The Bugarama- Bujumbura road is about 35 km on the RN1, and forms part of the Central Corridor.
TransportBurundiEast Africapap1
$105MFeasibilityActive
152
Bulawayo - Gwanda Road
The road runs in a south westernly direction from Bulawayo to the Beitbridge Border Post (between Botswana and South-Africa), covering a total of 320km. See this project on an interactive…
The project proposes construction of approximately 128.3 km of paved road from Rihaid El Birdi in Sudan to Om Dafug at the Central African Republic border. It would improve a…
Ethiopia (Gambela) - South Sudan (Malakal) Power Transmission Line - Phase 1BIP_NELSAP_021
The Ethiopia (Gambela) - South Sudan (Malakal) Power Transmission Line - Phase 1 project is located in the transboundary corridor connecting the Gambela region in southwestern Ethiopia to Malakal in…
EnergyEthiopia, South SudanNorth-Eastern Africa2024-01-NRBIP
$102MProject StructuringActive
155
TAH2: Algiers to Lagos - Missing Road Links in NigerT.01.02.02
TransportNigerWest Africapap1
$102MConstructionActive
156
Horn of Africa Groundwater for Resilience Program IIBIP_IGAD_001
Why this Project is Needed Now?
The project is a timely intervention to strengthen the climate resilience of targeted communities in a region frequently affected by drought. By focusing on sustainable…
WaterKenyaEast AfricaIGAD
$100MFeasibilityActive
157
Kakono Hydropower ProjectBIP_NELSAP_004
The Kakono hydropower site is located on the Kagera River, Northwest Tanzania near the border with Uganda.
As a key component of Tanzania's energy strategy, Kakono offers a strategic opportunity…
EnergyTanzaniaEast Africa2024-01-NRBIP
$96MFeasibilityActive
158
Integrated Management of Transboundary Water Resources of Lakes Rweru, Cyohoha and the Akanyaru Marshlands (GIRET)BIP_NELSAP_001
The project area covers the Akanyaru marshland, the Lakes Cyohoha and Rweru and their watersheds shared by Rwanda and Burundi, and is located in the Akanyaru sub-basin and the downstream…
WaterBurundi, RwandaEast Africa
$95MFeasibilityActive
159
Support Programme for the Facilitation of Transport by Inland Waterways, Securing River Navigation and the Sustainable Management of Water Resources in the Congo BasinW.30.15
The Congo Basin contains more than 25,000 km of naturally navigable waterways, including at least 15,000 km of classified routes. Managed through CICOS, the programme will improve the safety, reliability…
WaterAngola, Cabo Verde, Central African Republic, Chad, Democratic Republic of Congo, Gabon, Republic of CongoCentral Africa, Southern Africa, West Africa2020
$94MProject DefinitionActive
160
Harare - Nyamapanda Road Project
The road runs in a north-easterly direction from Harare to the Nyamanpanda Border Post (between Zimbabwe and Mozambique), covering a total distance of 278km. See this project on an interactive…
TransportMalawi, Mozambique, South Africa, ZimbabweSouthern Africapap1
$93MTransaction Support & Financial CloseActive
161
Development of Data Centre Infrastructures Underpinning the Digital EconomyI.02.30.04
The Development of Data Centre Infrastructures Underpinning the Digital Economy is a regional ICT programme under the Economic Community of Central African States (ECCAS). It envisions establishing six new…
ICTAngola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and PrincipeCentral Africa, East Africa, Southern Africa, West Africa2020
$93MProject DefinitionActive
162
Interconnection of Member States' Broadband NetworksI.02.30.11
Regional project under PIDA PAP 2 (2021-2030) to provide and strengthen each ECCAS Member State with high bandwidth fiber optic connectivity and establish a sub-regional data hosting centre in the…
ICTAngola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and PrincipeCentral Africa, East Africa, Southern Africa, West Africa2020
$92MProject DefinitionActive
163
Infrastructure (Energy-Hydraulic) for broad groundwater mobilization and agricultural resilience in the context of shortages and impacts of climate change in the Northern Sahara Aquifer Basin (SASS)
The Northern Sahara Aquifer System (SASS) is a basin of more than 1000,000 km shared by three countries (Algeria, Tunisia, Libya) with considerable but not renewable water potential. This water…
WaterAlgeria, Libya, TunisiaNorth Africa
$91MFeasibilityActive
164
Limur / Nyimur multipurpose water resources projectBIP_NELSAP_016
The
Nyimur/Limur multipurpose water resources project is a transboundary project
located in the Aswa Basin covering parts of Lamwo District, Uganda and Magwi
Country, Eastern Equatorial State, South Sudan. The location coordinates are
3.560042°N,…
The Port of Beira is Mozambique’s principal maritime gateway for the central region and an important outlet for landlocked markets in Southern Africa. It is connected by road and rail…
Chirundu - Harare Road Link 4 (Chinhoyi to Harare)T.06.03.03.04
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km.…
TransportZimbabweSouthern Africapap1
$88MTenderingActive
167
Water Supply Project in Antanambao ManampotsyW.30.11
The project combines water-supply infrastructure with climate-resilient water-resource management in Antanambao Manampotsy, Atsinanana Region, Madagascar. The concept includes cascading lakes and retention structures, water treatment and distribution systems, protection of…
WaterMadagascarSouthern Africa2020
$88MPre-FeasibilityActive
168
Acquisition of six tugs (Durban)
Transport
$87MActive
169
Navigation on the Congo river and its tributaries the rivers Oubangui and SanghaT.18.04
The project aims to identify all the obstacles to navigate the Congo River, and the Oubangui and Sangha tributaries as well as the port infrastructure needs in order to improve the…
TransportCentral African Republic, Chad, Democratic Republic of Congo, Republic of CongoCentral Africapap1
$87MFeasibilityActive
170
N'djili Airport ExpansionT.22.03.03
This project is part of the expansions at 2020 gap airports Phase 1. It will see upgrades at the N'djili Airport (also known as the Kinshasa International Airport).
TransportDemocratic Republic of CongoCentral Africapap1
$86MActive
171
Kobero - Muyinga RoadT.08.03.03
The road is currently paved with bitumen and needs upgrading to asphalt concrete as well as carriageway expansion from 6 meter to 7 meters. The Kobero-Muyinga is on the RN6.…
TransportBurundiEast Africapap1
$84MProject StructuringActive
172
Harare - Beitbridge Road Link 3 (Masvingo to Turn Off)T.06.03.03.07
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of…
TransportZimbabweSouthern Africapap1
$83MTenderingActive
173
Chirundu - Harare Road Link 3 (Karoi to Chinhoyi)T.06.03.03.03
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km.The…
TransportZimbabweSouthern Africapap1
$82MTenderingActive
174
Mako - Dialocoto RoadT.13.03.01
The project involves the construction of 117 km section of single carriageway road between Mako and Dialocoto. This section is of the missing links on the Dakar-Bamako road.
