African Infrastructure Database
Connecting Africa through infrastructure

Project Showcase

Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.

647 published projects6 presentation themesAtlas map modeVoice narration
  1. 1Filter projectsby sector, country, stage or programme
  2. 2Selectthe projects you want to present
  3. 3Create a showwith AID Intelligence and present full screen
43 of 43 published projects
#
Project
Investment · stage
1
Douala-Gaound-N'Djamena: Railway and Intermodal Facility T.20.04
The project entails the construction of the 2000 km railway line from Douala Port through Cameroon to N'Djamena in Chad.
Transport Cameroon, Chad Central Africa pap1
2
Yaounde-Brazzaville Road (Cameroon section) T.21.10.01
Construction and upgrading of the approx. 2,000 km single carriageway road from Yaounde (Cameroon) to Brazzaville (Congo). In particular, this project involves the section in Cameroon, from Yaounde to the…
Transport Cameroon, Republic of Congo Central Africa pap1
$2.1B Construction Active Express interest →
3
Development of the Chollet Hydroelectric Site and Associated Transmission Lines E.30.10
The PP2 project comprises development of a hydroelectric power station with an installed capacity of 600 MW and construction of associated transmission lines to supply localities in northern Republic of…
Energy Cameroon, Republic of Congo Central Africa 2020
$2B Project Structuring Active Express interest →
4
Continental Africa Water Investment Support Programme (AIP) W.30.01
AIP provides an enabling and project-preparation framework for priority transboundary and regional water investments submitted by African member states. It supports integrated water, health, energy and food-security projects; strengthens institutional…
Water Benin, Cameroon, Ghana, Kenya, Nigeria, Tunisia, Uganda, Zambia Central Africa, East Africa, North Africa, Southern Africa, West Africa 2020
$1.9B Project Definition Active Express interest →
5
Chad - Cameroon Transmission Interconnector (Chad section) E.06.04.01
Construction of the Chad section of the 1,064 km / 400 kV Chad-Cameroon Transmission Interconnector.
Energy Cameroon, Chad Central Africa pap1
$1.4B Construction Active Express interest →
6
Brazzaville-Kinshasa Road/Rail Bridge T.19.01
The project includes the construction of a road and rail bridge between Brazzaville in Congo and Kinshasa in the DRC. The project also includes road and rail links in both…
Transport Cameroon, Democratic Republic of Congo, Gabon, Republic of Congo Central Africa pap1
$459M Tendering Active Express interest →
7
Ntem River Bridge on the Kribi-Campo-Bata Transnational Road T.BR.26.01
The Ntem River Bridge is intended to close a major missing link between Cameroon and Equatorial Guinea on the Kribi-Campo-Bata road corridor. It will support a continuous regional route connecting…
Transport Cameroon, Equatorial Guinea, Gabon Central Africa 2020
$447M Transaction Support & Financial Close Active Express interest →
8
Ketta-Djoum Road T.21.10.02
Le projet de route Ketta-Djoum consiste en sa deuxième phase au bitumage de la section Sembe (Congo)-Mintom (Cameroun). Les travaux concernent les tronçons Sembe-Souanké-Ntam(143km) au Congo et Mintom-Lele-Ntam(90km) au Cameroun,…
Transport Cameroon, Republic of Congo Central Africa pap1
$410M Construction Active Express interest →
9
Garoua - Boulai - Gaound Road T.20.03.03
Upgrading of the 240 km single carriageway road from Garoua to Boulai to N’Gaoundéré in Cameroon.
Transport Cameroon Central Africa pap1
$226M Active Express interest →
10
Koussérè OSBP. T.20.02.01
The project involves the construction of the Kousséré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
Transport Cameroon, Chad Central Africa pap1
$110M Construction Active Express interest →
11
Development of Data Centre Infrastructures Underpinning the Digital Economy I.02.30.04
The Development of Data Centre Infrastructures Underpinning the Digital Economy is a regional ICT programme under the Economic Community of Central African States (ECCAS). It envisions establishing six new…
ICT Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and Principe Central Africa, East Africa, Southern Africa, West Africa 2020
$93M Project Definition Active Express interest →
12
Interconnection of Member States' Broadband Networks I.02.30.11
Regional project under PIDA PAP 2 (2021-2030) to provide and strengthen each ECCAS Member State with high bandwidth fiber optic connectivity and establish a sub-regional data hosting centre in the…
ICT Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and Principe Central Africa, East Africa, Southern Africa, West Africa 2020
