African Infrastructure Database
Connecting Africa through infrastructure

Project Showcase

Present Africa's infrastructure projects to ministers, partners and investors. Open to every visitor, member and organisation that needs to brief stakeholders, with cinematic slides, map-led Atlas views and AI progress briefings.

647 published projects6 presentation themesAtlas map modeVoice narration
  1. 1Filter projectsby sector, country, stage or programme
  2. 2Selectthe projects you want to present
  3. 3Create a showwith AID Intelligence and present full screen
50 of 647 published projects
#
Project
Investment · stage
451
MAYDON WHARF
Maydon Wharf is the largest Break Bulk and Dry Bulk precinct in the Port of Durban and in the TNPA ports system. Seven of the 15 berths were constructed 60…
Transport South Africa Southern Africa
Not reported Express interest →
452
Modernization of the RN01 (Trans-Saharan) between Ghardaia and Tamenrasset (Algeria Section)
National Road No. 01 stretches from Algiers to Mali and Niger over more than 2400 km. It has been twinned for approximately 500 km (between Algiers and Laghouat) and includes…
Transport Algeria, Chad, Libya, Mali, Nigeria, Tunisia Central Africa, North Africa, West Africa
Not reported Project Structuring Active Express interest →
453
Modjo Dry Port T.07.04.02
Transport Ethiopia North-Eastern Africa pap1
Not reported Operation Completed Express interest →
454
Molo-Eldoret Road T.05.03.05
Transport Kenya East Africa pap1
Not reported Operation Completed Express interest →
455
Mombasa-Nairobi Toll Road T.05.03.02
Transport Kenya East Africa pap1
Not reported Project Structuring Active Express interest →
456
Morocco IXP I.03.17
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
ICT Morocco North Africa pap1
Not reported Operation Active Express interest →
457
Mozambique - Zambia Transmission Interconnector (Zambia section) E.02.06.02
Construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje.
Energy Mozambique, Zambia Southern Africa pap1
Not reported Tendering Active Express interest →
458
Mozambique North-South Gas Pipeline
Energy Mozambique, South Africa Southern Africa
Not reported Active Express interest →
459
Mozambique-Malawi Transmission Interconnector (Malawi section) E.02.05.02
The project entails the construction of a 200 km, 400 kV(initially 220 kV) power line from Matambo substation, in Mozambique, to Phombeya, north of Blantyre. The first assignment will involve…
Energy Malawi, Mozambique Southern Africa pap1
Not reported Construction Active Express interest →
460
Mpanda - Kanazi Road T.08.03.11
Upgrading of 252 km of single carriageway from Mpanda to Kanazi (Tanzania).
Transport Tanzania East Africa pap1
Not reported Construction Active Express interest →
461
Musaid-Soloum OSBP T.24.02.05
Construction of Musaid-Soloum One-Stop Border Post between Libya and Egypt, which lies on the Trans- African Highway 1 Corridor.
Transport Egypt, Libya North Africa pap1
Not reported Active Express interest →
462
Nacala Port Container Terminal Expansion T.11.03
Expansion of Nacala Port container terminal (Mozambique) to accommodate 600 000 TEUs per annum.
Transport Mozambique Southern Africa pap1
Not reported Operation Active Express interest →
463
Nadapal OSBP T.05.02.05
A One-Stop Border Post (OSBP) facility at Nadapal border between South Sudan and Kenya on the Northern Corridor.
Transport Kenya, South Sudan East Africa, North-Eastern Africa IGAD
Not reported Project Structuring Active Express interest →
464
Namibia IXP I.03.23
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
ICT Namibia Southern Africa pap1
Not reported Operation Active Express interest →
465
NEW MULTI-PRODUCT PIPELINE
Develop a multi-product pipeline between Durban and Gauteng to expand pipeline capacity and replace the existing pipeline that has reached the end of its economic life. Initial capacity (phase 1)…
Transport South Africa Southern Africa
Not reported Express interest →
466
New Multi-Product Pipeline (NMPP) (Phase 1b)
Transport
Not reported Enabling Environment and Needs Assessment Active Express interest →
467
New railway link from Francistown to Kazangula and Livingstone
Transport Botswana, Zambia Southern Africa
Not reported Pre-Feasibility Active Express interest →
468
NGQURA TRANSHIPMENT HUB
This project entails the completion of the container terminal footprint to its full potential. The quay wall infrastructure is completed and provides for four container terminal berths but still requires…
Transport
Not reported Express interest →
469