TransportMali, SenegalWest Africapap1
$78MActive
175
Lusahunga-Rusumo RoadT.08.03.25
Rehabilitation of 91 km of single carriageway road between Lusahunga and Rusumo in Tanzania.
TransportTanzaniaEast Africapap1
$73MTenderingActive
176
Dinger-Bereha Irrigation and Drainage ProjectBIP_ENTRO_002
Dinger Bereha Irrigation and Drainage Project is located in Chewaka Woreda develop a 7,500 ha irrigation scheme at Dinger Bereha in Chewaka Woreda. The project will abstract water from the…
WaterEthiopiaNorth-Eastern Africa2024-01-NRBIP
$70MFeasibilityActive
177
Wad Meskin Irrigation ProjectBIP_ENTRO_023
Wad Meskin barrage across Rahad River has been planned to regulate the flood flows during rainy season, for Dinder and Rahad rivers so as to satisfy the needs of Rahad…
WaterSudanNorth-Eastern AfricaENTRO
$69MProject StructuringActive
178
Chirundu - Harare Road Link 2 (Makuti to Karoi)T.06.03.03.02
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km.…
TransportZimbabweSouthern Africapap1
$68MTenderingActive
179
Kampala-Jinja RoadT.05.03.20
Rehabilitation of 75 km of existing Kampala-Jinja road to widen and strengthen the carriageway. The road forms a critical section of the Northern Corridor, linking landlocked East African countries with the Port of…
TransportUgandaEast Africapap1
$68MTransaction Support & Financial CloseActive
180
Taba-Gakomeye Multipurpose Water Resources Development ProjectBIP_NELSAP_020
The Taba-Gakomeye Multipurpose Water Resources Development Project is a planned infrastructure project in the Nile Equatorial Lakes Region, specifically in Burundi. Its primary purpose is to develop a multi-purpose reservoir…
WaterRwandaEast Africa2024-01-NRBIP
$68MPre-FeasibilityActive
181
Angololo Multipurpose Water Resources Transboundary Project
Angololo Water Resources
Development Project (AWDP) is located on the transboundary Malaba River shared
by Kenya and Uganda and falls within the Sio-Malaba Malakisi (SMM) River Basin
of the Nile Basin. The project…
WaterKenya, UgandaEast Africa
$67MFeasibilityActive
182
Gwanda - Beitbridge Road
The proposed project road is one of the six (6) international trunk routes connecting Zimbabwe with the neighbouring countries of Botswana and South Africa Overall, it is intended that the proposed…
TransportBotswana, South Africa, Zambia, ZimbabweSouthern Africapap1
$67MTransaction Support & Financial CloseActive
183
The Ethiopia-Sudan Transmission Interconnection Project
The power system interconnection project involved the construction of a high voltage transmission line from Ethiopia to Sudan to utilise surplus hydropower from Ethiopia to replace oil-based thermal generation in…
EnergyEthiopia, SudanNorth-Eastern AfricaENTRO
$66MOperationActive
184
Chirundu - Harare Road Link 1 (Chirundu Border Post - Makuti - Hells Gate)T.06.03.03.01
The Chirundu - Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of…
TransportZimbabweSouthern Africapap1
$66MTenderingActive
185
Freetown-Monrovia-Abidjan Fibre-optic Link (Liberia section)I.02.18.02
The Government of Liberia"’s development goals for ICT and Telecommunications are to modernize networks and create added value through the effective utilization of ICTs that make use of different technology…
ICTCôte d'Ivoire, Liberia, Sierra LeoneWest Africapap1
$66MConstructionActive
186
Beira Port DredgingT.11.05
Dredging of the 40 km entrance channel to the port of Beira.
TransportMozambiqueSouthern Africapap1
$65MOperationCompleted
187
Karazi Multipurpose Water Resources Development ProjectBIP_NELSAP_013
WaterTanzaniaEast Africa2024-01-NRBIP
$63MFeasibilityActive
188
Algeria - Tunisia section of ELTAM Transmission Interconnector (Tunisia part)E.09.01.02
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Tunisia…
EnergyAlgeria, TunisiaNorth Africapap1
$61MOperationCompleted
189
Bachuma Gate – Maji ya Chumvi Road.T.05.03.07
Upgrading of 53 km of road to dual carriageway from Bachuma Gate to Maji ya Chumvi (Kenya).
TransportKenyaEast Africapap1
$61MConstructionActive
190
Tabora-Nyahua RoadT.08.03.19
Upgrading of 85 km of single carriageway road from Tabora to Nyahua in Tanzania.
TransportTanzaniaEast Africapap1
$58MOperationCompleted
191
Extension of National ICT Broadband Backbone (NICTBB) to DRC by construction of optical fibre cable across Lake Tanganyika and point of presences (PoPs) for providing connectivity with DRCI.02.30.10
The project involves the construction of a submarine optical fiber cable across Lake Tanganyika, connecting Kigoma in Tanzania to Kalemie in the Democratic Republic of the Congo (DRC). The cable…
ICTDemocratic Republic of Congo, Mozambique, TanzaniaCentral Africa, East Africa, Southern Africa2020
$56MPre-FeasibilityActive
192
Mombasa Port New Petroleum FacilityT.05.06.02
The project is designed to meet the need for additional liquid bulk capacity through design of a BOT project for a single buoy point or off shore jetty system.
TransportKenyaEast Africapap1
$56MOperationActive
193
Praia-Dakar Shipping and Maritime Services ProjectT.IW.26.01
The project is intended to establish a reliable maritime connection of more than 660 km between Praia and Dakar, with potential interfaces to other West African ports through the Praia-Dakar-Abidjan…
TransportCabo Verde, SenegalWest Africa2020
$56MProject StructuringActive
194
Fomi Multipurpose Dam Development ProjectW.30.10
The Fomi project is a multipurpose dam proposed on the Niandan River in Guinea within the Upper Niger Basin. The approved project concept includes a reservoir of about 4,978 million…
Sudan Section of the Fiber Optic Connectivity Component of the Port Sudan to Douala CorridorI.02.30.09
High-quality ducted fiber corridor linking Port Sudan undersea cable landings to inland Central African states, supporting broadband connectivity to Chad, Central African Republic, Ethiopia, and South Sudan. The corridor positions…
ICTCabo Verde, Central African Republic, Chad, Ethiopia, South Sudan, SudanCentral Africa, North-Eastern Africa, West Africa2020
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of…
Construct new 200W Marakele loop at between Thabazimbi & Matlabas (i.e. Km 27.400 - Km 30.700)
Construct new 200W Diepspruit loop at between Matlabas & Lephalale (i.e. Km 79.100…
RN18 is a 56km road on the Central Corridor along the RN7- RN18- RN16 route and is a conduit for movement of traffic from Tanzania to Gitega and Bujumbura. RN18…
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the 96km Kenyan section of the 2,800km ZTK interconnector, which runs from…
The Bugarama- Bujumbura road is about 35 km on the RN1, and forms part of the Central Corridor.