$92M Project Definition Active Express interest →
13
Fomi Multipurpose Dam Development Project W.30.10
The Fomi project is a multipurpose dam proposed on the Niandan River in Guinea within the Upper Niger Basin. The approved project concept includes a reservoir of about 4,978 million…
Water Benin, Burkina Faso, Cameroon, Chad, Côte d'Ivoire, Guinea, Mali, Niger, Nigeria Central Africa, West Africa 2020
$55M Feasibility Active Express interest →
14
Mobilisation and Transfer of Water from Bria Dam to Lake Chad W.30.14
The project would improve the hydraulic capacity of the Chari River and design the infrastructure required to transfer water by gravity from the proposed Bria Dam toward the Chari and…
Water Cameroon, Central African Republic, Chad, Libya, Niger, Nigeria Central Africa, North Africa, West Africa 2020
$26M Pre-Feasibility Active Express interest →
15
Garoua Boulai OSBP T.20.02.03
Construction of the Garoua Boulai One-Stop Border Post between Cameroon and Central African Republic on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
Transport Cameroon, Central African Republic Central Africa pap1
$10M Pre-Feasibility Active Express interest →
16
Koutéré OSBP. T.20.02.02
The project involves the construction of Koutéré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
Transport Cameroon, Chad Central Africa pap1
$10M Active Express interest →
17
Abuja-Younde Fibre-optic Link (Nigeria section) I.02.13.01
Data not available
ICT Cameroon, Nigeria Central Africa, West Africa pap1
Not reported Active Express interest →
18
Cameroon IXP I.03.27
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
ICT Cameroon Central Africa pap1
Not reported Operation Active Express interest →
19
Campo OSBP T.20.02.04
Construction of the Campo One-Stop Border Post between Cameroon and Equatorial Guinea, which lies on the Douala- Bangui- Douala- N’Djamena Corridor.
Transport Cameroon, Equatorial Guinea Central Africa pap1
Not reported Active Express interest →
20
Development of a Continental Aviation Infrastructure Master Plan Including a Seamless Airspace Architecture T.AV.26.01
The project supports operationalisation of the Single African Air Transport Market by addressing the infrastructure and airspace-management constraints that limit safe, efficient and competitive air transport. It covers both physical…
Transport Algeria, Angola, Benin, Botswana, Burkina Faso, Burundi, Cabo Verde, Cameroon, Central African Republic, Chad, Comoros, Côte d'Ivoire, Democratic Republic of Congo, Djibouti, Egypt, Equatorial Guinea, Eritrea, Eswatini, Ethiopia, Gabon, Gambia, Ghana, Guinea, Guinea-Bissau, Kenya, Lesotho, Liberia, Libya, Madagascar, Malawi, Mali, Mauritania, Mauritius, Morocco, Mozambique, Namibia, Niger, Nigeria, Republic of Congo, Rwanda, SADC Countries, Sao Tome and Principe, Senegal, Seychelles, Sierra Leone, Somalia, South Africa, South Sudan, Sudan, Tanzania, Togo, Tunisia, Uganda, Zambia, Zimbabwe, _Not Applicable African Continent, Central Africa, East Africa, North Africa, North-Eastern Africa, Southern Africa, West Africa 2020
Not reported Project Definition Active Express interest →
21
Douala Bridge T.20.05
Construction of the Douala Bridge (Cameroon).
Transport Cameroon Central Africa pap1
Not reported Tendering Active Express interest →
22
Douala-Gaound-N'Djamena Road Links in Cameroon T.20.03.01
Construction of road sections on Douala-N’Gaoundéré-N'Djamena road (Cameroon).
Transport Cameroon Central Africa pap1
Not reported Active Express interest →
23
Feasibility and In-depth Studies on the Development of Lake Chad W.30.07
The project is a coordinated feasibility, technical-study and action-programme package for Lake Chad and its principal tributaries. It addresses poorly quantified sedimentation and siltation, invasive aquatic vegetation, unequal water distribution…
Water Cameroon, Central African Republic, Chad, Niger, Nigeria Central Africa, West Africa 2020
Not reported Feasibility Active Express interest →
24
Inga-Calabar Transmission Interconnector (DRC section) E.06.02.01
Energy Cameroon, Democratic Republic of Congo, Equatorial Guinea, Gabon, Nigeria, Republic of Congo Central Africa, West Africa pap1
Not reported Active Express interest →
25
Interconnexion des réseaux électriques du Cameroun et du Tchad: Chad-Cameroon Transmission Interconnector. E.06.04.02
1. Volet interconnexion des réseaux électriques du Cameroun et du Tchad: L"’interconnexion Ngouandéré (Cameroun) et Gassi (Tchad) comprend : Des lignes bi ternes et mono terne 225 kV en courant alternatif sur une…
