African Infrastructure Dashboard
Gain access to a range of statistics on infrastructure development on the Nile River Basin Investment Programme. Select Specific portal
The Eastern African Power Pool (EAPP) is a regional organization in Africa that aims to promote and facilitate cooperation among Eastern African countries in the field of electricity generation, transmission, and distribution. It is a power pool that allows member countries to share electricity resources and infrastructure, thereby improving access to reliable and affordable electricity in the region.
EAPP member countries include Burundi, Comoros, the Democratic Republic of the Congo, Djibouti, Egypt, Eritrea, Ethiopia, Kenya, Libya, Madagascar, Malawi, Rwanda, the Seychelles, South Sudan, Sudan, Tanzania, Uganda, and Zambia.
Sectors and Sub-Sectors of EAPP
Sector Name | Sub – Sector Name | Number of Projects | Stakeholder Name |
---|---|---|---|
Energy | Hydro Power Plant | 2 | Eastern Africa Power Pool |
Energy | Power Interconnector | 1 | Eastern Africa Power Pool |
Energy | Power Interconnector | 2 | Eastern Africa Power Pool |
Energy | Power Interconnector | 4 | Eastern Africa Power Pool |
Registered Projects by Eastern African Power Pool
Organisation Name | Project Code | Project Name | Sector | Sub-Sector | Status | Sector Group |
---|---|---|---|---|---|---|
Eastern Africa Power Pool | Masaka – Mwanza Transmission Line Project | Energy | Power Interconnector | Active | Not Applicable | |
Eastern Africa Power Pool | 06/12/2024 | Ruzizi III Hydropower Plant | Energy | Hydro Power Plant | Active | |
Eastern Africa Power Pool | Sudan (Rank -South Sudan (Malaka) 220kV high voltage power transmission interconnector | Energy | Power Interconnector | Active | ||
Eastern Africa Power Pool | Kenya (Lessos) -Uganda (Tororo) upgrade on Uganda side to 400kV | Energy | Power Interconnector | Active | Northern Multimodal Corridor | |
Eastern Africa Power Pool | Uganda (Olwiyo) – South Sudan (Juba) 400kV Inter-connector | Energy | Power Interconnector | Active | Northern Multimodal Corridor | |
Eastern Africa Power Pool | 06/12/2024 | Batoka Gorge Hydro Electric Power Scheme | Energy | Power Interconnector | Active | |
Eastern Africa Power Pool | 05/12/2024 | ZTK Transmission Interconnector (Zambia section) | Energy | Power Interconnector | Active | Nile River Basin |
Eastern Africa Power Pool | 05/12/2024 | Grand Ethiopian Renaissance Dam (GERD) | Energy | Hydro Power Plant | Active | |
Eastern Africa Power Pool | 05/12/2024 | ZTK Transmission Interconnector (Kenya section) | Energy | Power Interconnector | Active | Lobito-Benguela Corridor |
Eastern Africa Power Pool | 05/12/2024 | ZTK Transmission Interconnector (Tanzania section – Singida to Namanga) | Energy | Power Interconnector | Active | |
Organisation Name | Project Code | Project Name | Sector | Sub-Sector | Status | Sector Group |
EAPP Project Progress
ID | Project | Sector | Sub Sector | Country | Latest Stage | Reporting Year |
---|---|---|---|---|---|---|
1.042 | Ethiopia – Sudan Transmission Interconnector (Sudan section) | Energy | Power Interconnector | Sudan | S2B | 2.024 |
312 | GERD (Ethiopia)- Khartoum (Sudan)Transmission Line | Energy | Power Interconnector | Ethiopia | S3A | 2.024 |
427 | Grand Ethiopian Renaissance Dam (GERD) | Energy | Hydro Power Plant | Ethiopia | S4B | 2.022 |
2.236 | Kenya (Lessos) -Uganda (Tororo) upgrade on Uganda side to 400kV | Energy | Power Interconnector | Kenya | S4B | 2.024 |
2.440 | Masaka – Mwanza Transmission Line Project | Energy | Power Interconnector | Tanzania | S2B | 2.024 |
2.243 | Sudan (Rank -South Sudan (Malaka) 220kV high voltage power transmission interconnector | Energy | Power Interconnector | South Sudan | S2A | 2.024 |
2.233 | Uganda (Olwiyo) – South Sudan (Juba) 400kV Inter-connector | Energy | Power Interconnector | South Sudan | S2B | 2.024 |
2.233 | Uganda (Olwiyo) – South Sudan (Juba) 400kV Inter-connector | Energy | Power Interconnector | Uganda | S2B | 2.024 |
719 | ZTK Transmission Interconnector (Kenya section) | Energy | Power Interconnector | Kenya | S4C | 2.024 |
2.060 | ZTK Transmission Interconnector (Tanzania section – Iringa to Shinyanga) | Energy | Power Interconnector | Tanzania | S4B | 2.022 |
ID | Project | Sector | Sub Sector | Country | Latest Stage | Reporting Year |