TransportBulawayo - Gwanda Road
South Africa, Zambia, ZimbabweSouthern Africapap1
The road runs in a south westernly direction from Bulawayo to the Beitbridge Border Post (between Botswana and South-Africa), covering a total of 320km. See this project on an interactive GIS map (with Google Earth satellite imagery and geo-referenced photographs) at www.tmsagis.co.za. The Bulawayo - Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 311).
TransportT.RD.26.09Rihaid El Birdi–Om Dafug Road
Central African Republic, SudanCentral Africa, North-Eastern AfricaIGAD
The project proposes construction of approximately 128.3 km of paved road from Rihaid El Birdi in Sudan to Om Dafug at the Central African Republic border. It would improve a remote cross-border connection and facilitate movement of people, goods and services.
The road is intended to reduce transport costs and isolation, improve regional trade and access and strengthen Sudan–Central African Republic connectivity.
The PAP II financial baseline is USD 102.64 million in CAPEX. The previously stored total of 200,000,000 was incompatible with the database’s USD-million convention and also differed materially from the approved baseline. Preparation and operation costs remain NULL.
The existing length value of 128 metres is corrected to 128,300 metres, equivalent to 128.3 km. Achieved length remains NULL because no completed works are verified. The project retains S2B as the last verified milestone; current conflict and limited owner reporting do not support a later stage.
EnergyBIP_NELSAP_021Ethiopia (Gambela) - South Sudan (Malakal) Power Transmission Line - Phase 1
Ethiopia, South SudanNorth-Eastern Africa2024-01-NRBIP
The Ethiopia (Gambela) - South Sudan (Malakal) Power Transmission Line - Phase 1 project is located in the transboundary corridor connecting the Gambela region in southwestern Ethiopia to Malakal in South Sudan. It involves constructing a 357 km, 220400 kV transmission line connecting the Gambela region in Ethiopia to Malakal in South Sudan.
This interconnection aims to facilitate the export of 100800 MW of electricity from Ethiopia to South Sudan initially, with plans to gradually increase power imports up to 4001000 MW, thereby addressing South Sudan's critical electricity demand while generating revenue for Ethiopia.
The project includes conducting feasibility studies, environmental and social impact assessments, and resettlement action plans, with construction expected to commence within two years following study completion. It is part of a broader regional effort to enhance electricity trade, grid integration, and energy security between the two countries, supported by a joint technical committee to oversee implementation and future expansions, including a planned 700-kilometer line from Ethiopia's Tepi distribution centre to Juba, South Sudan's capital.
TransportT.01.02.02TAH2: Algiers to Lagos - Missing Road Links in Niger
NigerWest Africapap1
WaterBIP_IGAD_001Horn of Africa Groundwater for Resilience Program II
KenyaEast AfricaIGAD
Why this Project is Needed Now?
The project is a timely intervention to strengthen the climate resilience of targeted communities in a region frequently affected by drought. By focusing on sustainable groundwater management, it aims to provide a buffer against climate shocks and improve livelihoods. The project builds on the achievements of earlier initiatives, such as the HoA-Groundwater Initiative (HoA GWI), to create a consolidated and sustainable institutional framework for managing transboundary aquifers. Phase II project will benefit from lessons learnt from the GW4R project Phase 1.
Anticipated Benefits:
The project's primary beneficiaries will be decision-makers and groundwater management professionals in regional and national institutions, who will benefit from strengthened capacity, better information, and improved policies. Indirectly, inhabitants of the IGAD region will benefit from more sustainable groundwater management and increased resilience to climate shocks. The investment is justified by its potential to promote peaceful coexistence over shared resources and enhance economic livelihoods.
Regional and Global Significance:
The project's focus on transboundary water management aligns with broader regional and global development agendas. By strengthening cooperative frameworks for a vital natural resource, it contributes to regional stability and sustainable development. The project also supports the achievement of SDGs (especially SDG 6), AU Agenda 2063, African Water Policy and Vision 2025, and IGAD and NBI goals.
Alignment with Nile Basin Investment Program:
The project should be included in the Nile River Basin Investment Program as it presents a novel approach for transboundary groundwater management that can strengthen livelihoods and climate resilience, offering a model that could be replicated and upscaled across the Nile Basin. Furthermore, it conducts pre-investment activities in key transboundary aquifers located within the Nile Basin, specifically the Sudd Aquifer (shared by Ethiopia and South Sudan) and the Gedaref Aquifer (shared by Ethiopia and Sudan), which are the focus of the current phase of the project.
EnergyBIP_NELSAP_004Kakono Hydropower Project
TanzaniaEast Africa2024-01-NRBIP
The Kakono hydropower site is located on the Kagera River, Northwest Tanzania near the border with Uganda.
As a key component of Tanzania's energy strategy, Kakono offers a strategic opportunity for expanding renewable energy, enhancing grid stability, and reducing dependency on fossil fuels. This run-of-river site, downstream among the potential locations on the Kagera River, aligns with national development goals.
The Project will entail the construction of a concrete-faced rockfill dam (42 m high and 1,380 m long) and a gravity roller-compacted concrete dam (61 m high and 284 m long) producing a hydropower potential exploited through a powerhouse at the toe of the dam.
The limited live reservoir storage volume of 90 Mm3 will allow the option of daily regulation of the river flow when necessary. The power plant will comprise two Kaplan turbines, each with a capacity of 43.9MW and a maximum combined discharge of is 3,16m3/s.
The project will also include a 38.5 km long 220 kV transmission line to the existing substation at Kyaka and will be managed by Tanzania Electric Supply Company Limited (TANESCO).
Preparations are well advanced and include a detailed Environmental and Social Impact Assessment (ESIA), completed in 2022.
WaterBIP_NELSAP_001Integrated Management of Transboundary Water Resources of Lakes Rweru, Cyohoha and the Akanyaru Marshlands (GIRET)
Burundi, RwandaEast Africa
The project area covers the Akanyaru marshland, the Lakes Cyohoha and Rweru and their watersheds shared by Rwanda and Burundi, and is located in the Akanyaru sub-basin and the downstream Nyabarongo sub-basin, both being part of the Kagera sub-basin shared by Rwanda, Burundi, Uganda and Tanzania. The project area has experienced a steady decline in the level of ecosystem services from being the food basket of Rwanda and Burundi in the 1960s with widespread forest area and plenty of rainfall to its current status of frequent drought, soil erosion and lack of grazing land.Â
The objective of this project is to enhance:
Co-ordination, sustainable development, management and utilization of the Lakes Cyohoha, Rweru, Akanyaru marshland environment, including water and fisheries resources production
Contribute to poverty reduction and the reversal of environmental degradation in the Bugesera region shared by Rwanda and Burundi, especially in the Rweru and Cyohoha lakes basins and Akanyaru marshland.