Niamey-Algiers Fibre-optic Link (Algeria section) I.02.15.04
ICT Algeria, Chad, Niger Central Africa, North Africa, West Africa pap1
Not reported Operation Active Express interest →
470
Niamey-Algiers Fibre-optic Link (Niger section) I.02.15.03
ICT Algeria, Chad, Niger Central Africa, North Africa, West Africa pap1
Not reported Feasibility Active Express interest →
471
Niger IXP I.03.29
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
ICT Niger West Africa pap1
Not reported Construction Active Express interest →
472
Nigeria Regional Internet Exchange Point(RIXP ) I.03.39
The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers…
ICT Nigeria West Africa pap1
Not reported Operation Active Express interest →
473
North-South Corridor Rail Cooperative Master Plan T.06.04.01
Transport pap1
Not reported Project Definition Active Express interest →
474
North-West Sahara Aquifer System W.08.01
The NWAS is one of the major North African transboundary groundwater basins shared by three North African countries (i.e.  i.e. Algeria, Libya, and Tunisia) which covers an area of more than…
Water Algeria, Libya, Tunisia North Africa pap1
Not reported Project Structuring Active Express interest →
475
Noumbiel Multi-Purpose Dam W.06.01
The Noumbiel Multi-purpose Dam is a planned infrastructure project on the Black Volta River, located on the border between Burkina Faso and Ghana. The project aims to construct a dam…
Water Burkina Faso, Ghana West Africa pap1
Not reported Feasibility Active Express interest →
476
Ntem River Bridge T.21.02
The study of the Ntem River Bridge is part of the Kribi-Campo-Bata maritime route linking the port of Kribi to Cameroon and Bata in Equatorial Guinea. The inter-capital connections study…
Transport Cameroon, Equatorial Guinea, Gabon Central Africa pap1
Not reported Transaction Support & Financial Close Active Express interest →
477
Nubian Sandstone Aquifer System W.07.01
The Nubian Sandstone Aquifer System (NSAS) underlies the countries of Chad, Egypt, Libya and Sudan, the total population of which is over 136 million. It is the world’s largest ‘fossil’…
Water Chad, Egypt, Libya, Sudan Central Africa, North Africa, North-Eastern Africa IGAD
Not reported Tendering Active Express interest →
478
Nyamapanda/ Cuchimano OSBP T.09.01.02
Establishing the Nyamapanda/ Cuchimano One-Stop Border Post with Cuchimano on the Mozambique side and Nyamapanda on the Zimbabwean side.
Transport Mozambique, Zimbabwe Southern Africa pap1
Not reported Project Structuring Active Express interest →
479
Nyanza Lac-Mugina (RN3) Road T.08.03.02
Upgrading of the Bujumbura-Rumonge-Nyanza Lac-Mugina (RN3) road will improve trade, transport and tourism in the East African region. The road has 3 main sections: 1) Bujumbura-Rumonge (78 km): Studies of its…
Transport Burundi East Africa pap1
Not reported Operation Active Express interest →
480
Nyimur Multipurpose Water Resources Project Studies
The core scheme of the project consists of a 26 m head dam and reservoir on Nyimur River and five (5) modules of irrigated lowland rice of approximately 5,105 ha.…
Water South Sudan, Uganda East Africa, North-Eastern Africa IGAD
Not reported Feasibility Active Express interest →
481
Nzega-Tabora Road T.08.03.21
Transport Tanzania East Africa pap1
Not reported Transaction Support & Financial Close Active Express interest →
482
ORE LINE: SISHENTO SALDANHA (ON HOLD)
The iron ore line is the main export channel for iron ore from the mines in the Northern Cape to the Port of Saldanha. The current capacity of the ore…
Transport South Africa Southern Africa
Not reported Express interest →
483
Oujda Tlemcen OSBP T.24.02.02
Construction of Oujda Tlemcen One-Stop Border Post between Morocco and Algeria, which lies on the Trans-African Highway 1 Corridor.
Transport Algeria, Morocco North Africa pap1
Not reported Active Express interest →
484
Palambo Multi-purpose Dam W.01.01
The project aims to provide solutions to the problems of interruption of navigation on Oubangui River, tributary of the Congo River in the region of Central Africa. This is particularly the case during…
Water Central African Republic, Democratic Republic of Congo Central Africa pap1
Not reported Pre-Feasibility Active Express interest →
485
Pogo-Zegoua OSBP T.15.02.01
Construction of Pogo/Zegoua One-Stop Border Post between Cote d'Ivoire and Mali.
Transport Côte d'Ivoire, Mali West Africa pap1
Not reported Active Express interest →
486
Policy reforms for Central African Air Transport T.22.02
Transport pap1
Not reported Active Express interest →
487
