The Abidjan-Ouagadougou-Niamey-Cotonou-Lomé Railway Loop is a proposed 2,928 km regional railway infrastructure project connecting five West African countries: Côte d'Ivoire, Burkina Faso, Niger, Benin and Togo. The railway corridor will…
Praia-Dakar-Abidjan Multimodal Transport CorridorT.RD.26.02
The programme is intended to establish an integrated economic and transport corridor from Praia in Cabo Verde to Dakar and onward to Abidjan through the coastal states of western Africa.…
Mombasa-Nairobi-Malaba-Kampala-Kigali Standard Gauge Railway with Malaba-Nimule-Juba SpurT.RL.26.03
The Northern Corridor Standard Gauge Railway is intended to create an interoperable regional railway from the Indian Ocean port of Mombasa to Uganda and Rwanda, with an additional link to…
TransportBurundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, UgandaCentral Africa, East Africa, North-Eastern Africa2020
The project concerns feasibility and future development of the Kinshasa-Ilebo railway link, often discussed together with the Kinshasa-Brazzaville road-rail bridge agenda. The strategic rationale is to overcome a long-standing bottleneck…
TransportDemocratic Republic of CongoCentral Africapap1
Abidjan-Lagos Corridor Highway Development ProjectT.RD.26.03
The project is being implemented in line with the decision of the Presidents of the five countries along the Abidjan-Lagos Corridor in February 2014, to construct a 6-Lane (2x3) dual-carriage…
The project proposes electricity interconnections from the Grand Inga hydropower station through a northern axis, southern axes using eastern and western corridors, and a western axis. The generation and transmission…
EnergyDemocratic Republic of Congo, South AfricaCentral Africa, Southern Africa2020
The LAPSSET Railway Project forms the railway component of the Lamu Port-South Sudan-Ethiopia Transport Corridor. Its approved purpose is to create a new regional rail connection from the Indian Ocean…
TransportEthiopia, Kenya, South Sudan, UgandaEast Africa, North-Eastern Africa2020
The Trans-Sahara Gas Pipeline is a proposed international gas pipeline corridor intended to move Nigerian gas northward through Niger to Algeria, where it would connect to existing Mediterranean export infrastructure.…
EnergyAlgeria, Niger, NigeriaNorth Africa, West Africapap1
Establishment of a Navigational Line between Lake Victoria and the Mediterranean Sea - Feasibility Study Phase 2 (VICMED)T.IW.26.04
The VICMED initiative proposes an integrated navigation and multimodal transport corridor from Lake Victoria to the Mediterranean Sea. It is intended to connect Nile Basin countries through river, lake and…
TransportBurundi, Democratic Republic of Congo, Egypt, Ethiopia, Kenya, Rwanda, South Sudan, Sudan, Tanzania, UgandaCentral Africa, East Africa, North Africa, North-Eastern Africa2020
The Libyan Alternative Freeway/Emsaad-Ras Ajdir motorway is intended to provide a modern high-capacity road along Libya s coastal transport spine. The road has strategic regional importance because it forms part…
TransportAlgeria, Egypt, Libya, Mauritania, Morocco, TunisiaNorth Africa
The project proposes an inland alternative freeway running east-west across Libya for approximately 1,750 km. It is intended to improve national and regional route redundancy, relieve pressure on coastal connections,…
Nairobi - Malaba Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.02
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
3,050 MW Mambilla Hydroelectric Power ProjectE.30.08
The project will develop a 3.05 GW hydroelectric complex near Kakara Village on the Mambilla Plateau in Taraba State. The approved PAP II concept includes four dams on the Donga…
Mtwara-Mbamba Bay Standard Gauge Railway with Spurs to Liganga and MchuchumaT.RL.26.01
The project will connect Mtwara Port with Mbamba Bay through southern Tanzania and provide branch lines to the Mchuchuma coal and Liganga iron-ore deposits. The PAP II concept covers approximately…
Mombasa - Nairobi Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.01
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
The Trans-Saharan Optic Fibre Broadband Project (also known as the Dorsale Transsaharienne a Fibre Optique, DTS) is a multinational terrestrial fiber optic backbone connecting six African countries: Algeria, Niger, Nigeria,…
ICTAlgeria, Chad, Mali, Mauritania, Niger, NigeriaCentral Africa, North Africa, West Africa2020
Kampala - Kasese Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.05
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
Kasese - Mirama Hills Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.06
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
Rehabilitation, Modernisation and Service Improvement of the Trans-Maghreb RailwayT.RL.26.05
The project is intended to restore and modernise a continuous railway corridor between Morocco, Algeria and Tunisia. The approved first-phase scope includes modernisation of the Fez-Oujda line, rehabilitation of the…
The project covers feasibility studies for the design, development, operation and maintenance of a high-voltage direct-current transmission scheme associated with the Inga 3 Low Head Project. The studies will cover…
EnergyBotswana, Democratic Republic of Congo, South Africa, Zambia, ZimbabweCentral Africa, Southern Africa2020
The Nacala Railway Corridor Project will transport approximately 18 million tons of coal, derived from the expansion of Moatize Mine (Mozambique) through a railway system connecting the existing mine in…
Construction of a Bridge over the Oubangui River and Development of the Bangui-Kisangani-Kampala and Kisangani-Bujumbura CorridorsT.BD.20.02
The Oubangui River crossing between Bangui and Zongo is a missing physical link between the Central African Republic and the Democratic Republic of Congo. The project is designed as more…
TransportBurundi, Central African Republic, Democratic Republic of Congo, UgandaCentral Africa, East Africa2020
Lesotho Highlands Water Project (LHWP) Phase IIW.04.01
The Lesotho Highlands Water Project (LHWP) Phase II is a multi-billion Maloti/Rand bi-national infrastructure project between the Governments of the Kingdom of Lesotho and the Republic of South Africa, established…
The project proposes a crude-oil pipeline from the South Sudan oil fields and the South Lokichar basin in Kenya to Lamu Port. Crude oil will be received at a tank…
EnergyKenya, South SudanEast Africa, North-Eastern Africa2020
Envisioned as one of the largest hydropower projects in the country, TAMS is designed to have an installed capacity ranging from 1,060 MW to 2,000 MW, with a projected annual…
A 2x3 Highway from Abidjan to Lagos through Accra, Lome and Cotonou covering a large proportion of West Africa"’s population and linking very vibrant seaports which serve all the landlocked…
The Lesotho-Botswana Water Transfer Project (LBWT) is a major transboundary water infrastructure initiative to transfer water from the water-rich highlands of Lesotho to the arid regions of Botswana, traversing South…
WaterBotswana, Lesotho, South AfricaSouthern Africa
The port expansion for Durban are driven by the major container expansions required to ensure that the port component of the Durban to Gauteng Freight Corridor can meet future demand.…
The project will construct a multipurpose dam on the Makhaleng River in Lesotho, associated hydropower facilities and a water-conveyance system of approximately 700 km through South Africa to Botswana. Current…
WaterBotswana, Lesotho, South AfricaSouthern Africa2020
Dar es Salaam - Isaka - Mwanza Standard Gauge Railway T.08.05.01
Tanzania is constructing the high speed electric standard gauge railway line from the port of Dar es Salaam to the inland Lake Victoria (at Mwanza) (1219 Km) with a target speed…
Malaba - Kampala Standard Gauge Railway (part of Mombasa - Kigali Railway Project)T.05.05.01.04
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port…
Egypt and Sudan Electrical Grid as the First Stage of the Continental Electrical InterconnectionE.30.14
The first stage will connect Egypt and Sudan along the Cairo-Cape Town road corridor through two high-voltage circuits. The PP2 concept considers 1,000 kV HVDC or a combination of 800…
Construction and upgrading of the approx. 2,000 km single carriageway road from Yaounde (Cameroon) to Brazzaville (Congo). In particular, this project involves the section in Cameroon, from Yaounde to the…
TransportCameroon, Republic of CongoCentral Africapap1
Development of the Chollet Hydroelectric Site and Associated Transmission LinesE.30.10
The PP2 project comprises development of a hydroelectric power station with an installed capacity of 600 MW and construction of associated transmission lines to supply localities in northern Republic of…
EnergyCameroon, Republic of CongoCentral Africa2020
Continental Africa Water Investment Support Programme (AIP)W.30.01
AIP provides an enabling and project-preparation framework for priority transboundary and regional water investments submitted by African member states. It supports integrated water, health, energy and food-security projects; strengthens institutional…
WaterBenin, Cameroon, Ghana, Kenya, Nigeria, Tunisia, Uganda, ZambiaCentral Africa, East Africa, North Africa, Southern Africa, West Africa2020
Development of the Booue and Tsengue-Leledi Hydroelectric Sites and Associated Transmission LinesE.30.09
At Booué, the project will develop an intake dam, headrace canal and a power station equipped with five Kaplan units with total installed capacity of 411 MW. At Tsengué-Lélédi, it…
Upgrading of the 1,602 km of single carriageway road from Libreville (Gabon) to Brazzaville (Congo). In particular, this project involves the section in Gabon, from Libreville to the border with…
TransportGabon, Republic of CongoCentral Africapap1
Expansion of the Maputo port, including the dredging of the port from its current 9,4 m draught to 11 m to accommodate the larger Panamax vessels, which will improve the…
The Ouesso-Bangui-Ndjamena road is a link in the Pointe Noire-Brazzaville / Kinshasa-Bangui-Ndjamena multimodal transport corridor. The road is also part of the network of the priority program of the consensual…
TransportCentral African Republic, Chad, Republic of CongoCentral Africapap1
The Nacala Railway Corridor Project will transport approximately 18 million tons of coal, derived from the expansion of Moatize Mine (Mozambique) through a railway system connecting the existing mine in…
The project will construct a hydropower dam and power station on the Cunene River at the Angola-Namibia border, downstream of the Epupa Falls. The station is planned with a capacity…
The Bedden Hydropower plant is a flagship initiative by the government of South Sudan. It is situated approximately 65km upstream from Juba. The scheme targets an installed capacity of around…
Dakar - Bamako Standard Gauge Railway (Senegal section)T.13.04.01
This project covers the Senegal portion of the Dakar-Ndjamena-Djibouti Road/ Railway project. This is a multimodal transboundary transport corridor including Senegal, Mali, Burkina-Faso, Niger, Nigeria, Cameroon, Chad, Sudan, Ethiopia and Djibouti. It is…
Dar es Salaam - Chalinze - Morogoro Road Capacity Upgrade
Rehabilitation and upgrading of the 197 km of road which would be the first toll road in Tanzania (First 100 km 6 lanes and then 4 lanes). The project requires…
The proposed Kaléta dam project entails the construction of a gravity dam, with a 240 MW capacity. The Kaléta site is located in Guinea, 115 km northeast of Conakry and…
The project will construct approximately 80 km of dual-carriage motorway between Bou Salem and the Tunisian-Algerian border. Together with the Oujda-Algerian-border link in Morocco, it will close the principal missing…
Lobito Port Expansion and Modernization ProjectT-PT-26-002
The Lobito Port Expansion and Modernization Project is a major infrastructure initiative to transform the Port of Lobito into a modern, high-capacity Atlantic gateway for the Lobito Corridor. The project…
TransportAngola, Democratic Republic of Congo, ZambiaCentral Africa, Southern Africapap1
The Geba 1 Dam includes a reservoir for regulation of flows which feed a 286MW hydropower plant 480m below, just upstream of the Geba 2 Dam. The Geba 2 Dam…
Construction of 287 MW Ruzizi IV Hydropower ProjectE.30.02
The power plant will be located on the Ruzizi River, which forms the common border between Rwanda and the Democratic Republic of Congo, approximately five kilometres west of Bugarama in…
EnergyBurundi, Democratic Republic of Congo, RwandaCentral Africa, East Africa2020
Development of Ports and Maritime Transport on Lake VictoriaBIP_LVBC_002
The project will deliver:
(i) Reduced transport costs for landlocked EAC states (Uganda, Rwanda, Burundi) and neighbouring countries like DRC, by shifting cargo from long road hauls to lake…
This project forms part of the West Africa North Core transmission interconnector which connects the power markets of Nigeria, Niger, Burkina Faso and Benin/Togo.
Eastern Africa Green Power Transmission Network Project 6 - Guba (Ethiopia)-Khartoum (Sudan)E.30.06
The project will develop a cross-border high-voltage alternating-current transmission line from Guba in Ethiopia to Khartoum in Sudan. It is one of the interconnections proposed under the Eastern Africa Green…
Louga Hydroelectric Power Plants 1 and 2 (246 MW)E.30.12
Louga 1 will include a reservoir, a 1,683 m dam, three bulb-type generating units with total capacity of 126 MW, a spillway and tailrace canal. Louga 2 will include a…
The project proposes a multipurpose dam on the Dawa River approximately 20 km upstream of Rhamu Dimtu in Kenya and near Boni in Ethiopia. Current PIDA specifications indicate an estimated…
The project forms part of the upgrading of the 1,200 km of narrow gauge railway between Abidjan and Ouagadougou. In particular it involves the section in Ivory Coast, from Abidjan…
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote…
The 225 kV Côte d'Ivoire - Liberia - Sierra Leone - Guinea Interconnection Project (CLSG) is a major regional power transmission infrastructure project. It involves the construction of approximately 1,303…
EnergyCôte d'Ivoire, Guinea, Liberia, Sierra LeoneWest Africapap1
The Democratic Republic of Congo and Zambia signed an intergovernmental memorandum of understanding on 9 July 2015 for the joint development of generation projects in the Luapula River Basin and…
EnergyDemocratic Republic of Congo, ZambiaCentral Africa, Southern Africa2020
Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data CentreI.02.30.05
The Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre is a multi-country ICT infrastructure project under the PIDA Priority Action Plan 2 (PAP 2) 2021-2030. The project…
ICTEthiopia, Kenya, Somalia, South Sudan, Tanzania, UgandaEast Africa, North-Eastern Africa2020
The project proposes a joint dam on the Lower Orange River near Noordoewer in Namibia and Vioolsdrift in South Africa. The feasibility process has examined alternative sites and sizes for…
Dar es Salaam New Berths Vijibweni, Mbwamaji and KunduchiT.08.04.03
This project includes development of 3 new berths on the eastern side of Dar es Salaam port, linked by a bridge south of the existing dockyard and fronting the new…
Modernisation of RN01 between Ghardaia and TamanrassetT.RD.26.08
The project covers modernisation of RN01 between Ghardaia and Tamanrasset, a central Algerian section of the Trans-Saharan Highway. The intended works include capacity, pavement, alignment, safety and service improvements needed…
TransportAlgeria, Chad, Libya, Mali, Niger, Nigeria, TunisiaCentral Africa, North Africa, West Africa2020
"Orange River System (ORS) is one of the most highly developed River Systems in Southern Africa. In September 2015, Namibia and South Africa, under the auspices of the PWC, commissioned…
WaterNamibia, South Africa, South SudanNorth-Eastern Africa, Southern Africa
This project concerns the Sudan section of a high-voltage Ethiopia-Sudan power interconnection designed to move power from Ethiopia into Sudan and strengthen the Eastern Africa Power Pool. The existing database…
Regional Rusumo Falls Hydroelectric Power Project IIE.13.01
Regional Rusumo Falls Hydroelectric Project (RRFHP) Development Objective is to increase the supply of electricity to the national grids of Rwanda, Tanzania and Burundi. It Comprises of construction of an…
The project includes the construction of a road and rail bridge between Brazzaville in Congo and Kinshasa in the DRC. The project also includes road and rail links in both…
TransportCameroon, Democratic Republic of Congo, Gabon, Republic of CongoCentral Africapap1
The Lobito Corridor Railway Rehabilitation Project involves the comprehensive rehabilitation and modernization of the 1,344 km Benguela Railway (CFB) from the deep-water port of Lobito in Angola to the border…
TransportAngola, Democratic Republic of Congo, ZambiaCentral Africa, Southern Africapap1
This project entails the upgrading of the Mombasa -Voi road to a dual carriageway. An alternative short term solution is to rehabilitate the road and provide climbing lanes along sections…
The proposed Sambangalou dam project entails the construction of a gravity dam, with a 128 MW capacity, and a 3.8 km3 reservoir. The dam is located in Senegal, 930 km…
Ntem River Bridge on the Kribi-Campo-Bata Transnational RoadT.BR.26.01
The Ntem River Bridge is intended to close a major missing link between Cameroon and Equatorial Guinea on the Kribi-Campo-Bata road corridor. It will support a continuous regional route connecting…
Ethiopia-Sudan Power System Interconnection Project (Assosa-New Raback, New Jabel Awelya)BIP_EAPP_001
The Ethiopia-Sudan Power System Interconnection Project (Grand Renaissance-New Rabak, New Jabel Awelya) connects power generated by Ethiopia's Grand Ethiopian Renaissance Dam (GERD), via Assosa, to new substations at Rabak and…
EnergyEthiopia, South Sudan, SudanNorth-Eastern AfricaEAPP
Construction of 365 km Juba-Torit-Kapoeta-Nadapal single cariageway road in South Sudan. The road links with the proposed South Sudan/Kenya OSBP project at Nadapal.
