Link (Sudan section) I.02.02.01
Construction of Sudan section of the fibre optic link between Khartoum (Sudan) and Asmara (Eritrea). 3
ICT Eritrea, Sudan North-Eastern Africa IGAD
Not reported Project Definition Active Express interest →
35
TAH6: Ndjamena to Djibouti - Missing Road Links in Sudan T.01.01.02
Transport Sudan North-Eastern Africa IGAD
Not reported Pre-Feasibility Active Express interest →
36
Transboundary Watershed/Wetland Management Project (Sudan and Ethiopia)
This project will be located in the Blue Nile Sub-basin covering among others the ecological significant watersheds of the Dinder and Rahad Rivers. The two rivers originate in the Ethiopian Highlands and flow…
Water Ethiopia, Sudan North-Eastern Africa
Not reported Project Definition Active Express interest →
37
Transport and Navigation - NEL and Eastern Nile Regions
The Regional Transport and Navigation Development Project is one of several priority projects under the Integrated Water Resources Development and Management Plan for the Baro-Akobo-Sobat Sub-basin in the Eastern Nile…
Transport Egypt, Ethiopia, South Sudan, Sudan North Africa, North-Eastern Africa ENTRO
Not reported Project Definition Active Express interest →
38
Watershed management in priority catchments (Lake Nasser/Lake Nubia)
The project was identified and prepared under the Eastern Nile Watershed Management Project in 2007, and implemented nationally. The project objective was to support the development of a Lake Nasser/Nubia…
Water Egypt, Sudan North Africa, North-Eastern Africa ENTRO
Not reported Operation Completed Express interest →
39
Juba-Bor-Malakal-Renki-Sudan border Railway T.05.05.02
Transport South Sudan, Sudan North-Eastern Africa IGAD
Not reported Project Definition Active Express interest →
40
Juba-Bor-Malakal-Renki-Sudan border Road T.05.03.13
Transport South Sudan, Sudan North-Eastern Africa IGAD
Not reported Project Definition Active Express interest →
41
Khartoum-Asmara Fibre-optic Link (Eritrea section) I.02.02.02
Construction of Eritrea section of the fibre optic link between Khartoum (Sudan) and Asmara (Eritrea).
ICT Eritrea, Sudan North-Eastern Africa pap1
Not reported Active Express interest →
42
Ndjamena-Khartoum Fibre-optic Link (Chad section) I.02.26.01
ICT Chad, Sudan Central Africa, North-Eastern Africa pap1
Not reported Active Express interest →
43
Ndjamena-Khartoum Fibre-optic Link (Sudan section) I.02.26.02
ICT Chad, Sudan Central Africa, North-Eastern Africa IGAD
Not reported Active Express interest →
Showing 43 of 43 published projects (Page 1 of 1)
Per page: 50 100 150 1
0 projects selected
AID Showcase 1 / 43
aid.nepad.org

Intelligent AID — Create Showcase

Showcase ready! You have a previously generated AI showcase for these projects in this session.

Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.

Narrative Style

Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment

Tone & Mood

Will generate for 15 projects (top by investment value). Estimated time: ~2 min.
Preparing...