The project aims to develop 4,200ha irrigated land; 2.5 million agroforestry trees; 765ha riverbank & lake shores protected; restocking of 2 lakes; support to 9 fishermen cooperatives; 1 million beneficiaries including 4,500 fisher folks and improved capacity of more than 6,500 farmers.Â
In more detail:
Integrated Agriculture and Watershed Development and Management: Nearly 2,000 ha of irrigated land set up with hillside irrigation techniques and effective marshland management, more than 6,500 farmers with improved capacities on improved seeds, dairy cows and post-harvest infrastructures
Watershed management: Mechanisms and capacities for joint water monitoring and management in place and operational, Protection of 765 ha of lakeshores and Akanyaru riverbanks with fodder grass, agroforestry, fruit, bamboo and indigenous tree species. Conservation of aquatic ecosystems and biodiversity through restoration of lakes shores, spawning sites and catchments and joint mechanisms for fishery and water resources monitoring and management
Fisheries Resources Development and Management: Restock of the 2 lakes with 1,000,000 tilapia fingerlings, support construction of fishery infrastructures and strengthen capacities of 9 fishermen cooperatives and key stakeholders for sustainable fishery development. Regional Integration and peace building through harmonized policies frameworks
Capacity building and development: Capacity building for alternative livelihood and by commodity chain of 4,500 beneficiaries from fishery, farmers and agriculture cooperatives, 50% being women. Leading to poverty reduction and improved food security. This component also specifically addresses knowledge generation and dissemination systems to monitor specific risks and threats, notable climate change and variability.
The project is ready for implementation and requires funding of USD 95m over 4 years implementation to enable the project to become financially self-sufficient.
WaterW.30.15Support Programme for the Facilitation of Transport by Inland Waterways, Securing River Navigation and the Sustainable Management of Water Resources in the Congo Basin
Angola, Cabo Verde, Central African Republic, Chad, Democratic Republic of Congo, Gabon, Republic of CongoCentral Africa, Southern Africa, West Africa2020
The Congo Basin contains more than 25,000 km of naturally navigable waterways, including at least 15,000 km of classified routes. Managed through CICOS, the programme will improve the safety, reliability and management of inland waterway transport and strengthen integrated water-resource management. Activities include needs assessment and project definition, navigation and hydrometric information, harmonised rules and procedures, institutional capacity, planning for channel and terminal improvements, and data services for governments, operators, communities and research institutions.
TransportHarare - Nyamapanda Road Project
Malawi, Mozambique, South Africa, ZimbabweSouthern Africapap1
The road runs in a north-easterly direction from Harare to the Nyamanpanda Border Post (between Zimbabwe and Mozambique), covering a total distance of 278km. See this project on an interactive GIS map (with Google Earth satellite imagery and geo-referenced photographs) at www.tmsagis.co.za.
The Harare-Nyamapanda road is part of the Regional Trunk Road Network (RTRN Link NR 25) as well as the Trans-African Highway NR 9 and the rehabilitation of Marehwa-Nyamapanda is a section of this project, which covers a distance of 172km.
ICTI.02.30.04Development of Data Centre Infrastructures Underpinning the Digital Economy
Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and PrincipeCentral Africa, East Africa, Southern Africa, West Africa2020
The Development of Data Centre Infrastructures Underpinning the Digital Economy is a regional ICT programme under the Economic Community of Central African States (ECCAS). It envisions establishing six new data centres in Burundi, Central African Republic, Sao Tome and Principe, Chad, Equatorial Guinea, and Gabon, alongside the reinforcement of five existing centres in Angola, Republic of Congo, Cameroon, Rwanda, and the Democratic Republic of Congo. The programme is grounded in the Consensual Master Plan for the Development of Electronic Communications Infrastructure in Central Africa (PACDICE-AC), established in 2019, which identified data centre development as a regional priority. The project was formally included in the PIDA Priority Action Plan 2 (PIDA PAP2, 2021-2030) in 2020. Total programme investment is estimated at USD 92.5 million across all components. The programme aims to secure Central African cyberspace, build user confidence in digital services, and regionalise intra-ECCAS data exchange to reduce latency and improve access times. Key challenges include implementation complexity across 11 countries, technical coordination requirements, and funding mobilisation for pre-feasibility and feasibility studies.
Ce projet vise à doter l'espace sous-régional de la CEEAC des infrastructures qui participent de la sécurisation du cyberespace et contribuent à créer de la confiance dans un monde de plus en plus numérique et à garantir la souveraineté numérique des Etats.
ICTI.02.30.11Interconnection of Member States' Broadband Networks
Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, Sao Tome and PrincipeCentral Africa, East Africa, Southern Africa, West Africa2020
Regional project under PIDA PAP 2 (2021-2030) to provide and strengthen each ECCAS Member State with high bandwidth fiber optic connectivity and establish a sub-regional data hosting centre in the ECCAS space. The project covers all 11 ECCAS member states (Angola, Burundi, Cameroon, Central African Republic, Chad, Democratic Republic of Congo, Equatorial Guinea, Gabon, Republic of Congo, Rwanda, and Sao Tome and Principe) and aims to create a comprehensive broadband backbone network across Central Africa. The initiative builds on prior work undertaken by the World Bank, PPIAF, and the ITU to address connectivity gaps in the ECCAS sub-region and renew momentum for ECCAS and CEMAC harmonization efforts. Core objectives include securing regional cyberspace, building digital trust, ensuring data sovereignty, and enabling cross-border connectivity. The ECCAS region faces significant ICT access deficits, with only 10.2 internet access lines per 1,000 inhabitants compared to 61.8 for the continent as a whole.