TransportKenya, South SudanEast Africa, North-Eastern AfricaIGAD
Le projet de route Ketta-Djoum consiste en sa deuxième phase au bitumage de la section Sembe (Congo)-Mintom (Cameroun). Les travaux concernent les tronçons Sembe-Souanké-Ntam(143km) au Congo et Mintom-Lele-Ntam(90km) au Cameroun,…
TransportCameroon, Republic of CongoCentral Africapap1
Development of the BAC and LOTEMO Hydroelectric Sites on the Lobaye River, and Related Works in CARE.30.17
BAC and LOTEMO have similar hydrological and topographical conditions in a narrow rocky valley of the Lobaye River. Each run-of-river site will use a concrete overflow dam with a powerhouse…
EnergyCentral African Republic, Chad, Democratic Republic of Congo, Republic of CongoCentral Africa2020
Integrated Watershed Management in Priority Catchments (Ribb, Gumera and Jema Watersheds)BIP_ENTRO_019
The Integrated Watershed Management in the Ribb, Gumera and Jema Watersheds project is one of the four fast track projects prepared in 2007 under the Eastern Nile Watershed Management (ENWM)…
Gogo Falls Water resources development (MPP)BIP_NELSAP_012
This Project is located in Western
Kenya. The dam is intended to provide flood controls,
irrigation development and hydropower generation. The project includes a 155
Mm3 dam, 20MW electricity, 30,000ha of irrigation,…
The project incorporates a combination of capital expenditure and operational optimisation initiatives to increase the capacity of the overall export coal system to 81mtpa. These projects include:
- Major upgrades to…
The approved project comprises a 98 km transmission line operating at 220 kV. It was identified as a least-cost transmission investment in the Tanzania Power System Master Plan and the…
Widening of the road from 6m to 7m with a paved shoulder to harmonise with EAC standard. The Muyinga-Gitega road is about 104 km on the RN12. This road forms…
La réalisation du projet se fera en deux phases suivant le financement actuel.Il comprend des travaux routiers, des mesures de facilitation de transport et d'autres activités connexes de développement. La…
TransportGabon, Republic of CongoCentral Africapap1
The project involves the extension of Chingola - Solwezi Railway to the border with Angola at Jimbe, to service new mines in the Copperbelt region. Angola has already commenced construction from…
TransportAngola, Democratic Republic of Congo, ZambiaCentral Africa, Southern Africapap1
Egypt and Libya Regional Electrical Interconnection as the First Stage of Completion of the Regional Electrical Interconnection of the North African RegionE.30.13
The project comprises an alternating-current transmission line of about 165 km between Saloum and Tobruk. It will connect the Egyptian 500 kV system with the Libyan 400 kV system through…
The Project aims to develop inland water transport infrastructure and services along the Akagera River to improve regional connectivity between Rwanda, Tanzania, and Uganda. The project involves river navigation improvements,…
The project is intended to create an inland-water transport connection from Lake Victoria through the Kagera/Akagera River to Kagitumba in eastern Rwanda. Its approximately 260 km scope may require river…
The project involves the construction of the Koukoutamba multi-purpose dam (previously known as Gourbassy dam) between Mali and Senegal.
A feasibility study and preliminary design for the Gourbassy Dam was completed by…
Strategically located half-way down the coast of Namibia, with direct access to principal shipping routes, Walvis Bay is a natural gateway for international trade. Walvis Bay is Namibia's largest commercial…
El Fasher-Kabkabiya-El Geneina-Adri RoadT.RD.26.06
The project is intended to provide a paved regional road from El Fasher through Kabkabiya and El Geneina to Adri at the Chad border. It covers about 328 km of…
The Jita sub-basin measures 2,915 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin partially covers five Woredas…
Egypt - Libya section of ELTAM Transmission Interconnector (Egypt part)E.09.03.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Egypt…
WAPP Regional Solar Power Park Project in MaliE.30.18
The project is part of the ECOWAS Master Plan's renewable-energy subprogramme for an integrated and efficient West African electricity system. It will develop a scalable, multiphase and multi-site solar power…
ZTK Transmission Interconnector (Tanzania section - Iringa to Shinyanga)E.02.03.01
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga…
ZTK Transmission Interconnector (Tanzania section - Singida to Namanga) E.02.03.01
Construction of a transmission linethat connects the power networks ofTanzania and Kenya. This projectincludes the section of 414km of400kV transmission line from Singidato Namanga via Arusha. The designcapacity is 2,000MW.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project initially included the section of 400kV, 1134km bidirectional Tanzanian section of the 2,800km ZTK…
The project will construct a set of 330 kV transmission links across Zimbabwe, Zambia, Botswana and Namibia. The principal sections are the Hwange-Livingstone/Mukuni connection between Zimbabwe and Zambia, the Victoria…
The Anger Irrigation Project is a major multi-purpose water resources development project in Ethiopia, located on the Anger River, a tributary of the Didessa River in the Blue Nile Basin.…
The project involves the modernisation of the Dar es Salaam Port, including upgrade to berths 1 to 7, deepening of the harbour, improveing cargo handling and port layout.
Borenga Dam and Mara Valley Multipurpose Water Resources Development ProjectBIP_NELSAP_011
The
Mara River Basin Project contributes to improved living conditions of the basin
communities by creating an enabling environment for sustainable
development-oriented investments and building capacity of riparian staff and
communities in integrated water…
Serenje - Nakonde Road Link 1 (Serenje - Mpika)T.06.03.01.01
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
TransportBotswana, Malawi, Namibia, Republic of Congo, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The project involves the construction of a new coal terminal at Beira port. A 50 ha site has been set aside for this purpsoe. The terminal is intended to process…
Ruvyironza Multipurpose Water Resources Development ProjectBIP_NELSAP_017
The Ruvyironza Multipurpose Water Resources Development Project (PIDA Code: BIP_NELSAP_017) is a major infrastructure initiative in Burundi. The project's core component is the construction of a multipurpose dam on the…
The project is part of the Inga-Cabinda-Pointe Noire transmission interconnector, linking the power systems of DRC, Angola and Congo, with a transfer capacity of 600 MW. The project involves the…
EnergyAngola, Democratic Republic of CongoCentral Africa, Southern Africapap1
Kabuyanda Multipurpose Water Resources Development Project
The Kabuyanda Water Resources Development Project,
renamed Kabuyanda Irrigation Scheme, is located in Isingiro and Ntungamo
Districts in south-western Uganda. The project area is characterized by
fluctuating rainfall and with up to four…
Multinational Lakes Edward and Albert Integrated Basin Management and Investment Project (LEAF III)BIP_NELSAP_003
The Lakes Edward and Albert Basin supports over 14 million people who depend on fisheries, agriculture, transport, and diverse ecosystem services. The basin faces severe pressures from population pressures, poverty,…
WaterDemocratic Republic of Congo, UgandaCentral Africa, East Africa2024-01-NRBIP
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The proposed 330 kV line is approximately 300…
The Kayanza- Bugarama road is about 59 km on the RN1. It originates from Bugarama and terminates in Kayanza City. This road forms part of the trade route with Rwanda.
Nyahua-Chaya, Urambo-Kaliua, Kazirambwa-Chagu and Malagarasi-Uvinza RoadsT.08.03.16
The project involves upgrading of missing links along part of the Central Corridor of Manyoni-Itigi-Tabora-Urambo-Kaliua-Kigoma: Nyahua to Chaya (90km), Urambo to Kaliua (33km), Kazirambwa to Chagu (40km) and Malagarasi to…
The Noumbiel project is a transboundary multipurpose dam proposed on the Mouhoun, close to the confluence with the Koulbi and the Burkina Faso-Ghana border. The approved PAP II submission describes…
Serenje - Nakonde Road Link 3 (Chinsali - Nakonde)T.06.03.01.03
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
TransportBotswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Uganda (Nkenda) - DR Congo (Beni-Butembo-Bunia-Mabuki) Power Transmission Inter-Connection Project is a strategic regional infrastructure initiative aimed at constructing a 400 kV double-circuit high voltage transmission line spanning 352.2…
EnergyDemocratic Republic of Congo, UgandaCentral Africa, East Africa2024-01-NRBIP
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km ZTK interconnector from…
Algeria - Tunisia section of ELTAM Transmission Interconnector (Algeria part)E.09.01.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Algeria…
Harare - Beitbridge Road Link 4 (Turn Off to Beitbridge Border Post)T.06.03.03.08
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of…
Integration of Electrical Networks between Inga-Cabinda and Pointe NoireE.30.07
The project consists of completing the environmental and social impact assessment, updating the tender documents and carrying out the transmission works required to connect Inga, Cabinda and Pointe-Noire. The infrastructure…
EnergyAngola, Democratic Republic of Congo, Republic of CongoCentral Africa, Southern Africa2020
Nsongezi Hydroelectric Power StationBIP_NELSAP_007
The Nsongezi Hydropower Project is a proposed run-of-river scheme on the Kagera River, located along the border between Uganda and Tanzania. The project is also regionally relevant, with potential power…
The Sena line runs from Limbe (going through Chiromo where the railway line crosses the Shire River, where the culvert has been washed away and Nsanje) to Marka, the border…
Libya - Tunisia section of ELTAM Transmission Interconnector (Libya part)E.09.02.01
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Libya…
Renk - Malakal Power Transmission LineBIP_NELSAP_022
The South Sudan (Renk) - South Sudan (Malakal) 220 kV High Voltage Power Transmission Interconnector project is located in the Upper Nile region, connecting the town of Renk in South…
Serenje - Nakonde Road Link 2 (Mpika - Chinsali)T.06.03.01.02
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province…
TransportBotswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
Fes-Oujda Motorway Link to the Algerian East-West MotorwayT.RD.26.01
The project will construct an approximately 24 km dual-carriage motorway from the terminal part of the Fes-Oujda motorway to the Moroccan-Algerian border, where it is intended to connect with Algeria's…
Angololo Multipurpose Water Resources Development ProjectW.30.02
The project will construct a dam of about 30 metres on the Malaba River at the Kenya-Uganda border, creating a reservoir of roughly 31 million cubic metres. The scheme is…
Angololo Multipurpose Water Resources Development Project (Angololo Dam) NELSAPBIP_NELSAP_018
The Angololo Water Resources Development Project (AWDP) is located on the trans-boundary Malaba River that is between Kenya and Uganda and it falls within the Sio-Malaba Malakisi (SMM) River Basin…
Harare - Beitbridge Road Link 2 (Chivhu to Masvingo)T.06.03.03.06
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km.The Harare-Beitbridge road is part of the…
The Fincha'a sub-basin measures 4,089 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin is located in Horo…
ZTK Transmission Interconnector (Tanzania section -Mbeya to Tunduma) E.02.03.01
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 400kV, 292km Iringa - Kisada - Mbeya transmission line,Â…
Harare - Beitbridge Road Link 1 (Harare to Chivhu)T.06.03.03.05
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of…
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The project involves the construction of approximately 350…
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project…
The Chemoga-Yeda sub-basin measures 2,738 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin is located in Amhara…
Construction of Amilcar Cabral Submarine Cable SystemI.02.30.02
The Amilcar Cabral Submarine Cable System (ACSCS) is a 3,555 km submarine fibre optic cable project connecting Cabo Verde, The Gambia, Guinea, Guinea-Bissau, Liberia, and Sierra Leone. The system comprises…
ICTAlgeria, Cabo Verde, Gambia, Guinea, Guinea-Bissau, Liberia, Sierra LeoneNorth Africa, West Africa2020
The project involves the construction of the Kousséré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
Lake Victoria Water and Sanitation Initiative Phase II (LVWATSAN II)
This project involved construction
of water supply and sanitation systems, improving solid waste and storm water
management, improving watershed management, improving urban planning and
building capacity of urban authorities in 15 secondary towns…
WaterBurundi, Kenya, Rwanda, Tanzania, UgandaEast Africa
Kinyeti River Multi-purpose Water Resources Development ProjectBIP_ENTRO_009
Kinyeti River has its origins in the Imatong Mountains close to the South Sudan-Uganda border and from there flows northwards, eventually dispersing into the Badigeru swamp. The proposed project has…
The Abidjan-Ouagadougou-Niamey-Cotonou-Lomé Railway Loop is a proposed 2,928 km regional railway infrastructure project connecting five West African countries: Côte d'Ivoire, Burkina Faso, Niger, Benin and Togo. The railway corridor will link the major cities of Abidjan, Ouagadougou, Niamey, Cotonou and Lomé, strengthening regional connectivity and providing improved access to major seaports for landlocked countries. The proposed route comprises four principal sections: Abidjan-Ouagadougou (1,157 km), Ouagadougou-Niamey (502 km), Niamey-Cotonou (1,101 km) and Cotonou-Lomé (168 km).
The project responds to persistent challenges affecting regional transport systems, including deteriorating infrastructure, inadequate transport services, physical and non-physical trade barriers, differences in national regulations, lengthy transit times and high logistics costs. According to the original project rationale, these inefficiencies can increase the cost of goods by approximately 40%, undermining trade competitiveness and regional economic integration. Burkina Faso and Niger, as landlocked countries, depend heavily on maritime gateways such as the ports of Abidjan, Cotonou, Lomé and Tema in Ghana for international trade. Improved railway connectivity is therefore expected to provide a more efficient and competitive alternative for moving goods and passengers across the subregion.
The overall objective is to improve the quality, efficiency, reliability and competitiveness of railway transport across the five participating countries while supporting regional economic integration, trade facilitation and sustainable development. The project envisages the modernisation, development and interconnection of railway infrastructure through a phased implementation approach, with standard-gauge railway infrastructure and diesel traction identified in the preliminary technical specifications.
The railway loop is expected to facilitate the movement of agricultural products, minerals, industrial goods and passengers, strengthening access to domestic, regional and international markets. By improving connections between production centres, inland markets and maritime ports, the project aims to stimulate agricultural and industrial development, support mineral resource exploitation, reduce transport costs and strengthen regional value chains. It is also expected to enhance transport safety, provide an alternative to road freight transport, reduce pressure on regional road infrastructure and potentially lower transport-related environmental impacts where freight shifts from road to rail.
The project has an indicative capital investment requirement of US$53.96 billion, with approximately US$6.9 million identified for technical studies and project preparation. Implementation is planned in phases, allowing individual corridor sections to be developed according to technical readiness, financing availability and regional priorities. The original project documentation identifies a potential regional market of approximately 200 million people, although the geographic coverage and methodology underlying this estimate require confirmation.
The project is also expected to generate socioeconomic benefits through improved mobility, trade opportunities, employment and access to markets. Particular benefits are anticipated for women engaged in agricultural production, cross-border trading and commercial activities along the corridor. These opportunities could be strengthened through targeted measures supporting women's participation in procurement, employment, entrepreneurship and railway-related services.
Ultimately, the railway loop seeks to establish a more integrated, reliable and efficient regional transport network linking coastal and landlocked economies. By improving access to ports, facilitating regional trade, connecting productive sectors and strengthening economic cooperation among participating countries, the project aims to contribute to sustainable economic growth, regional integration and poverty reduction in West Africa.
The programme is intended to establish an integrated economic and transport corridor from Praia in Cabo Verde to Dakar and onward to Abidjan through the coastal states of western Africa. The road component follows the Dakar-Banjul-Bissau-Conakry-Freetown-Monrovia-Abidjan route, while a maritime service is intended to connect Praia with Dakar and neighbouring mainland ports.
The current ECOWAS alignment work identifies approximately 3,164 km for the highway component and about 600 km for the maritime connection. The project is broader than a highway: the founding corridor treaty allows for rail, maritime and air transport, fibre-optic infrastructure, pipelines and economic-development interventions.
The location countries are Cabo Verde, Senegal, The Gambia, Guinea-Bissau, Guinea, Sierra Leone, Liberia and Côte d'Ivoire. Burkina Faso, Ghana, Mali, Niger and Nigeria benefit through links with inland and adjoining regional corridors. ECOWAS and the future corridor authority are responsible for regional coordination.
The PAP II submission estimated USD 21 billion in CAPEX and USD 70 million for technical studies and preparation. AfDB and NEPAD-IPPF support financed initial studies, including identification of the optimal route and socio-economic and financial work on the maritime link.
ECOWAS reported in September 2025 that the preliminary studies for the two initial components had been completed. The ministerial steering committee approved the programme for the next stages, including additional studies, treaty ratification, institutional arrangements and financing. These milestones support S2B but do not establish completion of detailed design for all components, financial close, tendering or corridor-wide construction.
Individual works located along the route, including national roads or specific bridges, should not automatically advance the whole umbrella programme.
TransportT.RL.26.03Mombasa-Nairobi-Malaba-Kampala-Kigali Standard Gauge Railway with Malaba-Nimule-Juba Spur
Burundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan, UgandaCentral Africa, East Africa, North-Eastern Africa2020
The Northern Corridor Standard Gauge Railway is intended to create an interoperable regional railway from the Indian Ocean port of Mombasa to Uganda and Rwanda, with an additional link to South Sudan. The approved route begins with the approximately 480 km Mombasa-Nairobi section, continues approximately 120 km to Naivasha and then extends westward through Kenya to Malaba. In Uganda, the principal eastern section links Malaba with Kampala, with further planned connections towards Rwanda and a northern branch through Gulu and Nimule to Juba.
The railway is designed for high-speed passenger operations of up to 160 km/h and high-capacity freight services. Its strategic function is to complement the heavily used Northern Corridor road network, reduce transport costs and transit times, improve port-hinterland connectivity and support regional trade and industrial development.
The programme must be reported as a regional umbrella rather than as a single homogeneous construction contract. Kenya has completed and operates the Mombasa-Nairobi and Nairobi-Naivasha sections. Uganda has undertaken design, land acquisition, stakeholder engagement and contractor procurement for the Malaba-Kampala section. Rwanda and South Sudan remain dependent on completion and sequencing of the upstream sections and on regional financing and implementation agreements.
Uganda's official transport reporting records engagement of Yapi Merkezi for the eastern route and subsequent pre-construction and right-of-way work. Official FY2025/26 and FY2026/27 budget documents contain construction targets for the Malaba-Kampala section, but targets are not the same as verified completed works. The project is therefore coded at S4A for the latest period because an implementation contract and preparatory activities exist, while full physical construction of the regional programme and regional commissioning have not been demonstrated.
The USD 19.2 billion value remains the approved PAP II regional baseline. Segment costs, national budget allocations and financing arrangements should not be substituted for that full-scope estimate unless an approved consolidated regional cost update becomes available.
The project concerns feasibility and future development of the Kinshasa-Ilebo railway link, often discussed together with the Kinshasa-Brazzaville road-rail bridge agenda. The strategic rationale is to overcome a long-standing bottleneck in the DRC transport system by connecting Kinshasa more effectively to the interior and to regional rail corridors.Historically, DRC s transport network has depended heavily on a combination of river, road and ageing rail assets. AfDB-backed studies considered the feasibility of extending rail connectivity and improving intermodal movement between Kinshasa, Ilebo and neighbouring corridors. This is particularly important for freight movements between the Atlantic gateway, the Congo River basin and mining/agricultural hinterlands.Validation note: external AfDB sources validate the feasibility-study scope and the approximate 1,015 km survey/study distance, but they do not validate the current construction capex_cost of 16,939 USD million. The cost should remain provisional.Sources reviewed: AfDB MapAfrica, Feasibility Study of the Extension of the Kinshasa-Ilebo Railway, https://mapafrica.afdb.org/en/projects/46002-P-Z1-DC0-014; AfDB, Study on the Road-Rail Bridge between Kinshasa and Brazzaville and the Kinshasa-Ilebo Railroad, https://www.afdb.org/en/documents/document/multinational-study-on-the-road-rail-bridge-between-kinshasa-and-brazzaville-and-the-kinshasa-ilebo-railroad-8186.
The project is being implemented in line with the decision of the Presidents of the five countries along the Abidjan-Lagos Corridor in February 2014, to construct a 6-Lane (2x3) dual-carriage Highway from Abidjan in Côte d'Ivoire through Accra, Lome and Cotonou to Lagos in Nigeria. The Abidjan-Lagos Corridor is approximately 1,080 km long, connects some of the largest and most economically dynamic cities in Africa, namely: Abidjan, Accra, Cotonou, Lomé and Lagos and covers a large proportion of West Africa's population. It also links very vibrant seaports which serve all the landlocked countries of the region, being Burkina Faso, Mali and Niger.