Energy Cameroon, Chad Central Africa pap1
Not reported Construction Active Express interest →
26
Kribi-Campo Bata Road T.21.01
The project entails detailed studies and engineering designs for the construction of a bridge over the Ntem River and its access roads linking the Republics of Cameroon and Equatorial Guinea. The…
Transport Cameroon, Equatorial Guinea Central Africa pap1
Not reported Project Structuring Active Express interest →
27
Ntem River Bridge T.21.02
The study of the Ntem River Bridge is part of the Kribi-Campo-Bata maritime route linking the port of Kribi to Cameroon and Bata in Equatorial Guinea. The inter-capital connections study…
Transport Cameroon, Equatorial Guinea, Gabon Central Africa pap1
Not reported Transaction Support & Financial Close Active Express interest →
28
TAH8: Lagos to Mombasa - Missing Road Links in Cameroon T.01.04.01
Transport Cameroon Central Africa pap1
Not reported Active Express interest →
29
Yaounde-Brazzaville Road (Congo section) T.21.10.02
Construction and upgrading of the approx. 2,000 km single carriageway road from Yaounde (Cameroon) to Brazzaville (Congo). In particular, this project involves the section in Congo, from the border with…
Transport Cameroon, Republic of Congo Central Africa pap1
Not reported Construction Active Express interest →
30
Abuja-Younde Fibre-optic Link (Cameroon section) I.02.13.02
ICT Cameroon, Nigeria Central Africa, West Africa pap1
Not reported Active Express interest →
31
Brazzaville-Yaounde Fibre-optic Link (Cameroon section) I.02.25.02
ICT Cameroon, Republic of Congo Central Africa pap1
Not reported Active Express interest →
32
Brazzaville-Yaounde Fibre-optic Link (Congo section) I.02.25.01
ICT Cameroon, Republic of Congo Central Africa pap1
Not reported Project Definition Active Express interest →
33
Douala Port Upgrade T.23.02.01
Transport Cameroon Central Africa pap1
Not reported Construction Active Express interest →
34
Inga-Calabar Transmission Interconnector (Cameroon section) E.06.02.05
Energy Cameroon, Democratic Republic of Congo, Equatorial Guinea, Gabon, Nigeria, Republic of Congo Central Africa, West Africa pap1
Not reported Pre-Feasibility Active Express interest →
35
Inga-Calabar Transmission Interconnector (Congo section) E.06.02.02
Energy Cameroon, Democratic Republic of Congo, Equatorial Guinea, Gabon, Nigeria, Republic of Congo Central Africa, West Africa pap1
Not reported Pre-Feasibility Active Express interest →
36
Inga-Calabar Transmission Interconnector (Equatorial Guinea section) E.06.02.04
Energy Cameroon, Democratic Republic of Congo, Equatorial Guinea, Gabon, Nigeria, Republic of Congo Central Africa, West Africa pap1
Not reported Pre-Feasibility Active Express interest →
37
Inga-Calabar Transmission Interconnector (Gabon section) E.06.02.03
Energy Cameroon, Democratic Republic of Congo, Equatorial Guinea, Gabon, Nigeria, Republic of Congo Central Africa, West Africa pap1
Not reported Pre-Feasibility Active Express interest →
38
Inga-Calabar Transmission Interconnector (Nigeria section) E.06.02.06
Energy Cameroon, Democratic Republic of Congo, Equatorial Guinea, Gabon, Nigeria, Republic of Congo Central Africa, West Africa pap1
Not reported Pre-Feasibility Active Express interest →
39
Kribi Port Upgrade T.23.02.02
Transport Cameroon Central Africa pap1
Not reported Construction Active Express interest →
40
Malabo-Yaounde-Libreville Fibre-optic Link (Cameroon section) I.02.12.01
ICT Cameroon, Gabon Central Africa pap1
Not reported Active Express interest →
41
Malabo-Yaounde-Libreville Fibre-optic Link (Equatorial Guinea section) I.02.12.03
ICT Cameroon, Equatorial Guinea, Gabon Central Africa pap1
Not reported Active Express interest →
42
Malabo-Yaounde-Libreville Fibre-optic Link (Gabon section) I.02.12.02
ICT Cameroon, Gabon Central Africa pap1
Not reported Active Express interest →
43
Yaoundé Ville Airport Expansion T.22.03.01
This project is part of the expansions at 2020 gap airports Phase 1. It will see upgrades at Yaounde Ville Airport in Yaounde, Cameroon.
Transport Cameroon Central Africa pap1
Not reported Active Express interest →
Showing 43 of 43 published projects (Page 1 of 1)
Per page: 50 100 150 1
0 projects selected
AID Showcase 1 / 43
aid.nepad.org

Intelligent AID — Create Showcase

Showcase ready! You have a previously generated AI showcase for these projects in this session.

Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.

Narrative Style

Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment

Tone & Mood

Will generate for 15 projects (top by investment value). Estimated time: ~2 min.
Preparing...