Ce programme vise l'interconnexion des Etats membres de la CEEAC, deux à deux, à partir des dernières chambres des backbones nationaux vers les frontières
WaterInfrastructure (Energy-Hydraulic) for broad groundwater mobilization and agricultural resilience in the context of shortages and impacts of climate change in the Northern Sahara Aquifer Basin (SASS)
Algeria, Libya, TunisiaNorth Africa
The Northern Sahara Aquifer System (SASS) is a basin of more than 1000,000 km shared by three countries (Algeria, Tunisia, Libya) with considerable but not renewable water potential. This water potential is overexploited in view of the estimates of the levies, which rose from 0.6 billion m3/year in 1970 to 2.8 billion m3/year in 2013, almost triple the average recharge (1 billion m3/year).If the state of overexploitation persists, due to the increase in water needs that could double by 2030 due to the extension of irrigation, the consequences will be dramatic and may result, among other things, in a sharp deterioration in water and soil quality. As a result, alternative solutions must be sought through, among other things, the generalization of renewable energy (solar), the realization of renewable water points, drainage systems, water demineralization stations accompanied by efficient management of irrigation water.The project serves a planned infrastructure asset of another sector, but there is less than 50% overlap in the geography serviced by the proposed project and the other sector planned asset.Agricultural development through irrigation efficiency to triple irrigated areas by 2030; The development of solar energy, especially in arid areas; Job creation in the agricultural sector; Modernising irrigation through water-efficient practices; The use of unconventional water in irrigation through the demineralization of brackish water and the recovery of drainage water; The involvement of the private sectors and research in agricultural development; Incentives to invest in major agricultural projects; The development of cold storage capacity and packaging centres, particularly in arid areas; The attractiveness of the agricultural sector to young people. Innovation Drip System: - Use of Solar Energy; - applications of the "renewable energy-water-agriculture" nexus. - Rain systems outside the oasis, available in: - Private irrigated serriculture system and perimeter for the production of early or off-season market garden products with high added value. There, the problem is related to the degradation of the quality of the groundwater resource by salinization by contamination with marine water; The rain-fed olive system, threatened with drought with decline. In both cases, too, the application of a "renewable energy-water-agriculture" nexus is able to safeguard and redeploy them on the path to sustainability. The expected results of this reasoned intensification are as follows: - The conservation of water and soil resources and the preservation of their qualities; - Significant improvement in agronomic performance (saving 30% of irrigation water, recovery and reallocation of drainage water, at least doubling yields/ha relative to baseline, diversification of production and improvement in quality). This with a very positive integration of livestock into crop systems; - The increase (double or even triple) in the income of farmers to the benefit of the local economy; - The consolidation of the social structures and cultural values of these regions based on group solidarity, through new structures created and adopted by the indigenous peoples themselves. - Establishment of demineralization stations for brackish waters
WaterBIP_NELSAP_016Limur / Nyimur multipurpose water resources project
South Sudan, UgandaEast Africa, North-Eastern Africa2024-01-NRBIP
The
Nyimur/Limur multipurpose water resources project is a transboundary project
located in the Aswa Basin covering parts of Lamwo District, Uganda and Magwi
Country, Eastern Equatorial State, South Sudan. The location coordinates are
3.560042°N, 32.361010°E. The project comprises of several components, including
a community-based irrigation scheme, a dam and water reservoir, a water and
soil conservation component and flood control component. The core scheme of the
project consists of a 26 m head dam on the Nyimur River, a mini hydropower
plant with a 350 kW capacity; and development of 5,105 ha for paddy rice
irrigation. The project is expected to benefit 12,000 people from the two
countries.
The
preparatory studies (2015-2019) included feasibility studies for community-based
irrigation, hydropower generation, and watershed management; an Environmental
and Social Impact Assessment (ESIA); and preparation of a Resettlement Action
Plan (RAP). At the project end in 2019, a roundtable donors meeting was held to
mobilize resources for the implementation phase.
Project
preparation activities were funded through a EUR 1.975 million grant from the
AfDB, with EUR 0.587 million co-funding from NELSAP-CU and EUR 34,608 in
in-kind support from the countries.
The Port of Beira is Mozambique’s principal maritime gateway for the central region and an important outlet for landlocked markets in Southern Africa. It is connected by road and rail to Zimbabwe and Zambia, by the Sena corridor towards Tete and Malawi, and by pipeline to Zimbabwe. The original PIDA PAP II submission identifies the regional beneficiaries as Malawi, Zambia, Zimbabwe and parts of the Democratic Republic of Congo. The project responds to the need for additional cargo-handling capacity and more reliable port infrastructure along a corridor that carries containers, general cargo, fertilizer, agricultural commodities, minerals and petroleum products.
The approved Phase I package is broader than a single terminal expansion. It includes construction of a multipurpose terminal; expansion of the container terminal; construction of wharves 11A and 11B and paving of more than 20 hectares; construction of a fertilizer terminal and its supporting infrastructure; and rehabilitation and expansion of the fuel terminal. The submitted technical target is to increase annual handling capacity from 13.6 million tonnes to 24 million tonnes. The historical Phase I cost is USD 88.6 million. The submission also refers to a possible Phase II minerals terminal estimated at USD 509.1 million, but that amount is separate and must not be added to the Phase I project cost unless the database is formally re-scoped.
Current port information helps explain the operating base on which the PAP II project is being implemented, but it must not be confused with completed project outputs. The 2026/2027 operator directory records a 645-metre multipurpose container terminal with a design capacity of approximately 500,000 TEU per year, a 300,000 square metre container yard, four ship-to-shore cranes and associated yard equipment. It records a general cargo terminal with 670 metres of quay and a design capacity of 4.5 million tonnes per year, as well as an oil terminal with an annual capacity of 2.5 million tonnes. These are current port facilities and capacities; they are not, by themselves, evidence that the full PAP II investment package has been completed.
Physical implementation is clearest in the container and general-cargo components. The operator reported that the container terminal handled 469,664 TEU in 2025 and was adding two new ship-to-shore cranes to its equipment fleet. The stated development direction is to expand container handling towards 700,000 TEU per year. Earlier operator reporting also described expansion of general-cargo capacity from 3.5 million to 5 million tonnes per year and a dedicated fertilizer-handling facility with a conveyor from ship to warehouse and a dedicated mobile harbour crane. These activities relate directly to the approved container-terminal and fertilizer-terminal components and support a portfolio-level classification of S4B – Construction. They do not establish that wharves 11A and 11B, the multipurpose terminal and every supporting facility have all been completed.
The fuel-terminal component remains less advanced. In 2025, CFM issued an expression of interest for consultancy services to develop a multi-user floating fuel pier, technically described as a single buoy or single point mooring. The consultancy covers assessment of regional fuel demand and storage requirements; collection of technical, environmental, legal and financial information; risk assessment; selection of a public-private partnership model; preparation and evaluation of partner-procurement documents; contract negotiation; and later supervision of works. This evidence shows active project preparation and procurement for the fuel component, not completed construction or operation.
For database reporting, the project should therefore be treated as a mixed-maturity portfolio. S4B is justified because material components of the approved scope are under physical implementation, but the narrative must state that other components remain in preparation or have not been independently verified. The project must not be advanced to S4C until official evidence confirms commissioning and operation of the complete approved phase, or until the project is formally divided into separately reportable components. The USD 88.6 million value should continue to be described as the original Phase I baseline rather than a verified current cost estimate.