In order to ensure a holistic transformation of the transport corridor into an Economic Development Corridor, the Programme has been packaged into several Components as follows:
a. Feasibility Study and Environmental, Social Impacts Assessment (ESIA): This covers Feasibility study - engineering, financial, economic analysis (ii) detailed engineering design; (iii) PPP viability assessment for investment and operations of the corridor; Comprehensive impact assessment on all environment and social implication of the project including resettlement and compensation.
b. Detailed Engineering Design: Detailed engineering design of the safe and effective implementation of the hard infrastructure that is fit for purpose and in compliance with best practice and national requirements.
c. Corridor Spatial Development Study: An analysis of the physical, technical, policy, economic and market aspects of the corridor to develop a realistic, market feasible and implementable corridor investment masterplan, development framework and delivery strategy. The will identify "anchor projects" for the Corridor that naturally lead to upstream and downstream investments with the goal of creating an industrial cluster of new businesses offering increased employment. The anchor project will be in all economic sectors being transport, power, water, telecommunications, Agriculture, Mining etc.
d. Corridor Management Authority Establishment and Operations - Finalize the Legal Framework and Institutional Structure and Establish the Abidjan-Lagos Corridor Management Authority in line with the Project Treaty.
e. Trade and Transport Facilitation - This include a review of the existing trade facilitation related studies and policies in operation along the corridor (ii) develop a harmonized and simplified sub-regional transportation and transit systems and border (one-stop) management. Scope to include ICT connectivity and information sharing between stakeholder platforms such as customs, immigrations and other border agencies at national and regional level; iii) initiate Implementation
f. Technical Assistance Service to ECOWAS and Member States - Comprise capacity support to the ECOWAS and Member State agencies to effectively manage all the above service delivery components on behalf of ECOWAS. This will include: i) consulting and advisory services; ii) procuring office equipment; iii) conduct project visibility (marketing) activities; v) conducting regional workshops, and platforms for multi-lateral coordination activities, e.g. JTC and JSC meetings and study validation workshops
g. Road Safety Audits - A Study on developing operational road safety systems, utilising safe design practices and international standards, to be implemented during the design and operational phase of a project to ensure safety of all road users.
Project Oversight Responsibility
Project Steering Committee:
The Heads of State and Government also established a Steering Committee made up of the Ministers of Works/Roads to provide oversight guidance and the Commissioner for Infrastructure of the ECOWAS Commission. The Nigerian Minister in-charge of Road Works was designated by the Presidents as the Chair of the Steering Committee. At the 6th meeting of the Ministerial Steering Committee, the Ministers designated Cote d'Ivoire as the deputy Chair to the Steering Committee.
Executing Agency
The Heads of State at the outset also designated the ECOWAS Commission to coordinate and facilitate project implementation the project. In this regard, the Commission through its Department of Infrastructure serves as the Executing Agency for the project on behalf of the Corridor Member States, under the supervision of the Commissioner for Infrastructure.
Establishment of Abidjan-Lagos Corridor Management Authority (ALCoMA)
- Study on the Institutional and Legal Framework for the Establishment of the Abidjan-Lagos Corridor Management Authority (ALCoMA) completed
- Intergovernmental Agreement for the Establishment of the Abidjan-Lagos Corridor Management Authority (ALCoMA) completed, validated by Corridor Member States and Signed by the Ministers in-charge of the Corridor project on 19th October, 2018 at Abidjan, Cote d'Ivoire.
Current Status - Contracts commenced in February, 2019 for the Feasibility and Detailed Engineer Design Studies for the entire 1080km.
NOTE:
The Abidjan-Lagos Corridor Highway Development Project (ALCHDP) which was conceived by the Heads of State and Governments of the five countries with a vision of transforming the Corridor into a homogeneous 6-lane supranational economic development corridor highway from Lagos to Abidjan with massive trade and transport facilitation components as well as homogeneous corridor management.
A key component of this project is to develop a 6-lane dual carriage highway with the same standards, norms, dimensions, characteristics and management system. The Presidents of the five corridor countries signed a project specific Treaty which among others created a new Corridor Authority to own, construct, management and operate the Corridor Highway on behalf of the five countries.
The Feasibility & Detailed Design Studies currently underway for the Abidjan-Lagos Corridor Highway Development Project, is as part of technical studies, bench-marking the current status of the corridor (all existing or completed road sections, planned interventions by governments and partners, etc) to come up with a comprehensive design that meets the standards and objectives of a supranational dual carriage highway with a common set of rules, standards and dimensions. Following the spirit of the Treaty, the design will recommend upgrades or improvements for all such completed sections, if necessary, in other to meet the agreed dimensions or standards of the multinational highway.
Democratic Republic of Congo, South AfricaCentral Africa, Southern Africa2020
The project proposes electricity interconnections from the Grand Inga hydropower station through a northern axis, southern axes using eastern and western corridors, and a western axis. The generation and transmission infrastructure is intended to supply the Democratic Republic of Congo and wider African markets.
World Bank documentation explains that the full Inga resource could eventually be developed through several projects sharing common site infrastructure, while the next project-Inga 3- may be configured at different scales. Earlier studies examined a 4,800 MW option and later concepts reached approximately 11,000 MW. The approved development programme therefore focuses first on helping the DRC prepare the project and prepare the country and affected communities to benefit from it. The first phase supports water, electricity, roads, skills, governance, environmental and social work and technical decision-making.
Ethiopia, Kenya, South Sudan, UgandaEast Africa, North-Eastern Africa2020
The LAPSSET Railway Project forms the railway component of the Lamu Port-South Sudan-Ethiopia Transport Corridor. Its approved purpose is to create a new regional rail connection from the Indian Ocean coast through northern Kenya to Ethiopia and South Sudan. The route begins at Lamu Port, runs through Garissa to Isiolo, and then divides into two international branches. One branch continues through Nginyang and Nakodok to Juba in South Sudan, while the other continues through Moyale to Addis Ababa in Ethiopia. The approved concept also includes a railway connection between Nairobi and Isiolo.
The approved regional network is approximately 2,900 km long. The PIDA PAP II submission specifies a 1,435 mm standard gauge and electric-powered railway technology, with design speeds of up to 160 km/h for passenger trains and 120 km/h for freight trains. The planned railway is intended to carry passengers, heavy goods, oil products and other non-pipeline petroleum products, including bulk fuel oil, bitumen and liquefied petroleum gas, between Lamu Port and demand centres along the corridor. These are planned design parameters and must not be reported as completed or operational capacity.
The project is regional in both geography and governance. Ethiopia, Kenya and South Sudan are the member states and project locations recorded in the approved PAP II submission. Uganda is also identified as a beneficiary country. IGAD is the regional economic community and the IGAD Secretariat is identified as the project institution. The project is aligned with Kenya Vision 2030 and the IGAD Regional Infrastructure Master Plan. Implementation will require coordinated technical standards, cross-border operating rules, environmental and social safeguards, land and corridor protection, institutional agreements and financing arrangements across the participating countries.
The submitted project-cost baseline is USD 12.0 billion. This amount should remain the historical PAP II baseline until a later consolidated cost is supported by an approved regional study. The approved-project record identifies S2A - Pre-Feasibility as the last known milestone. The PIDA Investment Prospectus status history also records Pre-Feasibility in 2020, 2022 and 2024. These dated status entries should control the historical annual records rather than retrospectively applying the current feasibility label.
The current PIDA Investment Prospectus displays the project at Feasibility, or 50 percent progress. It identifies the remaining work as completion of comprehensive feasibility studies across the project, mobilisation of technical assistance for detailed designs, establishment of a corridor-coordination mechanism, completion of environmental and social assessments, development of PPP frameworks and securing of financing commitments. Contractors and operators remain to be determined through competitive procurement after project structuring and financing.
Other LAPSSET investments must not be used as evidence of railway construction. Progress on Lamu Port, highways, pipelines, airports, resort cities, the refinery, the multipurpose dam or communications systems belongs to separate components of the wider corridor.
Algeria, Niger, NigeriaNorth Africa, West Africapap1
The Trans-Sahara Gas Pipeline is a proposed international gas pipeline corridor intended to move Nigerian gas northward through Niger to Algeria, where it would connect to existing Mediterranean export infrastructure. The database contains both a regional Trans-Sahara record and a Nigeria-section record; these should be treated as related components, not independent additive projects.The project has a long history, dating back to early Nigeria-Algeria cooperation and renewed through trilateral Nigeria-Niger-Algeria ministerial processes. Recent sources report renewed agreements to update feasibility work and accelerate the project. The strategic case is gas monetisation, regional energy security and potential exports to Europe, but security, financing, reserve commitment, competing pipeline routes and energy-transition demand risks remain material.Validation note: public sources commonly cite total project costs in the USD 10-20 billion range, with recent reporting around USD 13 billion. The database capex values for ID 2004 and ID 762 should be checked to avoid double counting the regional pipeline and Nigeria section.Sources reviewed: Global Energy Monitor, Trans-Sahara Gas Pipeline, https://www.gem.wiki/Trans-Sahara_Gas_Pipeline; Pipeline Journal, Algeria, Nigeria and Niger sign agreements to advance TSGP, https://www.pipeline-journal.net/news/algeria-nigeria-niger-sign-agreements-advance-trans-saharan-gas-pipeline-project; Flyvbjerg et al., What causes cost overrun in transport infrastructure projects, https://arxiv.org/abs/1304.4476.
TransportT.IW.26.04Establishment of a Navigational Line between Lake Victoria and the Mediterranean Sea - Feasibility Study Phase 2 (VICMED)
Burundi, Democratic Republic of Congo, Egypt, Ethiopia, Kenya, Rwanda, South Sudan, Sudan, Tanzania, UgandaCentral Africa, East Africa, North Africa, North-Eastern Africa2020
The VICMED initiative proposes an integrated navigation and multimodal transport corridor from Lake Victoria to the Mediterranean Sea. It is intended to connect Nile Basin countries through river, lake and supporting land-transport infrastructure and to improve access for landlocked countries to international ports and markets.
The project's expected benefits include lower-cost movement of goods, improved regional trade and tourism, employment creation and stronger economic integration. It also requires careful assessment of water-resource, environmental, social, navigational and institutional implications across a large transboundary basin.
The prefeasibility study, which involved consultation with the footprint countries, was completed in 2015 and approved in 2017 by the 3rd Steering Committee for VICMED.
The feasibility study Phase 1 was completed in July 2019 and was funded through a US$650,000 grant from AfDB. It involved the development of an institutional and legal framework for VICMED and conducting a training needs assessment. It also involved preparing the terms of reference for Feasibility Study Phase 2 and carrying out training for countries on inland water transport, which took place in February.
Algeria, Egypt, Libya, Mauritania, Morocco, TunisiaNorth Africa
The Libyan Alternative Freeway/Emsaad-Ras Ajdir motorway is intended to provide a modern high-capacity road along Libya s coastal transport spine. The road has strategic regional importance because it forms part of the wider Maghreb highway and supports movement between North African markets, ports and border crossings.The project has a long history. Reuters reported in 2010 that Libya had attracted offers for a roughly 1,700 km four-lane road from Ras Ajdir to Imsaad. ERMA describes the new highway as part of the Maghreb highway and as a response to congestion, safety and transport-sector development needs.Validation note: the database values of preparation_cost 700, capex_cost 7,000 and operation_cost 350 USD million match older PIDA-style values, but external current validation remains limited. The values should be treated as historical/provisional until Libya s strategic transport-sector study and updated pipeline confirm scope and cost.Sources reviewed: Emsaad-Ras Ajdir Motorway Authority, Project for the new fast road, https://erma.gov.ly/en/new-hight-way-project/; Reuters, Libya 1700 km road attracts offers, https://www.reuters.com/article/world/africa/libya-1700-km-road-attracts-20-offers-italy-min-idUSLDE67N1BP/.
The project proposes an inland alternative freeway running east-west across Libya for approximately 1,750 km. It is intended to improve national and regional route redundancy, relieve pressure on coastal connections, support domestic mobility and strengthen links with neighbouring North African and Maghreb transport corridors.
The active PAP II financial baseline is USD 7 billion in CAPEX. The active record's length dimension is corrected from 1,750 metres to 1,750,000 metres, representing approximately 1,750 km.
The last verified PAP II portfolio milestone is S3A.
TransportT.05.05.01.02Nairobi - Malaba Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Nairobi to the Kenya/Uganda border at Malaba.
EnergyE.30.083,050 MW Mambilla Hydroelectric Power Project
NigeriaWest Africa2020
The project will develop a 3.05 GW hydroelectric complex near Kakara Village on the Mambilla Plateau in Taraba State. The approved PAP II concept includes four dams on the Donga River, water-conveyance tunnels and canals, two underground powerhouses and twelve turbine-generator units. The plant is designed to produce approximately 5.46 billion kWh of electricity each year. The high natural head and river flows of the Mambilla Plateau will be used to provide large-scale renewable generation for the Nigerian grid and potential regional exports.
Verified implementation and technical context: The scheme is one of Nigeria's largest proposed infrastructure investments and would require construction of multiple dams and reservoirs, underground waterways and powerhouses, high-head generating equipment, access infrastructure, transmission evacuation and major environmental and social management measures on the Mambilla Plateau. Federal budget and presidential records have repeatedly identified the project as a national priority and allocated funds for counterpart requirements, consultancy and implementation preparation. Because the official announcements are historical and the project has experienced a prolonged development period, the database description should distinguish the approved technical scope from any claim that the full EPC works are presently mobilised.
The project will connect Mtwara Port with Mbamba Bay through southern Tanzania and provide branch lines to the Mchuchuma coal and Liganga iron-ore deposits. The PAP II concept covers approximately 1,000 km of standard-gauge railway and is designed for passenger speeds of up to 160 km/h and freight speeds of up to 120 km/h. The PAP II baseline was USD 5.5 billion at 2016 prices, excluding VAT; Tanzania's March 2026 PPP pipeline gives a current indicative estimate of approximately USD 5.6 billion.
The railway is intended to form the transport backbone of the Mtwara Development Corridor. It would support movement of minerals, agricultural products, fuel, industrial inputs and general freight between inland production areas, Lake Nyasa and the Indian Ocean. Malawi, Mozambique, Tanzania and Zimbabwe are identified as beneficiaries in the PAP II record.
Feasibility and preliminary design were completed before the current reporting period. Government reporting in 2023 described the next step as engagement of a transaction adviser to review the earlier feasibility work and prepare procurement documentation for selection of a PPP investor. The PPP model reflects the project's large capital requirement and the need to link railway demand with development of the mineral and agricultural base.
In February 2026, Tanzania's Deputy Minister for Transport confirmed that feasibility and preliminary design had been completed and that the government was continuing to mobilise resources, including through public-private partnership arrangements. No official record reviewed confirms financial close, award of a railway works contract, contractor mobilisation or construction.
TransportT.05.05.01.01Mombasa - Nairobi Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Mombasa port to Nairobi in Kenya.
Algeria, Chad, Mali, Mauritania, Niger, NigeriaCentral Africa, North Africa, West Africa2020
The Trans-Saharan Optic Fibre Broadband Project (also known as the Dorsale Transsaharienne a Fibre Optique, DTS) is a multinational terrestrial fiber optic backbone connecting six African countries: Algeria, Niger, Nigeria, Chad, Mali, and Mauritania. The project is part of the African Union's New Partnership for Africa's Development (NEPAD) and is a flagship PIDA PAP 2 initiative. Algeria has completed 2,548 km of fiber optic linking Algiers to In Guezzam on the Algerian-Nigerian border, plus a secondary branch to Tindouf on the Algerian-Mauritanian border. Niger's component consists of 1,031 km across five national and cross-border routes (Arlit-Assamaka to the Algerian border; Diffa-N'Guigmi to the Chad border; Zinder-Magaria to the Nigerian border; Niamey-Dosso-Gaya to the Benin border; and Niamey-Makalondi to the Burkina Faso border), plus an 88-km urban local loop connecting administrative sites to a future national Tier III data centre. The Chadian component involves laying approximately 503-559 km of cable from Massaguet via Massakory, Ngouri, Mao, Rig-Rig and Daboua to the Niger border, plus a 50-km metropolitan network in N'Djamena. The project deploys high-capacity fiber optic technology and is co-financed by the African Development Bank (AfDB) and the European Union (EU), with a total project cost of EUR 79 million, including a EUR 29 million EU contribution administered by the AfDB through a delegation agreement. A coordination body, the Commission of the Trans-Sahara Optical Fibre Backbone (CLDT), is headquartered in Algeria and oversees multi-country implementation.
The project is a major Terrestrial Broadband Backbone designed to convey the excess bandwidth capacity from the shores to the hinterland and also provide an alternative gateway to Europe through Algiers as well as provide access point to landlocked Countries. It is also one of the presidential infrastructure champion Initiative (PICI) 2010 - 2015 of NEPAD aimed at accelerating socio-economic diversification of benefiting Countries
TransportT.05.05.01.05Kampala - Kasese Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Kampala to Kasese in Uganda.
TransportT.05.05.01.06Kasese - Mirama Hills Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Kasese in Uganda, to the border with Rwanda at Mirama Hills.
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from the Mirama Hills border (Uganda/Rwanda) to Kigali, the capital of Rwanda.
TransportT.RL.26.05Rehabilitation, Modernisation and Service Improvement of the Trans-Maghreb Railway
Algeria, Morocco, TunisiaNorth Africa2020
The project is intended to restore and modernise a continuous railway corridor between Morocco, Algeria and Tunisia. The approved first-phase scope includes modernisation of the Fez-Oujda line, rehabilitation of the Oujda-Akid Abbas cross-border section between Morocco and Algeria, creation of a new Annaba-Jendouba connection between Algeria and Tunisia and modernisation of the Jendouba-Jedeida section.
The technical concept includes rehabilitation and duplication of selected lines and structures, electrification using a 2x25 kV system, deployment of ERTMS Level 2 train control and targeted signalling and telecommunications improvements. Current PIDA technical material describes an approximate 2,300 km Casablanca-Tunis corridor. These are planned parameters, not completed outputs.
The project-location countries are Morocco, Algeria and Tunisia. Libya and Mauritania are mentioned only as possible future extensions and are not recorded as current project countries in the PAP II approved record. The Arab Maghreb Union and the national railway institutions are responsible for regional coordination.
