Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.
647 published projects6 presentation themesAtlas map modeVoice narration
1Filter projectsby sector, country, stage or programme
2Selectthe projects you want to present
3Create a showwith AID Intelligence and present full screen
50 of 647 published projects
#
Project
Investment · stage
551
Zobue/Mwanza OSBPT.09.01.03
Establishing the Zobue/ Mwanza OSBP which lies on the Tete/ Nacala Corridor, with Zobue on the Mozambican side and Mwanza on the Malawian side.
L'interconnexion électrique entre le Burundi et la Tanzanie fait partie de la liste restreinte des projets prioritaires du PAP 2 de l'UA-PIDA, le plan directeur de l'EAC, et relève du…
Construction of Petroleum Jetty and Associated Storage Facilities at Albion, MauritiusT.IW.26.03
The project concept is for a dedicated petroleum jetty and associated storage facilities at Albion, potentially supporting large-tanker berthing, petroleum imports, storage, bunkering and regional trading functions.
The project must be…
Doubling of RN06 Mascara-Bechar and RN50 Bechar-Algeria-Mauritania BorderT.RD.26.05
The project will increase capacity and safety through construction of second carriageways on the RN06 corridor between Mascara and Bechar and the RN50 corridor from Bechar towards the Algeria-Mauritania border.…
TransportAlgeria, Mali, Mauritania, SenegalNorth Africa, West Africa2020
L'interconnexion électrique entre le Burundi et la Tanzanie fait partie de la liste restreinte des projets prioritaires du PAP 2 de l'UA-PIDA, le plan directeur de l'EAC, et relève du programme d'interconnexions régionales NELSAP des Grands Lacs (PMIREL-PLEN). Chacun des réseaux des 2 pays est connecté ou en voie de l'être prochainement à ses voisins respectifs, mais ils ne sont pas encore directement connectés entre eux. Ce projet construira un de ces chaînons manquants.
Le projet comportera 2 composantes :
C.1 Construction de la ligne de transmission de 180 km ;
C.2 réinstallation/indemnisation des personnes affectées le long de l'infrastructure, ainsi que des études environnementales, des études de préfaisabilité et de faisabilité.
TransportT.IW.26.03Construction of Petroleum Jetty and Associated Storage Facilities at Albion, Mauritius
MauritiusSouthern Africa2020
The project concept is for a dedicated petroleum jetty and associated storage facilities at Albion, potentially supporting large-tanker berthing, petroleum imports, storage, bunkering and regional trading functions.
The project must be distinguished from the existing Mauritius Ports Authority oil jetty at Mer Rouge, Port Louis. Operating statistics, dimensions, throughput or investments relating to Port Louis cannot be applied to Albion unless an official scope decision confirms relocation or integration.
No current official decision, land confirmation, procurement, financial close or construction evidence was identified for Albion. The project remains active in the portfolio, but the current reportable stage is S1 pending owner confirmation of whether the proposal remains active, has been relocated or has been superseded.
TransportT.RD.26.05Doubling of RN06 Mascara-Bechar and RN50 Bechar-Algeria-Mauritania Border
Algeria, Mali, Mauritania, SenegalNorth Africa, West Africa2020
The project will increase capacity and safety through construction of second carriageways on the RN06 corridor between Mascara and Bechar and the RN50 corridor from Bechar towards the Algeria-Mauritania border. The approved scope totals approximately 2,200 km across the two principal sections.
The programme is intended to improve north-south and cross-border connectivity, support trade with Mauritania and West Africa, reduce travel times and accidents and improve access to southern Algerian regions and border facilities.
The original financial field indicates an average unit rate of DZD 300 million per kilometre. It does not provide a source USD total, valuation date or confirmed length to which the rate should be applied as a single contract package.
Official evidence shows phased implementation of the wider corridor, including the Algeria-Mauritania road initiative, while some RN06 packages remain in study or preparation. The portfolio stage is S4B because construction is occurring within the approved umbrella scope.
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment
Tone & Mood
Will generate for 15projects (top by investment value). Estimated time: ~2 min.