TransportT.06.03.03.04Chirundu - Harare Road Link 4 (Chinhoyi to Harare)
ZimbabweSouthern Africapap1
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km. The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. This section covers a distance of 101 km from Chinhoyi to Harare.
WaterW.30.11Water Supply Project in Antanambao Manampotsy
MadagascarSouthern Africa2020
The project combines water-supply infrastructure with climate-resilient water-resource management in Antanambao Manampotsy, Atsinanana Region, Madagascar. The concept includes cascading lakes and retention structures, water treatment and distribution systems, protection of community sources and improved monitoring. It is designed to serve approximately 71,910 residents and support public health, household water access, local livelihoods and agricultural production.
TransportAcquisition of six tugs (Durban)
TransportT.18.04Navigation on the Congo river and its tributaries the rivers Oubangui and Sangha
Central African Republic, Chad, Democratic Republic of Congo, Republic of CongoCentral Africapap1
The project aims to identify all the obstacles to navigate the Congo River, and the Oubangui and Sangha tributaries as well as the port infrastructure needs in order to improve the conditions and the capacity of safe river transport.
The Congo River is navigable for a distance of about 1700 km between Kinshasa and Kisangani. The Oubangui is navigable to Bangui from Liranga, which is 600 km from Brazzaville and the Sangha is navigable for a distance of roughly 710 km between Nola and the confluence with the Congo River.
The project proposes sustainable solutions for the rehabilitation, development and operation of the river transport network. At the end of the feasibility study phase, the following developments are proposed for navigation and ports:
Navigation: Improvement of the markup, the dredging of the main and secondary channel of the Congo River as well as the management of the difficult passes identified on Oubangui and Sangha.
Ports: Dredging in front of wharves, salvaging wrecks, rehabilitating quay walls and quays, acquiring and repairing port operating equipment, rehabilitating buildings, warehouses and roads as well as the layout of certain existing berthing areas, etc.
In addition, the project proposes skills development of the personnel of the institutions in charge of river transport of the three countries in the fields related to the code of inland navigation, the safety and security of navigation and port operations.
TransportT.22.03.03N'djili Airport Expansion
Democratic Republic of CongoCentral Africapap1
This project is part of the expansions at 2020 gap airports Phase 1. It will see upgrades at the N'djili Airport (also known as the Kinshasa International Airport).
TransportT.08.03.03Kobero - Muyinga Road
BurundiEast Africapap1
The road is currently paved with bitumen and needs upgrading to asphalt concrete as well as carriageway expansion from 6 meter to 7 meters. The Kobero-Muyinga is on the RN6. This road forms part of the shortest route to a trade port (Dar es Salaam), and carries 60% of international traffic with Burundi.
TransportT.06.03.03.07Harare - Beitbridge Road Link 3 (Masvingo to Turn Off)
ZimbabweSouthern Africapap1
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 25). This section covers 95 km from Masvingo to Turn Off.
TransportT.06.03.03.03Chirundu - Harare Road Link 3 (Karoi to Chinhoyi)
ZimbabweSouthern Africapap1
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km.The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. This section covers a distance of 94 km from Karoi to Chinhoyi.
TransportT.13.03.01Mako - Dialocoto Road
Mali, SenegalWest Africapap1
The project involves the construction of 117 km section of single carriageway road between Mako and Dialocoto. This section is of the missing links on the Dakar-Bamako road.
TransportT.08.03.25Lusahunga-Rusumo Road
TanzaniaEast Africapap1
Rehabilitation of 91 km of single carriageway road between Lusahunga and Rusumo in Tanzania.
WaterBIP_ENTRO_002Dinger-Bereha Irrigation and Drainage Project
EthiopiaNorth-Eastern Africa2024-01-NRBIP
Dinger Bereha Irrigation and Drainage Project is located in Chewaka Woreda develop a 7,500 ha irrigation scheme at Dinger Bereha in Chewaka Woreda. The project will abstract water from the Didessa River and comprises of a mass concrete weir headworks, a 15 km main canal, primary canals and tertiary distribution system of HDPE pipes.
The project feasibility studies were completed in 2010. with funding from the African Development Fund.
WaterBIP_ENTRO_023Wad Meskin Irrigation Project
SudanNorth-Eastern AfricaENTRO
Wad Meskin barrage across Rahad River has been planned to regulate the flood flows during rainy season, for Dinder and Rahad rivers so as to satisfy the needs of Rahad Project Phase I, through Abu Rakham barrage as a downstream regulator, and to divert water to Rahad Project Phase II for summer crops through a main canal. This same barrage would regulate water transported from the Roseires Dam, after the heightening project completion, with the link canal through Dinder River barrage to the project.
It lies between Hawata town and Wad Meskin on the eastern side of the seasonal Rahad river. The defunct railway line from Khartoum to Gadarif then Port Sudan crosses the Rahad river at Hawata which lies on the northern end of the project. The Wad Meskin Project site is close to the Rahad Project Phase II.The project area is located on the eastern bank of Rahad River and its land is shared between Gezira and Gadarif States.
The 53.8 km long open earth canal linking the two barrages at Salsal and Wad Meskin on Dinder and Rahad Rivers respectively. Its function is to convey part of Dinder waters to Rahad.
TransportT.06.03.03.02Chirundu - Harare Road Link 2 (Makuti to Karoi)
ZimbabweSouthern Africapap1
The Chirundu-Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km. The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. This section covers 78 km from Makuti to Karoi.
TransportT.05.03.20Kampala-Jinja Road
UgandaEast Africapap1
Rehabilitation of 75 km of existing Kampala-Jinja road to widen and strengthen the carriageway. The road forms a critical section of the Northern Corridor, linking landlocked East African countries with the Port of Mombasa.
WaterBIP_NELSAP_020Taba-Gakomeye Multipurpose Water Resources Development Project
RwandaEast Africa2024-01-NRBIP
The Taba-Gakomeye Multipurpose Water Resources Development Project is a planned infrastructure project in the Nile Equatorial Lakes Region, specifically in Burundi. Its primary purpose is to develop a multi-purpose reservoir on the Ruvyironza River to address water scarcity, enhance food security, and support socio-economic development. The project scope includes the construction of a dam and reservoir for irrigation, domestic water supply, livestock watering, and potentially hydropower generation. It is designed to regulate river flow, mitigate floods, and improve water availability for surrounding communities and agricultural activities. The project is part of the broader Nile Equatorial Lakes Subsidiary Action Program (NELSAP) under the Nile Basin Initiative.