The African Development Bank's project P-Z1-DC0-017 finances the pre-feasibility study for rehabilitation and modernisation of the Trans-Maghreb Railway. AfDB continued to list the operation as ongoing, with an implementation progress report issued for June 2024. This demonstrates active preparation but not completion of feasibility or entry into investment structuring.
Botswana, Democratic Republic of Congo, South Africa, Zambia, ZimbabweCentral Africa, Southern Africa2020
The project covers feasibility studies for the design, development, operation and maintenance of a high-voltage direct-current transmission scheme associated with the Inga 3 Low Head Project. The studies will cover the Democratic Republic of Congo, South Africa and the transit countries and will address land rights, land development, environmental authorisation and commercial arrangements.
The proposed HVDC corridor would require coordinated planning across the Democratic Republic of Congo, Zambia, Zimbabwe and/or Botswana and South Africa. Preparation must define the generation injection point, route, converter stations, transit arrangements, land and environmental requirements, wheeling and operating rules, long-term power-purchase commitments and financing and ownership structure. The World Bank states that Inga 3 is not yet fixed to one specific design, site or scale and that further technical, social, environmental, financial and legal studies are required. Accordingly, the 5,000 MW transmission concept remains a baseline proposal.
The Nacala Railway Corridor Project will transport approximately 18 million tons of coal, derived from the expansion of Moatize Mine (Mozambique) through a railway system connecting the existing mine in Moatize to a new coal terminal in Nacala Velha (Mozambique). The project was funded by Vale, and has the potential of being developed into a transport corridor for Mozambique's Tete Province, and potentially Zambia and the Democratic Republic of Congo (DRC). The railway line is located in the north-western region of Mozambique, starting at Moatize in the Tete Province, going through Malawi and connecting to the existing railway network at Nkaya Junction. From here the route follows the exisitng alignment through Entre Lagos, Cuamba and Nampula. Finally, in the region of Monapo, the railway follows a new route up to the new coal terminal at Nacala Velha. Aurecon previously developed FEL 1, 2 and 3 (Front End Loading) studies for the development of the corridor. The Detail Design (FEL4), included the design of the entire railway line and its associated infrastructure from the mine loadout station to the car dumper at the proposed new port terminal at Nacala Velha. The railway line is designed for a 20.5t axle load. Apart from providing an export conduit for the client, the rail corridor will have direct- and indirect social benefits to the larger community in terms of job creation, improved mobility (passenger train services) and the economic development of the region.
TransportT.BD.20.02Construction of a Bridge over the Oubangui River and Development of the Bangui-Kisangani-Kampala and Kisangani-Bujumbura Corridors
Burundi, Central African Republic, Democratic Republic of Congo, UgandaCentral Africa, East Africa2020
The Oubangui River crossing between Bangui and Zongo is a missing physical link between the Central African Republic and the Democratic Republic of Congo. The project is designed as more than a stand-alone bridge: it also includes missing road sections and facilitation measures on two regional corridors extending through the DRC towards Uganda and Burundi.
The Bangui-Kisangani-Kampala corridor contributes to the continuity of the Lagos-Mombasa Trans-African Highway, while the Kisangani-Bujumbura corridor supports a direct connection between Central and East Africa. The programme is intended to reduce transport discontinuities, improve border movement and support trade among Burundi, the Central African Republic, the Democratic Republic of Congo and Uganda.
The PAP II submission described an estimated road programme of approximately 2,700 km together with the river bridge. This broad scope explains why the original full-programme estimate is materially higher than later figures referring only to the bridge, preparation operation or a priority implementation phase. These figures must not be combined or substituted without defining the relevant scope.
The AfDB financed a feasibility-study operation covering the bridge, missing corridor links and transport and trade facilitation. Completion reporting issued in 2024 confirms completion of that preparation operation. This supports S2B - Feasibility, but not project structuring or construction unless subsequent official records show an approved delivery structure, financing plan and procurement process.
The next requirements are to confirm the investment scope to be taken forward, update cost estimates and designs where necessary, agree implementation responsibilities among the participating states and ECCAS, structure financing and prepare the procurement and safeguard instruments required for implementation.
WaterW.04.01Lesotho Highlands Water Project (LHWP) Phase II
Lesotho, South AfricaSouthern Africa2020
The Lesotho Highlands Water Project (LHWP) Phase II is a multi-billion Maloti/Rand bi-national infrastructure project between the Governments of the Kingdom of Lesotho and the Republic of South Africa, established under the 1986 Treaty and the 2011 Phase II Agreement. Phase II is designed to augment water delivery to South Africa and increase hydropower generation capacity in Lesotho. The project is implemented by the Lesotho Highlands Development Authority (LHDA) on behalf of Lesotho and the Trans-Caledon Tunnel Authority (TCTA) on behalf of South Africa.
The core infrastructure components of Phase II include: (1) The Polihali Dam, a 165 m high concrete-faced rockfill (CFRD) embankment dam located downstream of the confluence of the Senqu and Khubelu Rivers in the Mokhotlong district, which will create a reservoir with a surface area of 5,053 ha and a storage capacity of 2,325 million cubic metres; (2) A 50 m high saddle dam; (3) The Polihali-Katse Transfer Tunnel, a 38.2 km long, 5 m diameter gravity tunnel connecting the Polihali reservoir to the Katse reservoir, being excavated by two Tunnel Boring Machines (TBMs) simultaneously from both ends; (4) The Oxbow Hydropower Scheme on the Malibamatso River, with an installed capacity of 80.3 MW and an average annual output of 180 GWh, currently at detailed engineering design phase with commissioning slated for 2030/31; and (5) Advance infrastructure including roads, bridges (including the 825 m long, 90 m high Senqu Bridge), high-tension power lines, telecommunications systems, accommodation and construction facilities.
Phase II will increase the current annual water supply rate from 780 million cubic metres to approximately 1,270 million cubic metres per annum, adding 490 million cubic metres per year to South Africa's Integrated Vaal River System. Water delivery is targeted for financial year 2028/2029, with reservoir inundation planned for 2027. As of late 2025, overall project completion stood at approximately 48%, with dam construction at 37% complete. The Katse TBM was launched on 15 January 2025 and the Polihali TBM arrived on site in July 2025 and began excavation in January 2026.
Kenya, South SudanEast Africa, North-Eastern Africa2020
The project proposes a crude-oil pipeline from the South Sudan oil fields and the South Lokichar basin in Kenya to Lamu Port. Crude oil will be received at a tank terminal and transported through export pipelines to offshore single-point moorings for loading onto oil tankers. The PAP II design also considers related product-pipeline and refinery interfaces. At Lamu, the export system includes onshore and offshore pipeline sections routed to avoid the town centre and sensitive port-development areas, with offshore connections to the designated loading points.
Verified implementation and technical context: The pipeline is one component of the wider LAPSSET corridor, but its development must be assessed separately from Lamu Port works, highway construction, the South Lokichar upstream petroleum project and interim road or rail evacuation options. The Parliament of Kenya reported that the pipeline design and mapping covered about 821 km and that the facility could also provide a commercial export route for South Sudanese crude. The project nevertheless requires an agreed regional implementation framework, secure land rights, environmental and social approvals, a commercially viable tariff and throughput structure, financing and coordinated terminal and offshore-loading infrastructure before physical construction can begin.
Envisioned as one of the largest hydropower projects in the country, TAMS is designed to have an installed capacity ranging from 1,060 MW to 2,000 MW, with a projected annual generation of around 5,760 GWh of electricity, significantly enhancing Ethiopia's renewable energy supply.
The proposed Tams Dam will be a 248m high concrete face rockfill structure with a total storage capacity of 5,868 Mm3 and a live storage of 4,807 Mm3. Eight 250MW vertical Francis turbines will be installed and operate under a head of 210m.
Developed under the ownership of Ethiopia's Ministry of Water, Irrigation and Energy, and supported by international engineering consultancies, TAMS is expected to cost more than $3 billion and will be implemented under a BOOT (Build, Own, Operate, Transfer) model. Anticipated payback period is 10.60 years.
Beyond power generation, the project aims to support regional development through improved water management and potential irrigation benefits, underscoring Ethiopia's commitment to sustainable infrastructure and energy.
A 2x3 Highway from Abidjan to Lagos through Accra, Lome and Cotonou covering a large proportion of West Africa"’s population and linking very vibrant seaports which serve all the landlocked countries of the region being Burkina Faso, Mali and Niger. The project also includes provision for trade and transit facilitation, corridor management and the development of economic zones such as logistics centers, industrial zones, cross-border and regional markets to ensure the integration of the region and economic development.
The Lesotho-Botswana Water Transfer Project (LBWT) is a major transboundary water infrastructure initiative to transfer water from the water-rich highlands of Lesotho to the arid regions of Botswana, traversing South Africa. The project's core components include: 1) Construction of a new multipurpose dam on the Makhaleng River in Lesotho, with an indicative storage capacity of approximately 1,200 million cubic meters. 2) A conveyance system comprising pipelines, pumping stations, and associated infrastructure to transfer water from the dam in Lesotho, across South Africa, to Botswana. The indicative pipeline length is over 700 km. 3) The project aims to yield about 500 million cubic meters of water per year, with an indicative 75% allocated to Botswana, and the remainder for Lesotho's Lowlands and en-route communities in South Africa. 4) The dam is planned to have a hydropower generation component. The project is being developed under the framework of the Orange-Senqu River Commission (ORASECOM).
The port expansion for Durban are driven by the major container expansions required to ensure that the port component of the Durban to Gauteng Freight Corridor can meet future demand. Short term expansions will be made within the existing port followed by medium term development of a complementary new port on the old airport site, followed by a long term expansion in Bayhead.
WaterW.30.04Lesotho-Botswana Water Transfer Project
Botswana, Lesotho, South AfricaSouthern Africa2020
The project will construct a multipurpose dam on the Makhaleng River in Lesotho, associated hydropower facilities and a water-conveyance system of approximately 700 km through South Africa to Botswana. Current PIDA specifications indicate a 124-metre concrete arch dam, an estimated yield of 310 million cubic metres per year, about 30 MW of hydropower at the dam and additional generation along the conveyance route. The system is intended to supply domestic, agricultural and industrial users in all three participating countries.
TransportT.08.05.01Dar es Salaam - Isaka - Mwanza Standard Gauge Railway
Rwanda, Tanzania, UgandaEast Africapap1
Tanzania is constructing the high speed electric standard gauge railway line from the port of Dar es Salaam to the inland Lake Victoria (at Mwanza) (1219 Km) with a target speed for passenger trains travelling at up to 160kph and cargo trains at up to 120kph and a branch from Isaka to Rusumo connects Keza in Kigali (371 Km)
TransportT.05.05.01.04Malaba - Kampala Standard Gauge Railway (part of Mombasa - Kigali Railway Project)
Kenya, Rwanda, UgandaEast Africapap1
The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from the Malaba border post (between Kenya and Uganda) to the Ugandan capital Kampala.
The first stage will connect Egypt and Sudan along the Cairo-Cape Town road corridor through two high-voltage circuits. The PP2 concept considers 1,000 kV HVDC or a combination of 800 kV alternating-current and direct-current solutions, subject to technical and economic feasibility studies.
The preparation programme is intended to bring the project to international financial-institution standards and establish the technical, environmental, social, economic, procurement and financing basis for a future investment. The interconnector is expected initially to facilitate transfer of surplus Egyptian power to Sudan and, over time, support stronger links among the Eastern Africa Power Pool, Southern African Power Pool and wider continental market. The project must remain separate from the existing lower-capacity Egypt-Sudan connection. The MCDF grant is project-preparation finance and does not constitute financing of the main transmission works.
Construction and upgrading of the approx. 2,000 km single carriageway road from Yaounde (Cameroon) to Brazzaville (Congo). In particular, this project involves the section in Cameroon, from Yaounde to the border with Congo.
EnergyE.30.10Development of the Chollet Hydroelectric Site and Associated Transmission Lines
Cameroon, Republic of CongoCentral Africa2020
The PP2 project comprises development of a hydroelectric power station with an installed capacity of 600 MW and construction of associated transmission lines to supply localities in northern Republic of Congo, south-eastern Cameroon and south-western Central African Republic.
Verified implementation and technical context: Chollet is designed as a binational generation project with regional evacuation lines rather than a stand-alone national plant. Its development requires a common Cameroon-Republic of Congo institutional framework, a concession and ownership structure, coordinated environmental and social management, power-purchase and transmission arrangements and a financing package covering both the hydropower facility and associated lines. AfDB's CAPP acceleration material lists the project as undergoing financial structuring and gives a euro-denominated investment estimate. This should be treated as a current structuring reference and reconciled with the older PP2 cost basis before database financial fields are changed.
WaterW.30.01Continental Africa Water Investment Support Programme (AIP)
Benin, Cameroon, Ghana, Kenya, Nigeria, Tunisia, Uganda, ZambiaCentral Africa, East Africa, North Africa, Southern Africa, West Africa2020
AIP provides an enabling and project-preparation framework for priority transboundary and regional water investments submitted by African member states. It supports integrated water, health, energy and food-security projects; strengthens institutional arrangements; helps sponsors develop bankable projects; and links project pipelines to preparation facilities, public finance and private investment. The first phase identifies specific programmes in Benin, Cameroon, Tunisia, Uganda and Zambia, together with regional initiatives supported through institutions such as ECCAS and the SADC Water Fund.
EnergyE.30.09Development of the Booue and Tsengue-Leledi Hydroelectric Sites and Associated Transmission Lines
GabonCentral Africa2020
At Booué, the project will develop an intake dam, headrace canal and a power station equipped with five Kaplan units with total installed capacity of 411 MW. At Tsengué-Lélédi, it will develop an intake dam, four penstocks and a power station equipped with four Francis units with total installed capacity of 300 MW. Associated 400 kV transmission lines will connect the generation sites with Cameroon, the Republic of Congo and Equatorial Guinea and supply communities located along the high-voltage routes.
Verified implementation and technical context: The current government strategy links Booué and Tsengué-Lélédi to energy sovereignty, industrial development and increased use of low-carbon generation. The October 2025 memorandum concerns preparation of construction studies for both hydropower sites. The July 2026 mutual-commitment protocol is more specific to Booué and establishes a framework for advancing the dam to international technical, environmental and governance standards. The protocol is an important project-development milestone, but it must not be presented as financial close or construction of the complete two-site and regional-transmission programme.
Upgrading of the 1,602 km of single carriageway road from Libreville (Gabon) to Brazzaville (Congo). In particular, this project involves the section in Gabon, from Libreville to the border with Congo.
Expansion of the Maputo port, including the dredging of the port from its current 9,4 m draught to 11 m to accommodate the larger Panamax vessels, which will improve the port"’s competitiveness in terms of bulk and container traffic, and expansion of the coal terminal.
Central African Republic, Chad, Republic of CongoCentral Africapap1
The Ouesso-Bangui-Ndjamena road is a link in the Pointe Noire-Brazzaville / Kinshasa-Bangui-Ndjamena multimodal transport corridor. The road is also part of the network of the priority program of the consensual master plan of transport in Central Africa (PDCAT). The corridor connects the capitals of Congo, the Democratic Republic of Congo, the Central African Republic (CAR) and Chad. It also provides the CAR and Chad with a second access to the sea.
A highway network of approximately 1310 km, which starts from Ouesso in North Congo to MbaA¯koro (near Moundou) in the South of Chad while passing through Bangui in Central African Republic. It comprises the following two sections: (i) the Ouesso-Bangui section in the equatorial forest to the South, which is about 640 km long and lies across Congo and the CAR; and (ii) the Bangui-MbaA¯koro section in the savannah woodland to the North, which is about 670 km long and lies in CAR and Chad territory;
The Nacala Railway Corridor Project will transport approximately 18 million tons of coal, derived from the expansion of Moatize Mine (Mozambique) through a railway system connecting the existing mine in Moatize to a new coal terminal in Nacala Velha (Mozambique). The project was funded by Vale, and has the potential of being developed into a transport corridor for Mozambique's Tete Province, and potentially Zambia and the Democratic Republic of Congo (DRC). The coal terminal will have the capacity to handle 30 million tons per annum.
The project will construct a hydropower dam and power station on the Cunene River at the Angola-Namibia border, downstream of the Epupa Falls. The station is planned with a capacity of approximately 600 MW, shared equally between Angola and Namibia, and will operate mainly as a mid-merit and peaking facility. The scheme includes the dam, reservoir, turbines, power station, switchyard, ancillary structures and transmission connections to the two national grids. Its operation will vary seasonally according to river flows and electricity demand.
Verified implementation and technical context: Baynes is governed through binational cooperation on the Cunene River and must be developed together with the transmission facilities needed to deliver each country's share of power. The AfDB advisory programme supports the two governments and utilities in defining a bankable structure, preparing the project for financing and coordinating the hydropower and transmission components. The plant is intended to provide flexible and peaking renewable generation that complements variable regional supply and reduces the need for expensive peak-period imports. The current official configuration is approximately 600 MW; older higher-capacity figures should not remain in the database without an approved design source.
The Bedden Hydropower plant is a flagship initiative by the government of South Sudan. It is situated approximately 65km upstream from Juba. The scheme targets an installed capacity of around 540 - 570 MW.
First mapped out in detailed energy-sector roadmaps from around 2009, Bedden was identified as a key long-term priority alongside other major hydropower sites on the Bahr El Jebel such as Fula, Lakki, and Shukoli.
The project underwent feasibility and environmental impact assessments, and a conceptual EPC (Engineering, Procurement, and Construction) was prepared in 2013.
The plant design envisions a 32m high concrete gravity dam reaching a height of roughly 65m with a reservoir crest length of around 5km and an effective hydraulic head of approximately 30m. Once operational, it would substantially alleviate grid constraints in and around Juba and possibly feed power into the broader national grid and regional interconnections.
TransportT.13.04.01Dakar - Bamako Standard Gauge Railway (Senegal section)
Burkina Faso, Mali, SenegalWest Africapap1
This project covers the Senegal portion of the Dakar-Ndjamena-Djibouti Road/ Railway project. This is a multimodal transboundary transport corridor including Senegal, Mali, Burkina-Faso, Niger, Nigeria, Cameroon, Chad, Sudan, Ethiopia and Djibouti. It is a combination of the Trans-African Highway 5 (Dakar to N’djamena) and 6 (N’djamena to Djibouti), a combined distance covered of 8,715 km.
However over time, the railway transport route between Dakar and Bamako has become degraded and and created hindrances in the international services for passenger transportation. In order to improve the competitiveness of the route, the two states financed a study in order to define the best way to finance or to participate in the funding of the Dakar- Bamako railway infrastructure upgrade.