Policy reforms for West African Air Transport T.17.02
Transport pap1
Not reported Tendering Active Express interest →
488
Port Bell Upgrading T.05.04.01
Transport Uganda East Africa pap1
Not reported Construction Active Express interest →
489
Port Jinja Upgrading T.05.04.07
Transport Uganda East Africa pap1
Not reported Project Definition Active Express interest →
490
PORT OF RICHARDS BAY
The Richards Bay Expansion Programme (RBEP) was resurrected in 2016 for the development of a Long Term Infrastructure Blueprint (LTIB). The LTIB will provide a roadmap of incremental expansion of…
Transport South Africa Southern Africa
Not reported Express interest →
491
Port Sudan - Dakar railroad
Transport Burkina Faso, Chad, Mali, Niger, Senegal, Sudan Central Africa, North-Eastern Africa, West Africa
Not reported Express interest →
492
PROJET REGIONAL DE LA BOUCLE FERROVIAIRE ABIDJAN-OUAGADOUGOU NIAMEY-COTONOU-LOME
boucle ferroviaire Abidjan-Ouagadougou-NiameyCotonou-Lomé» longue de 2 928 km, relie les cinq capitales des pays concernés : Abidjan (Côte d'Ivoire), Ouagadougou (Burkina Faso), Niamey (Niger), Cotonou (Bénin) et Lomé (Togo).…
Transport Benin, Burkina Faso, Côte d'Ivoire, Niger, Togo West Africa
Not reported Feasibility Active Express interest →
493
PYRAMID SOUTH INTERMODAL TERMINALS
Develop a new intermodal terminal at Pyramid(South) to handle automotive and container freight. The development of the intermodal terminal will address the current capacity constraints at the existing terminals (Pretcon,Rosconetc.)…
Transport South Africa Southern Africa
Not reported Express interest →
494
Rehabilitation and creation of cross-border centres in multi-service logistics zones, as part of the development of the Trans-Maghrebin Corridor
The Border Logistics Zones will play a very important role in the socio-economic and sustainable development of the AMU member countries, and are part of its strategy for the creation…
Transport Algeria, Libya, Mauritania, Morocco, Tunisia North Africa
Not reported Project Definition Active Express interest →
495
Rehabilitation and modernization of the existing Irrigation schemes (Ethiopia) Abbay/Blue Nile
There are more than 5.3 million ha of land currently under irrigation in the Eastern Nile, most with a poorThe project titled ‘Rehabilitation and modernization of the existing Irrigation schemes…
Water Ethiopia North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
496
Rehabilitation and modernization of the existing Irrigation schemes: Baro-Akobo-Sobat/White Nile
There are more than 5.3 million ha of land currently under irrigation in the Eastern Nile, most with a poorThe project identification was completed in 2015 with funding from the…
Water Egypt, Ethiopia, South Sudan, Sudan North Africa, North-Eastern Africa ENTRO
Not reported Pre-Feasibility Active Express interest →
497
Rehabilitation of Dar es Salaam Port Berths (1-7) (Tanzania)
Transport Tanzania East Africa
Not reported Active Express interest →
498
Rehabilitation, modernization and improvement of the services of the Trans-Maghreb railway line
The implementation of this project includes the following actions: The modernization of the line in Morocco (Fes- Oujda), The rehabilitation of the section between Morocco and Algeria (Cross-border Morocco-…
Transport Algeria, Morocco, Tunisia North Africa
Not reported Feasibility Active Express interest →
499
Rehabilitation, modernization, and improvement of services on the Trans-Maghreb railway line.
This Casablanca-Algiers-Tunis railway link covers a total of 2,350 km. Significant economic benefits derived from the project study include: Reduction in travel time for the entire population, and particularly for economic…
Transport Algeria, Morocco, Tunisia North Africa
Not reported Feasibility Active Express interest →
500
Renk (South Sudan/Sudan) OSBP T.05.02.06
Construction of the One-Stop Border Post between South Sudan and Sudan, which lies on the Northern Corridor.
Transport South Sudan, Sudan North-Eastern Africa IGAD
Not reported Project Definition Active Express interest →
Showing 50 of 647 published projects (Page 10 of 13)
0 projects selected
AID Showcase 1 / 50
aid.nepad.org

Intelligent AID — Create Showcase

Showcase ready! You have a previously generated AI showcase for these projects in this session.

Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.

Narrative Style

Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment

Tone & Mood

Will generate for 15 projects (top by investment value). Estimated time: ~2 min.
Preparing...