WaterAngololo Multipurpose Water Resources Transboundary Project
Kenya, UgandaEast Africa
Angololo Water Resources
Development Project (AWDP) is located on the transboundary Malaba River shared
by Kenya and Uganda and falls within the Sio-Malaba Malakisi (SMM) River Basin
of the Nile Basin. The project consists of a proposed 30 m high dam with a
reservoir capacity of 43.0 MCM and hydropower generation capacity of 1.75 MW.
The dam will supply potable water to 20,000 people and irrigate 3,300 hectares
(1,180 ha in Kenya and 2,120 ha in Uganda). The project also includes
rehabilitation of the 430 km2 watershed upstream of the dam. In
total the Angololo Water Resources Development Project is expected to benefit
at least 127,300 people from Tororo, Manafwa, and Namisindwa districts in
Eastern Uganda and Busia and Bungoma Counties in Kenya through employment
creation, irrigated agriculture, piped water supply, hydropower generation, and
livestock and fisheries production.
The Angololo project was
identified by Kenya and Uganda in collaboration with NELSAP-CU under the Sio
Malaba Malakisi (SMM) River Basin Management (RBM) project. NELSAP-CU conducted
its prefeasibility studies in 2010 with grant financing from the Royal
Government of Sweden and the Royal Government of Norway. Feasibility studies
(including detailed designs, ESIA and RAP studies and stakeholder engagement)
commenced in 2019 with a US$ 1.5 million grant from NEPAD-IPPF and are expected
to reach completion in 2021.
The project is located at
coordinates 0.693243°N, 34.306400°E
TransportGwanda - Beitbridge Road
Botswana, South Africa, Zambia, ZimbabweSouthern Africapap1
The proposed project road is one of the six (6) international trunk routes connecting Zimbabwe with the neighbouring countries of Botswana and South Africa Overall, it is intended that the proposed intervention will reduce travel costs for road users as well as maintenance costs for the Government. A major objective is to help improve road safety conditions for international and regional traffic and for local residents
The project road starts from the Bulawayo Main Post Office and ends at the intersection* with the Masvingo road about 4 km north of the international border area. The approximate limits of the subject Project road are indicated in Map.
The power system interconnection project involved the construction of a high voltage transmission line from Ethiopia to Sudan to utilise surplus hydropower from Ethiopia to replace oil-based thermal generation in Sudan. The interconnection was also intended to allow for pooling of reserves in emergency situations, which would allow electricity to be transferred from Sudan to Ethiopia during times of severe hydrological conditions in Ethiopia. The interconnection will also achieve considerable savings in the operation of power plants in the long run.
The Ethiopia-Sudan Transmission Interconnection Project comprised of a new 194 km double circuit 230/220 KV transmission line linking Shehedi in Ethiopia to Gedaref in Sudan; reinforcement of Ethiopia’s existing 260 km single circuit line linking Bahir Dar to Gonder and Shehedi; and a new 36.5 km high voltage, double circuit, 230/220 kV, three phase alternating current transmission line linking Shehedi to Metema at the Ethiopia-Sudan border. The transmission capacity of the power lines is 100 MW.
The construction phase of the project was nationally funded and implemented between 2009 and 2013.
TransportT.06.03.03.01Chirundu - Harare Road Link 1 (Chirundu Border Post - Makuti - Hells Gate)
ZimbabweSouthern Africapap1
The Chirundu - Harare road runs in a south-easterly direction from Chirundu Border Post (between Zimbabwe and Zambia) to Harare, the capital city of Zimbabwe, covering a total distance of 348 km. The Chirundu-Harare road is part of the Regional Trunk Road Network (RTRN Link Nr 22) as well as the Trans-African Highway Nr 9. Llink 1 runs a distance of 75 km from Chirundu Border Post to Hells Gate.
ICTI.02.18.02Freetown-Monrovia-Abidjan Fibre-optic Link (Liberia section)
Côte d'Ivoire, Liberia, Sierra LeoneWest Africapap1
The Government of Liberia"’s development goals for ICT and Telecommunications are to modernize networks and create added value through the effective utilization of ICTs that make use of different technology solutions. Through this policy agenda and recognizing the essential social and economic potentials of broadband connectivity, the Government of Liberia including its development partners and local industry players facilitated Liberia"’s connection to the global community through the ACE Communication Network.
Liberia has since 2013 had access to broadband interconnection to the rest of the world via ACE. However, this connectivity does not extend outside the capital, Monrovia, since service providers transmission links does not have the necessary capacity required for broadband services.
The proposed development of a National ICT Backbone is a key initiative expected to provide the necessary connectivity infrastructure which will carry the volume of data traffic that is projected in the coming years and increase the diffusion of broadband access in order to reap the development benefits.
TransportT.11.05Beira Port Dredging
MozambiqueSouthern Africapap1
Dredging of the 40 km entrance channel to the port of Beira.
WaterBIP_NELSAP_013Karazi Multipurpose Water Resources Development Project
TanzaniaEast Africa2024-01-NRBIP
EnergyE.09.01.02Algeria - Tunisia section of ELTAM Transmission Interconnector (Tunisia part)
Algeria, TunisiaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Tunisia part of the 220 km / 400 kV Algeria to Tunisia section from the Algeria border to Jendouba in Tunisia.
TransportT.05.03.07Bachuma Gate – Maji ya Chumvi Road.
KenyaEast Africapap1
Upgrading of 53 km of road to dual carriageway from Bachuma Gate to Maji ya Chumvi (Kenya).
TransportT.08.03.19Tabora-Nyahua Road
TanzaniaEast Africapap1
Upgrading of 85 km of single carriageway road from Tabora to Nyahua in Tanzania.
ICTI.02.30.10Extension of National ICT Broadband Backbone (NICTBB) to DRC by construction of optical fibre cable across Lake Tanganyika and point of presences (PoPs) for providing connectivity with DRC
Democratic Republic of Congo, Mozambique, TanzaniaCentral Africa, East Africa, Southern Africa2020
The project involves the construction of a submarine optical fiber cable across Lake Tanganyika, connecting Kigoma in Tanzania to Kalemie in the Democratic Republic of the Congo (DRC). The cable is 186 km in length and will be deployed at lake depths reaching up to 1,470 meters. It will use G652D standard single-mode optical fiber with an initial capacity of 100 Gbps, expandable to several terabits per second using OTN over DWDM overlay technology. The primary component is the lake-bed cable, which will extend the existing Tanzania National ICT Broadband Backbone (NICTBB) into eastern DRC. The NICTBB, managed by Tanzania Telecommunications Corporation (TTCL) on behalf of the Government of Tanzania, already spans approximately 7,910 km and connects Tanzania to six neighboring countries: Zambia, Malawi, Kenya, Uganda, Rwanda, and Burundi. The project also includes establishing Points of Presence (PoPs) on both sides to facilitate interconnection and service delivery. The cable design incorporates specialized burial techniques and environmental safeguards to address seismic risks along the East African Rift. Joint environmental studies by TTCL and the Societe Congolaise des Postes et Telecommunications (SCPT) are being conducted to ensure compliance with the Ramsar Convention protecting Lake Tanganyika's biodiversity. This infrastructure is critical for digital integration within the East African Community (EAC) and the Economic Community of Central African States (ECCAS), providing a direct, high-capacity link that bypasses challenging overland routes. The project is recognized under the AUDA-NEPAD 2nd PIDA Priority Action Plan (2021-2030) as a key link for digital integration in East and Southern Africa.