The project will have the following components:
Rehabilitation of the platform and reconstruction of the engineering works to 22.5 tons / axle;
Railway rehabilitation (main roads and service roads)
Implementation of a train cantonment system and a telecommunications system in line with UIC railway standards;
Acquisition of rolling stock and railway equipment;
Development and renovation of station facilities.
The Dakar-Bamako Rail Project has been prioritised by the Government of Senegal as the first of three phases of the Project. It entails the rehabilitation of the existing railway network between Dakar and Bamako (1,228 km), with a total project cost of US$ 2.2 billion.
TransportDar es Salaam - Chalinze - Morogoro Road Capacity Upgrade
Burundi, Rwanda, Tanzania, UgandaEast Africapap1
Rehabilitation and upgrading of the 197 km of road which would be the first toll road in Tanzania (First 100 km 6 lanes and then 4 lanes). The project requires the construction of a new road, adjacent to the existing road, that will give drivers the choice between paying for a superior toll road, constructed to expressway standards, or making use of the existing road. The project comprises four and six lane carriageways, 8 interchanges, 7 toll plazas and weigh bridges as well as a number of bridges.
Tanzania"’s Roads Act 2007 recognises the Dar es Salaam - Chalinze - Morogoro road section as part of the main TANZAM Highway and Central Corridor T-1 route which connects Dar es Salaam and its port with land locked neighbouring countries.
The proposed Kaléta dam project entails the construction of a gravity dam, with a 240 MW capacity. The Kaléta site is located in Guinea, 115 km northeast of Conakry and 130 km upstream of the mouth of the Konkouré River.
This project was previously part of the larger Gambia River Basin Development Organisation (OMVG) project involving the four countries, namely The Gambia, Guinea, Guinea-Bissau and Senegal. Guinea, however, decided to develop Kaléta as a stand-alone. Interconnection to other OMVG countries remains intended in future.
The project will have the following characteristics:
Storage hydropower plant with 240 MW of hydropower capacity
Net average generation: 660 GWh/year
Gravity dam with maximum height: 22 m, crest length: 1060 m, reservoir storage: 23 million m3.
Democratic Republic of Congo, UgandaCentral Africa, East Africa
The Semliki River is part of the Nile River Basin with two thirds of
its course being in the DRC and the lower third forming the boundary between
the DRC and Uganda. Great Lakes Region is characterized by a shortage of
indigenous energy sources and highly skewed relationships of dependency
regarding energy imports Less than 10% of the population has access to
electricity. The region is thus heavily dependent on oil imports Currently,
majority of the population of Eastern DRC, Rwanda, Burundi and Uganda relies on
bio-fuels such as wood The power demand for the cities of Beni, Butembo and
surroundings will be supplied from a hydropower station on the Semliki River
with a capacity of 72 MW. It will need a step-up transformer MV/HV or MV;
including the construction of the distribution network. The Semliki hydropower
station would serve mainly the towns of Béni and Butembo as well as the rural
areas located around these towns. The available reserve could be exported to
the Great Lakes Region with an interconnection grid. The Semliki is one of four (the others are Mogomba, Muyama and Kiyimbi) proposed hydropower projects, packaged to have potential capacity of 150MW, generating annual energy production of 800 GWh.
A hydropower
station on the Semuliki River of 72 MW; - power distribution network low and high voltage in the
towns of Beni and Butembo and surroundings. The distribution network is
envisaged to be a Medium Voltage network. Béni and Butembo will be served by 30
kV lines from the substation at the Semliki plant.
Butembo has
already a network LV and MV linked to its own hydropower station. However its
network will be adapted to the parameters of the Semliki project (distribution
voltage 30 kV, distribution 6.6 kV) and will in some cases be extended. A high
voltage transmission line (220kV) from Goma - Butembo - Béni whose feasibility
is complete will also be constructed to evacuate the generation from Semuliki.Dated studies suggested the project would cost USD 900m. Several areas that require particular attention have been noted in previous studies including: Improvement of hydrological data and modelling, economic modelling to determine viability, comprehensive ESIA to address potentially large environmental challenges, the actual geological conditions, layouts and designs.
A budget of USD 6m has been included in the phase of the NEL-IP for the required studies to define the project better.
The project will construct approximately 80 km of dual-carriage motorway between Bou Salem and the Tunisian-Algerian border. Together with the Oujda-Algerian-border link in Morocco, it will close the principal missing sections of the central Trans-Maghreb Motorway Axis.
The project is intended to improve continuity between Tunisian and Algerian motorway networks, reduce travel times and accident risk, facilitate cross-border movement and strengthen regional trade and economic integration.
The original PAP II financial text gives TND 2.260 billion and provides a source USD equivalent of USD 805.27416 million. This is stored as CAPEX and total cost.
The UfM continues to identify the project as ongoing and states that completion of project design and implementation of the fundraising plan remain next steps. Evidence of PPP studies or a decision on delivery method supports project structuring but does not prove tender award or construction. T
TransportT-PT-26-002Lobito Port Expansion and Modernization Project
Angola, Democratic Republic of Congo, ZambiaCentral Africa, Southern Africapap1
The Lobito Port Expansion and Modernization Project is a major infrastructure initiative to transform the Port of Lobito into a modern, high-capacity Atlantic gateway for the Lobito Corridor. The project scope includes the construction of a new 1,250-meter multipurpose terminal with three berths, dredging of the access channel to -16.5 meters, and the installation of modern container handling equipment, including ship-to-shore gantry cranes. It also involves expanding the container yard, building new warehouses for bulk and general cargo, and enhancing rail-port connectivity through the rehabilitation of the Lobito Corridor railway linking Angola, the Democratic Republic of the Congo (DRC), and Zambia. The project is designed to increase the port's annual container handling capacity from approximately 200,000 TEUs to over 1 million TEUs. Key stakeholders include the Government of Angola (Ministry of Transport), the Port of Lobito Authority (APL), the Lobito Corridor Concessionaire (a consortium of Trafigura, Mota-Engil, and Vecturis), and international development partners like the U.S. International Development Finance Corporation (DFC) and the African Development Bank (AfDB). A significant recent development was the signing of a Memorandum of Understanding in October 2023 between the U.S., EU, Angola, DRC, and Zambia to support the Lobito Corridor, including the port.
The Geba 1 Dam includes a reservoir for regulation of flows which feed a 286MW hydropower plant 480m below, just upstream of the Geba 2 Dam. The Geba 2 Dam is very small, effectively a weir, diverting a constant flow to the 165MW Geba 2 hydropower plant a further 267m lower down. This cascade arrangement allows both the Geba 1 and Geba 2 powerhouses to efficiently use the regulated water flow from Geba 1's reservoir, optimizing power generation across both plants.
The combined project is expected to generate substantial clean electricity, contributing to Ethiopia's renewable energy goals and regional power supply.
The Geba cascade hydropower project was included in the short-term priority projects under the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Development Study Project (2017) after application of the basinwide Strategic Social and Environmental Assessment (SSEA) that was carried out as part of that project.
EnergyE.30.02Construction of 287 MW Ruzizi IV Hydropower Project
Burundi, Democratic Republic of Congo, RwandaCentral Africa, East Africa2020
The power plant will be located on the Ruzizi River, which forms the common border between Rwanda and the Democratic Republic of Congo, approximately five kilometres west of Bugarama in Rwanda's Western Province. Ruzizi IV will be developed near the existing Ruzizi I and II plants and the planned Ruzizi III plant. The facility is planned as the fourth hydropower station in the cascade, with an installed capacity of 287 MW. The generated electricity will be shared equally among Burundi, the Democratic Republic of Congo and Rwanda.
Verified implementation and technical context: The project is being prepared through regional institutions responsible for the Ruzizi basin and Great Lakes electricity cooperation. AfDB records describe a 287 MW plant intended to complete development of the remaining hydropower potential in the cascade. The preparation programme includes engineering and planning studies, environmental and social analysis, institutional arrangements, financial modelling and the definition of an implementation structure that can serve all three participating countries. Any current profile must avoid importing financing, procurement or construction milestones from Ruzizi III, which is a separate project with a different development history.
TransportBIP_LVBC_002Development of Ports and Maritime Transport on Lake Victoria
Kenya, Tanzania, UgandaEast Africa2024-01-NRBIP
The project will deliver:
(i) Reduced transport costs for landlocked EAC states (Uganda, Rwanda, Burundi) and neighbouring countries like DRC, by shifting cargo from long road hauls to lake shipping.
(ii) Improved lake transport operations - more reliable schedules, safer routes, better intermodal links (road/rail/port).
(iii) Increased investment in:
- port and maritime infrastructure,
- modern cargo and passenger vessels,
- tourism and water sports around the lake.
(iv) A safer navigation and security environment (fewer accidents, better emergency response).
Port rehabilitation and construction will include:
- Rehabilitation and expansion of Kisumu Port
- Construction of Bukasa Inland Port near Kampala;
- Upgrades in Mwanza, Bukoba, Musoma;
This project forms part of the West Africa North Core transmission interconnector which connects the power markets of Nigeria, Niger, Burkina Faso and Benin/Togo.
EnergyE.30.06Eastern Africa Green Power Transmission Network Project 6 - Guba (Ethiopia)-Khartoum (Sudan)
Ethiopia, SudanNorth-Eastern Africa2020
The project will develop a cross-border high-voltage alternating-current transmission line from Guba in Ethiopia to Khartoum in Sudan. It is one of the interconnections proposed under the Eastern Africa Green Power Transmission Network linking countries in the Horn of Africa and integrating them into the Eastern Africa Power Pool. The approved PAP II technical concept provides a transfer capacity of approximately 3,000 MW and will enable participating countries to exchange lower-cost renewable electricity through a larger regional market.
Verified implementation and technical context: The EAPP assignment requires the updated ESIA to cover transmission lines, substations, ancillary facilities and all linked activities, and to comply with the legal requirements of Ethiopia and Sudan and the World Bank Environmental and Social Framework. The required outputs include updated baseline and impact analysis, an environmental and social management plan, cumulative-impact assessment, resettlement planning, stakeholder engagement, indigenous-peoples planning and gender measures. The proposed line is a second interconnection and must not be confused with the existing Ethiopia-Sudan link. The investment is also affected by the current institutional and security environment in Sudan.
EnergyE.30.12Louga Hydroelectric Power Plants 1 and 2 (246 MW)
Côte d'IvoireWest Africa2020
Louga 1 will include a reservoir, a 1,683 m dam, three bulb-type generating units with total capacity of 126 MW, a spillway and tailrace canal. Louga 2 will include a reservoir, a 1,107 m dam, three bulb-type units with total capacity of 120 MW, a spillway and tailrace canal. Electricity will be evacuated through the 225 kV network, with the final evacuation arrangement to be confirmed by detailed design studies.
Verified implementation and technical context: CI-ENERGIES reports that PowerChina undertook reconnaissance, surveying and technical investigations and proposed replacing the original single Louga site with the two developments. Feasibility reports for Louga 1 and Louga 2 were submitted in December 2019, followed by technical review and preliminary environmental work. The two plants form part of the sequence of hydropower developments in the Sassandra valley and are intended to contribute to Côte d'Ivoire's target of a more diversified generation mix with a larger renewable share. Planned construction and commissioning dates in historical CI-ENERGIES reports are forecasts and should not be presented as achieved milestones.
The project proposes a multipurpose dam on the Dawa River approximately 20 km upstream of Rhamu Dimtu in Kenya and near Boni in Ethiopia. Current PIDA specifications indicate an estimated dam height of about 90 metres, reservoir capacity of approximately 4.5 billion cubic metres and potential hydropower generation of 8.2 MW. The stored water would support irrigation, flood control, domestic and livestock water supply, fisheries and improved dry-season water availability across the transboundary basin.
The project forms part of the upgrading of the 1,200 km of narrow gauge railway between Abidjan and Ouagadougou. In particular it involves the section in Ivory Coast, from Abidjan to the border with Burkina Fasso.
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project comprises the update of project studies.
Côte d'Ivoire, Guinea, Liberia, Sierra LeoneWest Africapap1
The 225 kV Côte d'Ivoire - Liberia - Sierra Leone - Guinea Interconnection Project (CLSG) is a major regional power transmission infrastructure project. It involves the construction of approximately 1,303 km of 225 kV double-circuit transmission line, connecting the national grids of Côte d'Ivoire, Liberia, Sierra Leone, and Guinea. Key components include 10 new substations (4 in Liberia, 5 in Sierra Leone, 1 in Guinea), the extension of the existing Man substation in Côte d'Ivoire, installation of Static Var Compensators (SVCs) at five locations, and the establishment of a Regional SCADA system and control centers. The project is a flagship of the West African Power Pool (WAPP) and is designed to facilitate electricity trade, improve grid stability, and provide electricity access to communities along the corridor using the Shield Wire Scheme.
Democratic Republic of Congo, ZambiaCentral Africa, Southern Africa2020
The Democratic Republic of Congo and Zambia signed an intergovernmental memorandum of understanding on 9 July 2015 for the joint development of generation projects in the Luapula River Basin and a new power interconnector. Their national power utilities also signed specific agreements for the generation projects and interconnector. Earlier investigations identified five potential hydropower sites and more than 1,188 MW of potential capacity, including over 773 MW of firm capacity. The technical concept provides for development in four phases, with an initial implementation phase of approximately 270 MW.
The AfDB project-preparation programme is intended to determine the technically, economically, environmentally and financially preferred sequence for developing the river's hydropower sites. It covers hydrology, geology, engineering design, energy production, transmission evacuation, institutional and legal arrangements, economic and financial analysis and environmental and social safeguards. The Luapula River forms the border between southern DRC and northern Zambia for a substantial part of its course, so the project requires joint governance and coordinated ownership, operation and power-offtake arrangements. The programme must remain separate from other Zambian hydropower schemes, including Kalungwishi and Lufubu.
ICTI.02.30.05Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre
Ethiopia, Kenya, Somalia, South Sudan, Tanzania, UgandaEast Africa, North-Eastern Africa2020
The Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre is a multi-country ICT infrastructure project under the PIDA Priority Action Plan 2 (PAP 2) 2021-2030. The project aims to interconnect Kenya and its neighbouring countries - Ethiopia, Somalia, South Sudan, Uganda, and Tanzania - by relaying Kenya's terrestrial fibre network connecting the submarine cables arriving at Mombasa to their borders through strategically placed Points-of-Presence (PoPs) and a high-capacity Smart Hub Data Centre. The project is coordinated through the East African Community (EAC) and the Intergovernmental Authority on Development (IGAD), and is aligned with Kenya Vision 2030, the ICT Infrastructure Masterplan, the Smart Africa and Digital Economy Blueprint, and the IGAD Regional Infrastructure Masterplan (IRIMP). It is structured as a Public-Private Partnership (PPP) and is considered a flagship project for regional digital integration under AU Agenda 2063. The project is complemented by the World Bank-funded Eastern Africa Regional Digital Integration Project (EARDIP), which supports EAC and IGAD as conduits of digital integration across Eastern Africa, covering Ethiopia, Somalia, South Sudan, and the two RECs in Phase I. A key enabling milestone was the official launch on July 18, 2025, of a 130 km cross-border terrestrial fibre link connecting Dar es Salaam (Tanzania) to Mombasa (Kenya) at the Lunga Lunga/Horohoro border, implemented by Tanzania Telecommunications Corporation (TTCL) and Kenya's ICT Authority (ICTA), operating at 1.6 Tbps and providing Tanzania access to Kenya's eight submarine cable landings.
Kenya already has several sub-marine fibers landing in Mombasa and has already done terrestrial fiber connecting the sub-marine cable to the borders of the other partner countries (Busia border for Uganda, Mandera border for Somalia, Moyale border for Ethiopia, Nadapal border for South Sudan, Lunga-Lunga, Namanga and Holili border for Tanzania). The inter-connectivity infrastructure at the border points comprising 400 Gbps PoPs and Smart Hub data centre in Mombasa are lacking.
The project proposes a joint dam on the Lower Orange River near Noordoewer in Namibia and Vioolsdrift in South Africa. The feasibility process has examined alternative sites and sizes for a re-regulation reservoir capable of improving the long-term sustainable yield of the Orange River System. The facility would support projected municipal, agricultural and industrial demand, future irrigation development and releases needed to meet ecological water requirements in the lower river.
TransportT.08.04.03Dar es Salaam New Berths Vijibweni, Mbwamaji and Kunduchi
TanzaniaEast Africapap1
This project includes development of 3 new berths on the eastern side of Dar es Salaam port, linked by a bridge south of the existing dockyard and fronting the new Kigamboni city extension. The new berths will allow avoidance of access chanel limitations making it possible to handle 6th generation vessels.
TransportT.RD.26.08Modernisation of RN01 between Ghardaia and Tamanrasset
Algeria, Chad, Libya, Mali, Niger, Nigeria, TunisiaCentral Africa, North Africa, West Africa2020
The project covers modernisation of RN01 between Ghardaia and Tamanrasset, a central Algerian section of the Trans-Saharan Highway. The intended works include capacity, pavement, alignment, safety and service improvements needed to support long-distance freight and passenger movements.
The project has regional significance because RN01 forms part of the principal route connecting northern Algeria with the Sahara, Niger, Nigeria and adjoining Sahel markets. Progress on rail projects or on other Trans-Saharan road sections must not be reported as implementation of this specific RN01 modernisation scope.
The verified PAP II financial baseline is USD 500 million in CAPEX.
The project retains S3A, as it is the last verified PAP II milestone and no later official evidence of exact scope supports a stage change. The existing 2,400 km dimension is not changed because the uploaded validation review concluded that it may describe the wider corridor rather than the specific Ghardaia-Tamanrasset section.
Namibia, South Africa, South SudanNorth-Eastern Africa, Southern Africa
"Orange River System (ORS) is one of the most highly developed River Systems in Southern Africa. In September 2015, Namibia and South Africa, under the auspices of the PWC, commissioned the Noordoewer / Vioolsdrift Dam (NVD) Feasibility Study, which aimed at identifying and optimising the best development dam size(s), site(s) and sequence of dam developments in the ORS needed to achieve the overall catchment objectives, to re-regulate the flows for ecological needs and to increase the yield in the Orange River System for use by both RSA and Namibia. The study was completed in May 2020.
The study investigated many possible options and in 2016 initially concluded that the optimal NVD would have a wall height of about 73 m, with a storage capacity of 2,800 million m3 and would be concrete faced rock fill type (CFRD).
Certain limited further feasibility studies are required before the project can proceed to implementation. Such studies would include at least an independent review of the above findings, the finalisation of the exact parameters for the recommended optimal NVD in terms of size, site and type, and obtaining environmental authorisation for implementation.
The development of the NVD project will involve the following further stages:
• Further feasibility studies
• Detailed designs, procurement and constructionOrange River System (ORS) is one of the most highly developed River Systems in Southern Africa. In September 2015, Namibia and South Africa, under the auspices of the PWC, commissioned the Noordoewer / Vioolsdrift Dam (NVD) Feasibility Study, which aimed at identifying and optimising the best development dam size(s), site(s) and sequence of dam developments in the ORS needed to achieve the overall catchment objectives, to re-regulate the flows for ecological needs and to increase the yield in the Orange River System for use by both RSA and Namibia. The study was completed in May 2020.
The study investigated many possible options and in 2016 initially concluded that the optimal NVD would have a wall height of about 73 m, with a storage capacity of 2,800 million m3 and would be of concrete faced rock fill type (CFRD).
Certain limited further feasibility studies are required before the project can proceed to implementation. Such studies would include at least an independent review of the above findings, the finalisation of the exact parameters for the recommended optimal NVD in terms of size, site and type, and obtaining environmental authorisation.The development of the NVD project will involve the following further stages:
• Further feasibility studies
• Detailed designs, procurement and constructionOrange River System (ORS) is one of the most highly developed River Systems in Southern Africa. In September 2015, Namibia and South Africa, under the auspices of the PWC, commissioned the Noordoewer / Vioolsdrift Dam (NVD) Feasibility Study, which aimed at identifying and optimising the best development dam size(s), site(s) and sequence of dam developments in the ORS needed to achieve the overall catchment objectives, to re-regulate the flows for ecological needs and to increase the yield in the Orange River System for use by both RSA and Namibia. The study was completed in May 2020.
The study investigated many possible options and in 2016 initially concluded that the optimal NVD would have a wall height of about 73 m, with a storage capacity of 2,800 million m3 and would be of concrete faced rock fill type (CFRD).
Certain limited further feasibility studies are required before the project can proceed to implementation. Such studies would include at least an independent review of the above findings, the finalisation of the exact parameters for the recommended optimal NVD in terms of size, site and type, and obtaining environmental authorisation for implementation.
The development of the NVD project will involve the following further stages:
• Further feasibility studies
• Detailed designs, procurement and constructionOrange River System (ORS) is one of the most highly developed River Systems in Southern Africa. In September 2015, Namibia and South Africa, under the auspices of the PWC, commissioned the Noordoewer / Vioolsdrift Dam (NVD) Feasibility Study which aimed at Feasibility Study, which aimed at identifying and optimising the best development dam size(s), site(s) and sequence of dam developments in the ORS needed to achieve the overall catchment objectives, to re-regulate the flows for ecological needs and to increase the yield in the Orange River System for use by both RSA and Namibia. The study was completed in May 2020.
The study investigated many possible options and in 2016 initially concluded that the optimal NVD would have a wall height of about 73 m, with a storage capacity of 2,800 million m3 and would be of concrete faced rock fill type (CFRD).
Certain limited further feasibility studies are required before the project can proceed to implementation. Such studies would include at least an independent review of the above findings, the finalisation of the exact parameters for the recommended optimal NVD in terms of size, site and type, and obtaining environmental authorisation for implementation.
The development of the NVD project will involve the following further stages:
• Further feasibility studies
• Detailed designs, procurement and constructionOrange River System (ORS) is one of the most highly developed River Systems in Southern Africa. In September 2015, Namibia and South Africa, under the auspices of the PWC, commissioned the Noordoewer / Vioolsdrift Dam (NVD) Feasibility Study, which aimed at identifying and optimising the best development dam size(s), site(s) and sequence of dam developments in the ORS needed to achieve the overall catchment objectives, to re-regulate the flows for ecological needs and to increase the yield in the Orange River System for use by both RSA and Namibia. The study was completed in May 2020.
The study investigated many possible options and in 2016 initially concluded at the optimal NVD would have a wall height of about 73 m, with a storage capacity of 2,800 million m3 and would be of concrete faced rock fill type (CFRD).
Certain limited further feasibility studies are required before the project can proceed to implementation. Such studies would include at least an independent review of the above findings, the finalisation of the exact parameters for the recommended optimal NVD in terms of size, site and type, and obtaining environmental authorisation for implementation.
The development of the NVD project will involve the following further stages:
• Further feasibility studies
• Detailed designs, procurement and construction"
This project concerns the Sudan section of a high-voltage Ethiopia-Sudan power interconnection designed to move power from Ethiopia into Sudan and strengthen the Eastern Africa Power Pool. The existing database record describes a 500 kV transmission line ending near Khartoum, with new or upgraded high-voltage substation facilities at Rabak and Jebel Aulia in Sudan and bay extensions linked to the Grand Ethiopian Renaissance area and Sudanese network nodes.The project has an important history. Ethiopia and Sudan already implemented an earlier interconnector, which the Nile Basin Initiative documents as commissioned around 2010-2013 and used to support regional power trade. That earlier success provides a technical and institutional basis for the larger 500 kV scheme, but it does not by itself validate the very high CAPEX currently stored against this record.Validation note: external sources confirm the strategic rationale and earlier Ethiopia-Sudan interconnection history, but I did not find a reliable external source confirming the current capex_cost value of 48,494 in USD million. The financial fields should therefore remain under owner validation before being used in investment material.Sources reviewed: World Bank, Regional Eastern Nile - Ethiopia-Sudan Power System Interconnector Project, https://documents.worldbank.org/en/publication/documents-reports/documentdetail/935901468201843498; Nile Basin Initiative, Ethiopia-Sudan interconnection success story, https://nilebasin.org/sites/default/files/2023-09/Ethiopia-Sudan%2520interconnection%2520success%2520story.pdf.
EnergyE.13.01Regional Rusumo Falls Hydroelectric Power Project II
Burundi, Rwanda, TanzaniaEast Africapap1
Regional Rusumo Falls Hydroelectric Project (RRFHP) Development Objective is to increase the supply of electricity to the national grids of Rwanda, Tanzania and Burundi. It Comprises of construction of an 80 MW power plant including the associated generation substation. The project is jointly financed by the Governments of Rwanda, Burundi and Tanzania with credits and grants totaling to USD 340 million equivalent for the Civil Works and Electromechanical Works. AfDB parallel-financing is associated with the transmission lines to each of the three countries at a cost of USD 121 Million. These include 220kV transmission lines double circuit running 161 km from the power plant to Gitega substation in Burundi, 119km double circuit line from the Power plant to Shango sub-station in Rwanda and 98.2 km double circuit line from the power plant to Nyakanazi sub-station in Tanzania.The project has the following components CP1 (Civil Works); CP2 (Electromechanical works); Livelihoods Restoration Program (LRP); and Local Area Development Program (LADP). Out of the USD 340 million, the budget breakdown for each of the component is as follows: (i)LADP allocation is USD 15 million (USD 5 million for each country (Burundi, Rwanda and Tanzania); (ii)LRP allocation is about USD 711,612 (only for PAPs); and (iii)The remaining is for CP1, CP2, OE, and PIU operations.The three governments mandated and entrusted Nile Basin Initiative /Nile Equatorial lakes Subsidiary Action Program Coordination Unit (NBI/NELSAP CU) to coordinate the implementation of the project. The Nile Basin Trust Fund (NBTF) financed the Feasibility and Design Studies to a tune of USD 7.72 million. The studies were carried out from 2005 and completed in 2013. The studies were undertaken by NBI/NELSAP CU. The Project was approved by the World Bank in 2014; procurement of CP1 Contractor and CP2 Contractor was started in 2015 and completed and Contracts signed on 9th November, 2016; mobilization for construction works started in December 2016/January 2017; and the project completion date is 2021.
Cameroon, Democratic Republic of Congo, Gabon, Republic of CongoCentral Africapap1
The project includes the construction of a road and rail bridge between Brazzaville in Congo and Kinshasa in the DRC. The project also includes road and rail links in both countries as well as joint border control points (One Stop Border Posts). A border control post will be located at each end of the bridge and will house border control officers. Inspections will only be conducted on one side of the river (i.e. on the departure side). The existing road infrastructure will be extended by 10km to connect the bridge to the two cities.
The railway bridge will have a total length of 1 575m and 10 bays divided as follows: 2 bays of 120m, 4 bays of 152m, 2 bays of 242m and two bays of 121.5m. The profile on the other side of the road consists of two unidirectional sidewalks with two lanes of 3m. The total width of the road, including sidewalks, is 16.24 m.
The two large cable-stayed spans (242m and 152m), located in the river along the banks, give the bridge a gateway to the capitals. The bridge will be located in Maloukou Trechot, 6km from the city of Maluku in Congo. The site is 55km from the two capitals along the river.
The bridge is part of a larger project, the Kinshasa-Ilebo railway project, which aims to improve the rail network in Africa. The larger project is expected to contribute to increased regional trade and accelerate regional integration between Central and Southern Africa. The project is expected to allow for cheaper and faster river crossing by passengers and freight. The beneficiaries of the project will therefore include the two countries whose fisci will benefit from increased trade, the increased presence of domestic and foreign companies in both countries, from private transporters and the economic and social benefits of liberated movement of both populations
Angola, Democratic Republic of Congo, ZambiaCentral Africa, Southern Africapap1
The Lobito Corridor Railway Rehabilitation Project involves the comprehensive rehabilitation and modernization of the 1,344 km Benguela Railway (CFB) from the deep-water port of Lobito in Angola to the border town of Luau, which connects to the Democratic Republic of the Congo (DRC) rail network. The project scope includes the complete reconstruction of the railway line, replacement of sleepers and rails, rehabilitation of 67 stations, modernization of signaling and telecommunications systems, procurement of new locomotives and rolling stock, and the reconstruction of 35 major bridges. The corridor is a critical link for exporting copper, cobalt, and other minerals from the DRC's Katanga Province and Zambia's Copperbelt region to global markets via the Atlantic Ocean. The project is implemented by the Lobito Atlantic Railway Consortium, a partnership formed by Trafigura, Mota-Engil, and Vecturis, under a 30-year concession agreement with the governments of Angola, DRC, and Zambia. The concession was formally signed in July 2022. The project is part of the broader Lobito Corridor initiative, which includes complementary port and road infrastructure.
This project entails the upgrading of the Mombasa -Voi road to a dual carriageway. An alternative short term solution is to rehabilitate the road and provide climbing lanes along sections where heavy vehicles reach crawl speed as a result of steep gradients.
The proposed Sambangalou dam project entails the construction of a gravity dam, with a 128 MW capacity, and a 3.8 km3 reservoir. The dam is located in Senegal, 930 km upstream from the mouth of the Gambia river and about 25 km south of Kédougou. The reservoir overlaps Senegal and Guinea. The project now has two components, i.e. Sambangalou Dam and an interconnection transmission line which will link the Sambangalou and Kaleta dams to the electric grid of the four member countries.
The project was formerly part of larger OMVG Energy project involving fuoir countries (with Kaleta dam in Guinea and interconnecting power grid), however it split in 2011 after Guinea decided to develop Kaleta dam as a standalone.
The Ntem River Bridge is intended to close a major missing link between Cameroon and Equatorial Guinea on the Kribi-Campo-Bata road corridor. It will support a continuous regional route connecting Cameroon, Equatorial Guinea and Gabon and improve access to ports, border areas and national road networks.
The approved technical scope consists of a 972 m prestressed-concrete box-girder bridge constructed by successive cantilevers. It includes a two-way seven-metre carriageway, cycle tracks and pedestrian walkways, approximately 933 m of approach road towards Campo in Cameroon and 600 m towards Rio Campo in Equatorial Guinea, as well as environmental and social measures.
Cameroon and Equatorial Guinea are the project-location countries, while Gabon is a beneficiary through the wider Yaoundé-Bata-Libreville economic corridor. ECCAS is the regional institution responsible for corridor coordination.
The PAP II estimate is USD 447.3 million excluding taxes and customs duties but including physical and financial contingencies. This value represents the complete approved project, not merely a study or one national access-road component.
AfDB approved the regional transport and trade-facilitation project in 2023 and provided financing through sovereign operations involving the participating states. Approval of finance supports S3B, but it does not by itself prove that procurement or physical construction has begun. Official project reporting reviewed through 2025 continued to show the operation as active.
EnergyBIP_EAPP_001Ethiopia-Sudan Power System Interconnection Project (Assosa-New Raback, New Jabel Awelya)
Ethiopia, South Sudan, SudanNorth-Eastern AfricaEAPP
The Ethiopia-Sudan Power System Interconnection Project (Grand Renaissance-New Rabak, New Jabel Awelya) connects power generated by Ethiopia's Grand Ethiopian Renaissance Dam (GERD), via Assosa, to new substations at Rabak and Jebel Aulia near Khartoum in Sudan.
The Ethiopia-Sudan Power System Interconnection Project involves constructing a 590 km, 500 kV high-voltage transmission line linking Ethiopia's Grand Renaissance Dam (GERD) with Sudan's power grid, terminating at new substations in Rabak and Jebel Aulia near Khartoum. This interconnector is designed to facilitate the export of clean hydropower from Ethiopia's GERD, with a generation capacity of 5,150 MW, to Sudan, enabling Sudan to reduce reliance on thermal power and lower greenhouse gas emissions. The project includes upgrading substations at GERD, Rabak, and Jebel Aulia, and aims to improve power supply reliability and meet peak demand variability between the two countries. It is a key component of the Eastern Nile Power System and the continental PIDA program, promoting.
Kenya, South SudanEast Africa, North-Eastern AfricaIGAD
Construction of 365 km Juba-Torit-Kapoeta-Nadapal single cariageway road in South Sudan. The road links with the proposed South Sudan/Kenya OSBP project at Nadapal.
Le projet de route Ketta-Djoum consiste en sa deuxième phase au bitumage de la section Sembe (Congo)-Mintom (Cameroun). Les travaux concernent les tronçons Sembe-Souanké-Ntam(143km) au Congo et Mintom-Lele-Ntam(90km) au Cameroun, les études et les appuis institutionnels au secteur des transports, l'appui A la facilitation du transport et du commerce, et le soutien A la biodiversité.
EnergyE.30.17Development of the BAC and LOTEMO Hydroelectric Sites on the Lobaye River, and Related Works in CAR
Central African Republic, Chad, Democratic Republic of Congo, Republic of CongoCentral Africa2020
BAC and LOTEMO have similar hydrological and topographical conditions in a narrow rocky valley of the Lobaye River. Each run-of-river site will use a concrete overflow dam with a powerhouse at the toe of the dam, four 6 MW Kaplan turbine units, 24 MW installed capacity, 16 MW firm capacity in the low-flow period and an equipment flow of 300 cubic metres per second. The programme also includes associated electricity transmission lines.
Development of the two sites requires updated hydrological and geological investigation, engineering design, environmental and social assessment, transmission-route studies and agreement on cross-border power supply. The two 24 MW run-of-river plants would provide firm generation during low-flow periods and reinforce a power system with limited existing generation and transmission capacity. The associated lines are central to the project's regional rationale and must be included in technical, environmental, economic and financial assessment. AfDB regional-acceleration material continues to treat BAC and LOTEMO as a preparation-stage priority rather than a commissioned asset.
WaterBIP_ENTRO_019Integrated Watershed Management in Priority Catchments (Ribb, Gumera and Jema Watersheds)
EthiopiaNorth-Eastern AfricaENTRO
The Integrated Watershed Management in the Ribb, Gumera and Jema Watersheds project is one of the four fast track projects prepared in 2007 under the Eastern Nile Watershed Management (ENWM) Project. The project was prepared as an integral part of Tana-Beles Watershed Management Project. The project area was comprised of five micro-watersheds/development clusters totaling 80,600 ha in area and split roughly equally between the Ribb, Gumera and Jema watersheds, each of which drains into Lake Tana.
The project objective was to improve the livelihoods of rural households living in the upper catchments of Ribb, Gumera and Jema Watersheds in Ethiopia through enhanced productivity and promotion of sustainable land use practices. The project was structured along three mutually supportive themes, namely (a) theme A on livelihoods, which had four components directed at improving livelihoods through better communications, increased productivity and enhanced income generation; (b) theme B on natural resources, which had two main components covering soil and water management and forestry and agro-forestry measures aimed at creating a sustainable landscape that limits erosion and creates a more productive basis for livelihood generation; and (c) theme C on capacity building and project management that addresses the immediate constraints in capacity to implement the project and sustain the outcomes through more robust community and government institutions.
Specific interventions under the project included upgrading rural feeder roads; establishing micro-finance schemes; improving water supply and sanitation systems; improving facilities at health posts and primary schools; demonstration of improved cropping practices (such as alley cropping, intercropping, strip cropping, cover cropping, etc), improved seed and fertilizer use; integrated pest management; controlled ploughing; stabilization of terraces and gullies with trees and shrubs; cultivation of pasture grasses and leguminous hedgerows for fodder production; establishment of animal health posts; development of dairy processing and animal fattening programmes; classification of land base on slope and introduction of appropriate soil and water conservation measures such as land closure, bench terracing, stone bunds, earth bunds, contour bunds and check dams; promotion of rainwater harvesting; promotion of small scale irrigation; establishment of tree nurseries and planting of private and community woodlots.
WaterBIP_NELSAP_012Gogo Falls Water resources development (MPP)
KenyaEast Africa
This Project is located in Western
Kenya. The dam is intended to provide flood controls,
irrigation development and hydropower generation. The project includes a 155
Mm3 dam, 20MW electricity, 30,000ha of irrigation, up to 86,400m3 /d water
supply, benefitting 1.152m people. Detailed feasibility and design studies have
been done for this project and it now requires implementation, estimated at USD
393.7m over 3 years, which has been included in NEL-IP.
TransportExport coal expansion to 81mtpa (South Africa)
The project incorporates a combination of capital expenditure and operational optimisation initiatives to increase the capacity of the overall export coal system to 81mtpa. These projects include:
- Major upgrades to the power supply and overhead traction equipment
- Running line upgrades
- Matlabas loop extension
- Rolling stock yards"
EnergyE.30.01Masaka - Mwanza Transmission Line Project
Tanzania, UgandaEast Africa2020
The approved project comprises a 98 km transmission line operating at 220 kV. It was identified as a least-cost transmission investment in the Tanzania Power System Master Plan and the East African Community Power System Master Plan. The line will connect the Ugandan and Tanzanian grids around the Lake Victoria zone and provide regional transmission capacity for electricity exchange.