The government of Tanzania constructed a National ICT Broadband Backbone (NICTBB) connecting all Regions in Tanzania and cross boarder connectivity to Zambia, Malawi, Kenya, Uganda, Rwanda and Burundi. The NICTBB has a total length of 7,910Km. The aim of NICTBB is to provide connectivity to all neighboring countries. Now the government is planning to connect with DRC by construction of optical fiber cable. The ideal of connection is between Kigoma in Tanzania and Kalemie in DRC, where the submarine optical fiber cable will be constructed. To achieve direct cross border link across lake Tanganyika, it will requires understanding of lake Tanganyika's bottom terrain and hydrology, landscape of beach sides, assessment of risks for marine activity and analysis of environmental factors for an in-depth design. The process will need to involve desk study, preliminary system design, route survey then detailed system design, which will determine the requirements for its implementation and operation. However, for generic understanding of requirements, we have identified possible locations of cable landing points along the shores of lake Tanganyika. The direct water distances between the two points is approximate to 150km with 1,470m considered as possible maximum depth of lake Tanganyika. Therefore considering that the cable will need to be layed down at the bottom of the lake, about 200km of submarine OFC could be needed for laying between the two points.
TransportT.05.06.02Mombasa Port New Petroleum Facility
KenyaEast Africapap1
The project is designed to meet the need for additional liquid bulk capacity through design of a BOT project for a single buoy point or off shore jetty system.
TransportT.IW.26.01Praia-Dakar Shipping and Maritime Services Project
Cabo Verde, SenegalWest Africa2020
The project is intended to establish a reliable maritime connection of more than 660 km between Praia and Dakar, with potential interfaces to other West African ports through the Praia-Dakar-Abidjan corridor. The service is intended to carry passengers and cargo and may use a combined container and RoPax operating model.
The project includes market and traffic analysis, vessel and port-infrastructure requirements, environmental and social analysis, financial modelling, management and governance arrangements, procurement design and a sustainable operating model. The April 2015 Cabo Verde-Senegal memorandum and the later ECOWAS corridor framework provide the institutional basis.
ECOWAS reported progress in completing financial and technical studies in 2024. In July 2025, stakeholders validated the financial and implementation strategy but also required ECOWAS to establish operational, infrastructure and technical preconditions, define management procedures, optimise cost estimates and prepare an appropriate procurement mechanism. A 2026 finance-specialist recruitment further confirms continuing structuring work. Announced expectations for operation by the end of 2026 are targets.
WaterW.30.10Fomi Multipurpose Dam Development Project
The Fomi project is a multipurpose dam proposed on the Niandan River in Guinea within the Upper Niger Basin. The approved project concept includes a reservoir of about 4,978 million cubic metres, a dam of approximately 50 metres, three generating units totalling around 90 MW, irrigated agriculture, fisheries, improved navigation and environmental-flow regulation. Guinea is the project member state, while benefits extend across the wider Niger Basin.
ICTI.02.30.09Sudan Section of the Fiber Optic Connectivity Component of the Port Sudan to Douala Corridor
Cabo Verde, Central African Republic, Chad, Ethiopia, South Sudan, SudanCentral Africa, North-Eastern Africa, West Africa2020
High-quality ducted fiber corridor linking Port Sudan undersea cable landings to inland Central African states, supporting broadband connectivity to Chad, Central African Republic, Ethiopia, and South Sudan. The corridor positions Sudan as a digital gateway for landlocked Sahel countries, reducing satellite reliance particularly for humanitarian actors. Technical design specifies high-quality ducted fiber at 130-170 cm depth with multi-mode capacity and distributed open access points. Project implementation has been severely constrained by ongoing conflict in Sudan since 2023, though humanitarian telecommunications infrastructure has been activated at Port Sudan landing sites.
The proposed project addresses enlargement of the regional ICT coverage by providing services for unconnected customers with satisfied and affordable quality and prices. Moreover crossing border cable will significantly contribute in injecting new communities and activities across its route as well as additive job opportunities.
ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of a 231 km / 330 kV transmission interconnector from Livingstone Substation (Zambia) to Zambezi Substation at Katima (Botswana), with a transmission capacity of 300 MW. Here it joins the Caprivi HVDC link.
TransportWaterberg upgrade Stage 2 - 3
Construct new 200W Marakele loop at between Thabazimbi & Matlabas (i.e. Km 27.400 - Km 30.700)
Construct new 200W Diepspruit loop at between Matlabas & Lephalale (i.e. Km 79.100 - Km 82.200)
Extend the existing Boshoek loop to accommodate 100W trains (i.e. between Km 132.82 - Km 135.78)
Construct a new 100W loop between Heystekrand and Kgetleng (i.e. between Km 159.55 - Km 160.95)
Two level crossings were identified in both Brits and Rustenburg for improvement or elimination.
Km 56.114 (Kruis Street, Brits) - Close level crossing
Km 57.018 (R511, Brits) - Upgrade level of protection to 6B
Km 111.328 ( Kerk Street, Rustenburg) - Close level crossing
Km 114.265 (Dr. Moroka Street, Rustenburg) - Upgrade level of protection to 6B
4 x Steel bridges have reached their fatigue life limit and therefore should be strengthened.
Crocodile River Bridge - at Km 58.300
Sterkstroom River Bridge - at Km 87.611
Hex River Bridge - at Km 108.060
Crocodile River Bridge - at Km 242.800
Construction of RESGEN’s Network Stabilisation Facilities (NSF) at Lephalale.
RN18 is a 56km road on the Central Corridor along the RN7- RN18- RN16 route and is a conduit for movement of traffic from Tanzania to Gitega and Bujumbura. RN18 requires upgrading from gravel to asphalt concrete and expansion of the carriageway from 6 metres to 7 metres.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the 96km Kenyan section of the 2,800km ZTK interconnector, which runs from Arusha in Tanzania to Isinya in Kenya. In Kenya, the line will be linked to the high-voltage direct current interconnector between Kenya and Ethiopia
TransportShip repair at the Existing repair quay
South AfricaSouthern Africa
Showing 50 of 647 published projects
(Page 4 of 13)
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment
Tone & Mood
Will generate for 15projects (top by investment value). Estimated time: ~2 min.