Verified implementation and technical context: The World Bank's current project design places the Ugandan investment within the Regional Energy Transmission, Trade and Decarbonization for Eastern Africa (RETRADE-EA) programme. It includes the 260 km Wobulenzi-Masaka-Mutukula line, extension of the Wobulenzi substation, a new Masaka substation, environmental and social mitigation, livelihood restoration, project-management support and institutional strengthening for integrated-system operation and regional power trade. UETCL is responsible for the Ugandan package, while TANESCO is responsible for the corresponding Tanzanian investments under intergovernmental and inter-utility coordination arrangements. Note: Because the current 400 kV configuration differs from the original 98 km, 220 kV original submission, the database preserves the baseline while clearly recording that the implementation programme has been technically reconfigured.
Widening of the road from 6m to 7m with a paved shoulder to harmonise with EAC standard. The Muyinga-Gitega road is about 104 km on the RN12. This road forms part of the shortest route to the port of Dar es Salaam and carries 60% of international traffic with Burundi.
La réalisation du projet se fera en deux phases suivant le financement actuel.Il comprend des travaux routiers, des mesures de facilitation de transport et d'autres activités connexes de développement. La phase1 comprend le bitumage de 144 km (Ndende-Doussala) au Gabon et 93 km (Dolisie-Kibangu) au Congo, la réhabilitation de 130 km (Kibangu-Ngongo-frontière du Gabon) et la mise en oeuvre des mesures de facilitation de transport.
La phase 2 comprendra le bitumage des tronçons restants entre Kibangu et Ngongo,l'aménagement de la voie de contournement de la ville de pointe noire,l'aménagement des ports secs de Dolisie(Congo) et de Ndende(Gabon) et la mise en oeuvre des mesures de facilitation de transport.
Angola, Democratic Republic of Congo, ZambiaCentral Africa, Southern Africapap1
The project involves the extension of Chingola - Solwezi Railway to the border with Angola at Jimbe, to service new mines in the Copperbelt region. Angola has already commenced construction from Luena on the Lobito Corridor towards Jimbe which lies on the Angola- Zambia border. This project will see full rail service on the Lobito Corridor.
EnergyE.30.13Egypt and Libya Regional Electrical Interconnection as the First Stage of Completion of the Regional Electrical Interconnection of the North African Region
Egypt, LibyaNorth Africa2020
The project comprises an alternating-current transmission line of about 165 km between Saloum and Tobruk. It will connect the Egyptian 500 kV system with the Libyan 400 kV system through a 500/400 kV back-to-back converter station rated at 1,000 MW.
Verified implementation and technical context: The project is intended to reinforce and expand an established cross-border electricity relationship. The proposed Saloum-Tobruk facilities would use a back-to-back converter to connect national systems with different operating characteristics and substantially increase exchange capacity. The investment requires updated joint system studies, confirmation of the preferred technical configuration, coordinated network reinforcements, a cross-border operating and commercial code, environmental and social preparation and an agreed allocation of costs and benefits.
TransportBIP_LVBC_001Akagera River Transport Project
Rwanda, Tanzania, UgandaEast Africa2024-01-NRBIP
The Project aims to develop inland water transport infrastructure and services along the Akagera River to improve regional connectivity between Rwanda, Tanzania, and Uganda. The project involves river navigation improvements, construction of port facilities, acquisition of suitable vessels, and establishment of a sustainable operational framework. This environmentally friendly transport alternative will connect Lake Victoria to regions along the Akagera River, providing cost-effective transportation for both passengers and freight while reducing pressure on road infrastructure.
The project will employ appropriate river transport technologies suited to the specific conditions of the Akagera River, which has varying depths and flow conditions across seasons.
Key design elements include:
- Shallow-draft vessels,
- Modular port facilities adaptable to water level variations,
- Environmentally sensitive river training works where necessary.
- Solar power systems for port facilities;
- Navigation aids and communication systems compliant with inland waterway standards;
- Digital booking and cargo management systems;
- Safety and emergency response equipment
The project is intended to create an inland-water transport connection from Lake Victoria through the Kagera/Akagera River to Kagitumba in eastern Rwanda. Its approximately 260 km scope may require river training, dredging, bank protection, cut-offs, navigation structures and inland-port development.
The project would provide Rwanda with direct water access to Lake Victoria and connect regional cargo and passenger movements to existing lake ports and onward road and rail corridors. Technical preparation must address seasonal flows, sedimentation, protected ecosystems, hydraulic structures, navigation safety and harmonised cross-border regulation.
The project reports a three-stage project cost of USD 298,082,400. The previously stored USD 815 million total is not supported as a like-for-like PAP II baseline by the uploaded validation documents. The active record is therefore corrected to USD 298.0824 million and classified as CAPEX because no separate preparation or operating-cost split is given.
The older feasibility work and continuing regional recognition support retaining S2B rather than downgrading the project solely because recent public evidence is limited.
WaterW.05.01Koukoutamba (ex-Gourbassy) Multi-purpose Dam
Mali, SenegalWest Africapap1
The project involves the construction of the Koukoutamba multi-purpose dam (previously known as Gourbassy dam) between Mali and Senegal.
A feasibility study and preliminary design for the Gourbassy Dam was completed by SNC LAVALIN International in 2012 for the OMVS Secretariat (Haut Commissariat de l"’OMVS), with funding from the World Bank under the project PGIRE 1. The main summary report is dated July 2012.
Since then, some (rather modest) progress has been made on further project preparation and mobilisation of finance. Activities that have been undertaken include: preparation of terms of reference for detailed design studies and tender documents. The preparation of studies to assess the cost of building the dam; and development of plans to mobilise finance, including planning for a donor round table and sending out funding requests to potential partners has been done.
TransportT.11.09Walvis Bay Port New Container Terminal
NamibiaSouthern Africapap1
Strategically located half-way down the coast of Namibia, with direct access to principal shipping routes, Walvis Bay is a natural gateway for international trade. Walvis Bay is Namibia's largest commercial port, receiving approximately 3,000 vessel calls each year and handling about 5 million tonnes of cargo. In order to deal with even higher levels of throughput, cargo-handling facilities have been improved, and Namibia Port Authority (Namport) remains committed to infrastructure development, in line with Namport's Mission to provide efficient and effective port and related services.
The project will expand the Port of Walvis Bay"’s container handling as well as bulk handling capacity ahead of demand by the construction of a 30 hectare large new modern container terminal on reclaimed land with 600m of quay wall length designed for a water depth of 16.5m alongside but dredged to 14.0m initially. In so doing the current container terminal will be converted back to a multipurpose terminal capable of handling more bulk and break bulk cargo.
The project is intended to provide a paved regional road from El Fasher through Kabkabiya and El Geneina to Adri at the Chad border. It covers about 328 km of new construction and 21 km of upgrading, giving an overall planned length of approximately 349 km.
The road would improve access across Darfur, strengthen Sudan-Chad connectivity, reduce travel costs and isolation and support trade, humanitarian access and regional integration.
The PAP II financial baseline is USD 262.4 million in CAPEX.
The project remains active in the PAP II portfolio, but the current conflict and institutional environment in Darfur mean that anticipated schedules or general road activity cannot be treated as progress on this specific corridor. No construction-stage claim is made.
The Jita sub-basin measures 2,915 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin partially covers five Woredas in the South Gonder and North Wollo Zones of Amhara Regional State. The sub-basin is characterized by high elevations (2,500 â€" 3000 m amsl in most parts; down to 1,200 m in the lowest part), steep slopes, high rainfall intensity that generates considerable runoff, intensive cultivation, overgrazing and deforestation. These characteristics, and the use of inefficient traditional farming methods and growing human population on naturel resources lead to soil erosion, soil fertility decline, water scarcity and deepening poverty.
The objectives of the Jita project are fourfold, to: (a) improve natural resources management through sustainable land management practices; (b) improve agricultural productivity by introducing improved crop and livestock technologies; (c) enhance Institutional capacity through various capacity building activities; and (d) diversify the livelihoods of local communities with a focus on women and youth by introducing different off-farm activities. The project as three components on sustainable land management, livelihoods support, and institution capacity building.
The project was identified in 2007 under the Cooperative Regional Assessment (CRA) of the Eastern Nile Watershed Management Project (ENWM), which was itself part of the Integrated Development of the Eastern Nile. Full feasibility and project preparation studies were completed in 2012 under the Project Delineation and Prioritization study supported under the NBI Institutional Strengthening Project (ISP). Both phases of the studies were funded by the Nile Basin Trust Fund.Â
EnergyE.09.03.01Egypt - Libya section of ELTAM Transmission Interconnector (Egypt part)
Egypt, LibyaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Egypt part of the 340 km / 500 kV Egypt to Libya section from the Mersa Matruh to the Libya border.
EnergyE.30.18WAPP Regional Solar Power Park Project in Mali
MaliWest Africa2020
The project is part of the ECOWAS Master Plan's renewable-energy subprogramme for an integrated and efficient West African electricity system. It will develop a scalable, multiphase and multi-site solar power park in Mali with a potential capacity of 150 MW. The selected sites are Fana, Bougouni and Sanankoroba around Bamako.
Verified implementation and technical context: The project is intended to aggregate solar development into a regional-scale investment connected to the West African Power Pool rather than treat each site as an unrelated national plant. Preparation must confirm solar resource, land, grid connection, transmission capacity, environmental and social requirements, commercial structure, phased capacity and the relationship among the Fana, Bougouni and Sanankoroba sites. Desert-to-Power reporting confirms that regional on-grid and off-grid solar programmes are being advanced through pre-feasibility work. Construction or financing of a separate solar facility at one location must not automatically be reported as implementation of the full PP2 regional park.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga via Dodoma and Singida. The design capacity of this section is 2000MW.
Construction of a transmission linethat connects the power networks ofTanzania and Kenya. This projectincludes the section of 414km of400kV transmission line from Singidato Namanga via Arusha. The designcapacity is 2,000MW.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project initially included the section of 400kV, 1134km bidirectional Tanzanian section of the 2,800km ZTK interconnector from Kasama in Zambia to Tunduma-Mbeya-Iringa-Singida-Arusha in Tanzania terminating at Isinya in Kenya. The design capacity of the Tanzania section is 2000MW. The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV.
The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.
The project will construct a set of 330 kV transmission links across Zimbabwe, Zambia, Botswana and Namibia. The principal sections are the Hwange-Livingstone/Mukuni connection between Zimbabwe and Zambia, the Victoria Falls-Pandamatenga connection between Zimbabwe and Botswana, and the Mukuni-Zambezi connection between Zambia and Namibia. Together, the facilities will interconnect the four countries and provide an additional regional transmission route within the Southern African Power Pool.
Verified implementation and technical context: The current preparation package is intended to bring the earlier studies up to date, confirm the preferred technical configuration, reassess environmental and social impacts and define a bankable delivery and financing structure. ZIZABONA must be treated as a coordinated regional system rather than as a single national line: each section, substation and utility has its own preparation and procurement requirements, but the intended benefits depend on the complete alternative north-south wheeling path becoming operational. Progress on one national package therefore cannot be reported as completion of the entire interconnector.
The Anger Irrigation Project is a major multi-purpose water resources development project in Ethiopia, located on the Anger River, a tributary of the Didessa River in the Blue Nile Basin. The project's core component is the construction of the Anger Dam, a concrete-faced rockfill dam (CFRD) with a height of 80 meters and a crest length of 1.3 km. The dam will create a reservoir with a significant storage capacity to regulate water flow. The irrigation component aims to develop 14,450 hectares of land through a network of main canals, secondary canals, tertiary canals, and on-farm irrigation systems. The project also includes a hydropower component with an installed capacity of up to 200 MW, flood protection measures, and cross-drainage structures. It is part of the broader Eastern Nile Irrigation and Drainage Projects (ENIDP) portfolio. Environmental and Social Impact Assessments (ESIAs) and Resettlement Action Plans (RAPs) are integral components to address potential impacts.
TransportT.08.04.01Dar es Salaam Port Modernisation
TanzaniaEast Africapap1
The project involves the modernisation of the Dar es Salaam Port, including upgrade to berths 1 to 7, deepening of the harbour, improveing cargo handling and port layout.
WaterBIP_NELSAP_011Borenga Dam and Mara Valley Multipurpose Water Resources Development Project
TanzaniaEast Africa
The
Mara River Basin Project contributes to improved living conditions of the basin
communities by creating an enabling environment for sustainable
development-oriented investments and building capacity of riparian staff and
communities in integrated water resources management and development. The
project is preparing several investment proposals in the fields of water
infrastructure, watershed management and irrigation infrastructure for
subsequent funding within a consistent basin development strategy. This
primarily irrigation project includes the Borenga Dam, will benefit 100,000
people, irrigate 8,340Ha in 13 villages of Serengeti and Butiama Districts,
2.85MW hydropower, water supply to 18 villages in Serengeti, Butiama and Tarime
Districts in Tanzania.
TransportT.06.03.01.01Serenje - Nakonde Road Link 1 (Serenje - Mpika)
Botswana, Malawi, Namibia, Republic of Congo, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province covering a total distance of 611.5 km. The road is divided in 3 links: Link 1: Serenje to Mpika (238.3 km), Link 2: Mpika to Chinsali (164.6 k), Link 3: Chinsali to Nakonde (208.6 km) The Serenje-Nakonde road is part of the Regional Trunk Road Network (RTRN Link 15) as well as the Trans-African Highway Nr 4.
TransportT.11.04Beira New Coal Terminal Development
MozambiqueSouthern Africapap1
The project involves the construction of a new coal terminal at Beira port. A 50 ha site has been set aside for this purpsoe. The terminal is intended to process export coal mined by Brazilian group Vale and Anglo-Australian group Rio Tinto.
WaterBIP_NELSAP_017Ruvyironza Multipurpose Water Resources Development Project
BurundiEast Africa2024-01-NRBIP
The Ruvyironza Multipurpose Water Resources Development Project (PIDA Code: BIP_NELSAP_017) is a major infrastructure initiative in Burundi. The project's core component is the construction of a multipurpose dam on the Ruvyironza River, a tributary of the Kagera River. The primary purposes are irrigation, hydropower generation, and water supply. The dam is expected to create a reservoir with a surface area of approximately 11 square kilometers, inundating about 11 km of the Gitega-Ngozi highway, the Kibaya Bridge, and the Kibaya river gauge. The project scope includes: 1) Development of 14,674 hectares of irrigated agriculture across five provinces (Cankuzo, Gitega, Karuzi, Muyinga, Ruyigi); 2) Installation of a 22 MW hydropower plant; 3) Provision of water for municipal and livestock supply, and aquaculture; 4) Catchment restoration activities upstream of the dam (covering a 1,999 km2 area) to address land degradation. The project preparation phase, managed by the Nile Equatorial Lakes Subsidiary Action Program (NELSAP), includes comprehensive feasibility studies, detailed design, Environmental and Social Impact Assessment (ESIA), Resettlement Action Plan (RAP), and tender document preparation.
Angola, Democratic Republic of CongoCentral Africa, Southern Africapap1
The project is part of the Inga-Cabinda-Pointe Noire transmission interconnector, linking the power systems of DRC, Angola and Congo, with a transfer capacity of 600 MW. The project involves the construction of a section in DRC from Inga to the border with Angola.
WaterKabuyanda Multipurpose Water Resources Development Project
UgandaEast Africa
The Kabuyanda Water Resources Development Project,
renamed Kabuyanda Irrigation Scheme, is located in Isingiro and Ntungamo
Districts in south-western Uganda. The project area is characterized by
fluctuating rainfall and with up to four months of little to no rainfall. The
proposed project consists of a dam (Kabuyanda dam) and an irrigation scheme.
The dam is a 33 m high earth-fill dam on the Mishumba River with a 8.8 MCM
reservoir and 90 km2 drainage area. The dam will be located approximately 5 km
north-west of Kabuyanda Town, and will submerge an area of 100 ha within the
Rwoho Central Forest Reserve (CFR). The irrigation area served by the dam is
expected to cover 3,300 ha.Funded under the World Bank-funded Irrigation for
Climate Resilience Project (ICRP). In 2019, the design of the original project
was revised to simplify management and reduce the project costs, and the ESIA
and RAP (including all required documentation like the Integrated Pest
Management Plan (IPMP) and Dam Safety Management Plan (DSMP)) were accordingly
revised and updated. Dam utilization options were also re-assessed and the
option of irrigation development alone, which excludes hydropower, domestic
uses and livestock uses, was recommended and selected for implementation.
WaterBIP_NELSAP_003Multinational Lakes Edward and Albert Integrated Basin Management and Investment Project (LEAF III)
Democratic Republic of Congo, UgandaCentral Africa, East Africa2024-01-NRBIP
The Lakes Edward and Albert Basin supports over 14 million people who depend on fisheries, agriculture, transport, and diverse ecosystem services. The basin faces severe pressures from population pressures, poverty, limited social services and infrastructure, and unsustainable resource use. LEAF I and II made progress, but basin-wide challenges—including overfishing, declining biodiversity, catchment degradation, water-quality deterioration, climate impacts, and institutional weaknesses—remain significant.
The Project Development Objective is to ensure the sustainable management, development, and utilization of fisheries and water resources in the basin, enhancing biodiversity, economic growth, and community livelihoods. There are five components:
(i) Fisheries Resources Management and Development—strengthening monitoring, rebuilding stocks, aquaculture, improving landing-sites, and alternative livelihoods.
(ii) Integrated Water Resources Management—expanding monitoring networks, implementing catchment plans, improving pollution control, and access to safe water and sanitation;
(iii) Navigation and Maritime Safety to enhance safe, efficient water transport.
(iv) Control of Invasive Aquatic Weeds—coordinated surveillance, prevention, and management of invasive species.
(v) Project Coordination and Management— operationalization of an effective permanent transboundary basin institution--strengthened cooperation for shared benefits
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The proposed 330 kV line is approximately 300 km long (177 km in CA´te d’Ivoire and 119 in Ghana) and involves a the construction of a transmission line, construction of a new substation at Akoupe-Zeudji in the North East of Abidjan in CA´te d’Ivoire and the construction of a new substation '"’Dunkwa"’"’ 2 at Dunkwa-on-Offin in Ghana.
The Kayanza- Bugarama road is about 59 km on the RN1. It originates from Bugarama and terminates in Kayanza City. This road forms part of the trade route with Rwanda.
WaterBIP_NELSAP_015Ngono MPP Water Resources Development Project (MPP)
TanzaniaEast Africa
The Ngono Valley project
(located in the western shores of Lake Victoria and shared by the Districts
of Bukoba Rural and Missenyi) will develop a multipurpose reservoir, net
irrigated agriculture of approximately 5,825 ha, generation of hydropower, as
well as contribute towards sustainable land management of endangered
sub-catchments in the Ngono River Basin. The proposed projects are part of
the investment projects advanced by Tanzania to the NELSAP for projects
preparation and which were prioritized through the NEL Multi-Sector
Investment Opportunity Analysis. The project has been phased into two stages
as follows: The project includes command areas and a canal for small scale
farmers (stage 1), followed by stage 2 which includes a 17m high, 268 MCM
Dam, Hydropower plant with installed capacity 1.65MW, mean annual energy
production 8.7GWh, irrigation command areas for small- and large-scale
farming and will have 100,000 beneficiaries including water supply to 23
villages in Missenyi and Bukoba Districts on the western shores of Lake
Victoria, Tanzania. Feasibility studies, detailed design, ESIA have been
done, and the project is now seeking implementation funding of USD 243m.
TransportT.08.03.16Nyahua-Chaya, Urambo-Kaliua, Kazirambwa-Chagu and Malagarasi-Uvinza Roads
TanzaniaEast Africapap1
The project involves upgrading of missing links along part of the Central Corridor of Manyoni-Itigi-Tabora-Urambo-Kaliua-Kigoma: Nyahua to Chaya (90km), Urambo to Kaliua (33km), Kazirambwa to Chagu (40km) and Malagarasi to Uvinza (51km) from gravel to paved.
The Noumbiel project is a transboundary multipurpose dam proposed on the Mouhoun, close to the confluence with the Koulbi and the Burkina Faso-Ghana border. The approved PAP II submission describes a dam of about 40 metres, an indicative reservoir volume of 11.3 cubic kilometres, installed generation of approximately 62.4 MW, annual production of about 303 GWh and irrigation potential in Burkina Faso and Ghana. The project is intended to serve the directly affected countries while generating wider benefits across the Volta Basin.
TransportT.06.03.01.03Serenje - Nakonde Road Link 3 (Chinsali - Nakonde)
Botswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province covering a total distance of 611.5 km. The road is divided in 3 links: Link 1: Serenje to Mpika (238.3 km), Link 2: Mpika to Chinsali (164.6 k), Link 3: Chinsali to Nakonde (208.6 km) The Serenje-Nakonde road is part of the Regional Trunk Road Network (RTRN Link 15) as well as the Trans-African Highway Nr 4.
Democratic Republic of Congo, UgandaCentral Africa, East Africa2024-01-NRBIP
The Uganda (Nkenda) - DR Congo (Beni-Butembo-Bunia-Mabuki) Power Transmission Inter-Connection Project is a strategic regional infrastructure initiative aimed at constructing a 400 kV double-circuit high voltage transmission line spanning 352.2 km, linking Nkenda substation in Kasese, Western Uganda, to new substations at Beni, Butembo, Bunia and Mabuki in the North Eastern region of the Democratic Republic of Congo (DRC).
The project includes upgrading the Nkenda substation and aims to integrate the isolated and eastern DRC power grid with Uganda's national grid, thereby enhancing electricity reliability, security, and access in the region.
It supports optimal utilization of generation resources, promotes regional power trade, and facilitates least-cost power expansion projects, contributing to socio-economic development and environmental sustainability.
Sponsored by the Nile Basin Initiative/Nile Equatorial Lakes Subsidiary Action Program (NBI/NELSAP), Uganda Electricity Transmission Company Limited (UETCL), and Société Nationale d'Électricité (SNEL), the project is aligned with the East African Power Pool (EAPP) Master Plan to create a regional power highway which aims to maximise the affordable availability of electricity around the region. Increasing power trade is key to this aspiration.
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km ZTK interconnector from Kabwe-Pensulo-Nakonde-Kasama in Zambia to Tunduma in Tanzania. The project was envisioned to be implemented in two phases starting with the Kabwe-Pensulo-Kasama-Nakonde section and the second phase would have comprised the Kabwe-Pensulo-Mpika-Kasama section. It will have had a capacity of 500MW, upgradable to 2000MW depending on power demand.
The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV. The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.
EnergyE.09.01.01Algeria - Tunisia section of ELTAM Transmission Interconnector (Algeria part)
Algeria, TunisiaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Algeria part of the 220 km / 400 kV Algeria to Tunisia section from Cheffia in Algeria to the Tunisia border.
TransportT.06.03.03.08Harare - Beitbridge Road Link 4 (Turn Off to Beitbridge Border Post)
ZimbabweSouthern Africapap1
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 25). This section covers 184 km from Turn Off to Beitbridge Border Post.
EnergyE.30.07Integration of Electrical Networks between Inga-Cabinda and Pointe Noire
Angola, Democratic Republic of Congo, Republic of CongoCentral Africa, Southern Africa2020
The project consists of completing the environmental and social impact assessment, updating the tender documents and carrying out the transmission works required to connect Inga, Cabinda and Pointe-Noire. The infrastructure forms part of the wider regional electricity loop serving Inga, Moanda, Boma, Cabinda, Pointe-Noire, Brazzaville and Kinshasa and of a future Central African transmission backbone.
The regional concept is intended to create a stronger coastal and western Central African electricity corridor by connecting the Inga generation area and western DRC with Cabinda and Pointe-Noire and, over time, with other CAPP systems. Project-preparation support has included feasibility and tender-document work, while the CAPP acceleration programme treats the investment as requiring further commercial and financial structuring. Official documents refer to different technical configurations for route length, voltage and transfer capacity. Those versions should be reconciled before the database replaces its approved PP2 technical dimensions.
EnergyBIP_NELSAP_007Nsongezi Hydroelectric Power Station
Rwanda, Tanzania, UgandaEast Africa2024-01-NRBIP
The Nsongezi Hydropower Project is a proposed run-of-river scheme on the Kagera River, located along the border between Uganda and Tanzania. The project is also regionally relevant, with potential power supply benefits to Rwanda.
Although the project features a 20m high concrete dam on the Kagera River, reservoir storage and operation is such that the scheme effectively operates as a run-of-river scheme. The main role of the reservoir is to balance energy production gains with minimized environmental and social impacts.
The hydropower plant will consist of an open-air powerhouse on the Ugandan side of the river, equipped with three vertical Kaplan turbines. Positioned downstream of the Kikagati Power Station, Nsongezi aims to fully utilize the hydropower potential of this 25 km stretch of the Kagera River. Turbine discharge is expected to be in the range of 220-250 m³/s, Power evacuation will be via a 35 km, 132 kV transmission line connecting the plant to Uganda's Mirama Hills substation.
The project is included in Uganda's Second National Development Plan (NDPII) for the 2015/16 - 2019/20 period. It is also included in NELSAP's Investment Strategy Action Plan (2012).
TransportT.09.02.03Sena Railway Line Rehabilitation
MozambiqueSouthern Africapap1
The Sena line runs from Limbe (going through Chiromo where the railway line crosses the Shire River, where the culvert has been washed away and Nsanje) to Marka, the border between Malawi and Mozambique.
EnergyE.09.02.01Libya - Tunisia section of ELTAM Transmission Interconnector (Libya part)
Libya, TunisiaNorth Africapap1
This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Libya part of the 210 km / 400 kV Libya to Tunisia section from Abou Kamach in Libya to the Tunisia border. It has a power transmission capacity of 1000 MW.
EnergyBIP_NELSAP_022Renk - Malakal Power Transmission Line
South Sudan, SudanNorth-Eastern Africa2024-01-NRBIP
The South Sudan (Renk) - South Sudan (Malakal) 220 kV High Voltage Power Transmission Interconnector project is located in the Upper Nile region, connecting the town of Renk in South Sudan border with Sudan to Malakal in South Sudan.
The South Sudan (Renk) - South Sudan (Malakal) 220 kV High Voltage Power Transmission Interconnector project involves the construction of a 220 kV transmission line approximately 320 km long, connecting the town of Renk in Sudan to Malakal in South Sudan.
This interconnection aims to facilitate the import of up to 140 MW of electricity from Sudan to South Sudan, addressing the latter's critical power supply shortages and enhancing regional energy security.
The project includes the development of associated substations and distribution infrastructure in South Sudan's Upper Nile State to improve electricity access and reliability for local communities. It forms part of the Nile Basin Initiative's efforts to promote regional power trade and integration within the Eastern Africa Power Pool framework, supporting socio-economic development and stability in the border regions.
TransportT.06.03.01.02Serenje - Nakonde Road Link 2 (Mpika - Chinsali)
Botswana, Democratic Republic of Congo, Malawi, Namibia, Tanzania, Zambia, ZimbabweCentral Africa, East Africa, Southern Africapap1
The Serenje-Nakonde project road runs in a north eastern direction from Serenje in Zambia's Central Province to Nakonde (at the border post between Zambia and Tanzania) in the Northern Province covering a total distance of 611.5 km. The road is divided in 3 links: Link 1: Serenje to Mpika (238.3 km), Link 2: Mpika to Chinsali (164.6m), Link 3: Chinsali to Nakonde (208.6 km) The Serenje-Nakonde road is part of the Regional Trunk Road Network (RTRN Link 15) as well as the Trans-African Highway Nr 4.
TransportT.RD.26.01Fes-Oujda Motorway Link to the Algerian East-West Motorway
Algeria, MoroccoNorth Africa2020
The project will construct an approximately 24 km dual-carriage motorway from the terminal part of the Fes-Oujda motorway to the Moroccan-Algerian border, where it is intended to connect with Algeria's East-West motorway. It is one of two missing links in the central section of the Trans-Maghreb Motorway Axis; the other is the Bou Salem-Algerian border section in Tunisia.
The link is intended to provide continuity along the wider Agadir-Ras Jedir motorway corridor and improve regional mobility, road safety and trade. The PAP II baseline identifies Morocco as the submitting and implementing state, with wider Trans-Maghreb users benefiting from the connection.
Current UfM reporting still identifies the Oujda-border section as an outstanding missing link and states that design completion and fundraising preparation remain necessary. Construction of other motorway sections in Morocco or Algeria must not be reported as implementation of this specific cross-border link.
WaterW.30.02Angololo Multipurpose Water Resources Development Project
Kenya, UgandaEast Africa2020
The project will construct a dam of about 30 metres on the Malaba River at the Kenya-Uganda border, creating a reservoir of roughly 31 million cubic metres. The scheme is designed to supply potable water to approximately 270,000 people, irrigate about 4,000 hectares, generate 1.3 MW of hydropower, support fisheries and livestock, regulate floods and droughts, and restore the associated upstream watershed. NELSAP-CU of the Nile Basin Initiative has coordinated the joint preparation process for Kenya and Uganda.
WaterBIP_NELSAP_018Angololo Multipurpose Water Resources Development Project (Angololo Dam) NELSAP
Kenya, UgandaEast AfricaIGAD
The Angololo Water Resources Development Project (AWDP) is located on the trans-boundary Malaba River that is between Kenya and Uganda and it falls within the Sio-Malaba Malakisi (SMM) River Basin within the Lake Victoria sub basin. The Angololo project was identified by Kenya and Uganda in collaboration with Nile Equatorial Lakes Subsidiary Action Program (NELSAP) through its Sio Malaba Malakisi (SMM) River Basin Management (RBM) project. NELSAP-CU conducted its prefeasibility studies in 2010 with grant financing from the Royal Government of Sweden and the Royal Government of Norway. Following this identification study, the Governments of Kenya and Uganda formally requested NELSAP to integrate it into its pipeline of natural resources projects for further appraising and development. The project was approved during the 18th Nile Equatorial Lakes Council of Ministers (NELCOM) meeting held in Entebbe, Uganda on 13th October 2015 and was included into the African Development Bank (AfDB) pipeline (IOP) for the year 2016 – 18 to seek possible funding support. NELSAPCU/NBI was mandated in the signed MOU between Uganda and Kenya to support in mobilization of resources for preparation of the investment project. NELSAPCU approached AfDB Eastern Africa Regional Centre (EARC) for funding to undertake preparation studies. The project studies will consist of the following components: • Feasibility Study, Detailed Design and Preparation of Tender Documents; • Independent Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP) • Stakeholder engagements to validate project study outputs. Once proven economically viable, the project studies will proceed to Detailed Designs (DD), and preparation of tender documents.
TransportT.06.03.03.06Harare - Beitbridge Road Link 2 (Chivhu to Masvingo)
ZimbabweSouthern Africapap1
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km.The Harare-Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 25). This section covers 151 km from Chivhu to Masvingo.
The Fincha'a sub-basin measures 4,089 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin is located in Horo Gudru Wellega Zone of Amhara Regional State. The sub-basin is characterized by high elevations (2000 â€" 3200 m amsl in most parts), steep slopes, high rainfall intensity that generates considerable runoff, intensive cultivation, overgrazing and deforestation. These characteristics, and the use of inefficient traditional farming methods and growing human population on naturel resources lead to soil erosion, soil fertility decline, water scarcity and deepening poverty.
The objectives of the Fincha'a project are fourfold, to: (a) improve natural resources management through sustainable land management practices; (b) improve agricultural productivity by introducing improved crop and livestock technologies; (c) enhance Institutional capacity through various capacity building activities; and (d) diversify the livelihoods of local communities with a focus on women and youth by introducing different off-farm activities. The project as three components on sustainable land management, livelihoods support, and institution capacity building.
The project was identified in 2007 under the Cooperative Regional Assessment (CRA) of the Eastern Nile Watershed Management Project (ENWM), which was itself part of the Integrated Development of the Eastern Nile. Full feasibility and project preparation studies were completed in 2012 under the Project Delineation and Prioritization study supported under the NBI Institutional Strengthening Project (ISP). Both phases of the studies were funded by the Nile Basin Trust Fund.Â
Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 400kV, 292km Iringa - Kisada - Mbeya transmission line, 122km of 400kV Mbeya - Tunduma transmission line and 4km of 400kV transmission line from Tunduma to Border of Zambia.Â
TransportT.06.03.03.05Harare - Beitbridge Road Link 1 (Harare to Chivhu)
ZimbabweSouthern Africapap1
The road runs in a southern direction from Harare to Beitbridge Border Post (between Zimbabwe and South Africa), covering a total distance of 571km. The Harare-Beitbridge road is part of the Regional Trunk Road Network (RTRN Link Nr 25). This section covers 141 km from Harare to Chivhu.
This project forms part of the priority projects identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy. The project involves the construction of approximately 350 km of 330 kV transmission line from Tema Swithching Station in Ghana (Volta) over a distance of 140 km to the Ghana /Togo Border (Lome "C") and 98 km of 330 kV line from Lome "C" to the Togo/Benin Border and from there an 110 km 330 kV line to the Sakete Substation in Benin. It also comprises the extension of the 330 kV switching substation in Tema, Ghana, construction of 330/161/20 kV substation in Lome "C", Togo and the extension of the 330 kV substation at Sakete in Benin.
Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project comprises the update of project studies.
The Chemoga-Yeda sub-basin measures 2,738 km2 in area, and is part of the Abbay (Blue Nile) River Basin located in the Central Ethiopian Highlands. The sub-basin is located in Amhara Regional State, East Gojam Regional office. The sub-basin is characterized by high elevations (2000 â€" 3900 m amsl in most parts, down to 890 m in the lowest part), steep slopes, high rainfall intensity that generates considerable runoff, intensive cultivation, overgrazing and deforestation. These characteristics, and the use of inefficient traditional farming methods and growing human population lead to soil erosion, soil fertility decline, water scarcity and deepening poverty.
The objectives of the Chemoga-Yeda project are fourfold, to: (a) improve natural resources management through sustainable land management practices; (b) improve agricultural productivity by introducing improved crop and livestock technologies; (c) enhance Institutional capacity through various capacity building activities; and (d) diversify the livelihoods of local communities with a focus on women and youth by introducing different off-farm activities. The project as three components on sustainable land management, livelihoods support, and institution capacity building.
The project was identified in 2007 under the Cooperative Regional Assessment (CRA) of the Eastern Nile Watershed Management Project (ENWM), which was itself part of the Integrated Development of the Eastern Nile. Full feasibility and project preparation studies were completed in 2012 under the Project Delineation and Prioritization study supported under the NBI Institutional Strengthening Project (ISP). Both phases of the studies were funded by the Nile Basin Trust Fund.Â
ICTI.02.30.02Construction of Amilcar Cabral Submarine Cable System
Algeria, Cabo Verde, Gambia, Guinea, Guinea-Bissau, Liberia, Sierra LeoneNorth Africa, West Africa2020
The Amilcar Cabral Submarine Cable System (ACSCS) is a 3,555 km submarine fibre optic cable project connecting Cabo Verde, The Gambia, Guinea, Guinea-Bissau, Liberia, and Sierra Leone. The system comprises a 2,955 km main trunk and includes four branching units to the mainland countries and two stubs for future expansion to the north and south respectively. It is designed with a minimum capacity of 12 Tbps per fibre pair and a 25-year operational lifespan. The cable will land in Praia, Cabo Verde, and connect to the EllaLink submarine cable system, providing a direct link to Brazil and Europe. The project is a key component of the ECOWAS broadband backbone programme and aims to provide a redundant, high-capacity international gateway for the participating countries, which currently rely predominantly on the Africa Coast to Europe (ACE) submarine cable. The project has been in development since 2018 and is led by a consortium of national operators and public entities from the six participating countries, coordinated by the ECOWAS Project Preparation and Development Unit (PPDU). The full system cost is estimated at USD 91.3 million, with Liberia's portion estimated at USD 14.29 million.
The Amilcar Cabral submarine Cable Project is part of the ECOWAS broadband Backbone infrastructure programme aimed at connecting the island nation of Cabo Verde to its nearest neighbors on the mainland namely Guinea, Guinea-Bissau, Liberia, Sierra Leone and The Gambia.
The project involves the construction of the Kousséré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.
WaterLake Victoria Water and Sanitation Initiative Phase II (LVWATSAN II)
Burundi, Kenya, Rwanda, Tanzania, UgandaEast Africa
This project involved construction
of water supply and sanitation systems, improving solid waste and storm water
management, improving watershed management, improving urban planning and
building capacity of urban authorities in 15 secondary towns in the Lake
Victoria Basin. This project intends to meet the Millennium
Development Goals and support secondary urban centers in the Lake Victoria
Basins to contribute to the reversal of the pollution of the lake through
improvements of sustainable water supply and sanitation infrastructure in 15
secondary towns within the Lake Victoria Basin.
The selected towns were across East Africa
countries with Burundi having 3 towns that included: Ngozi, Muyinga and
Kayanza. In Kenya, Keroka, Kericho and Isebania were among the towns while in
Rwanda, Kayonza, Nyagatare and Nyanza were identified. Tnazania had Geita,
Sengerema and Nansio towns added while Uganda had Mayuge, Buwama-Kayabwe-Bukakata
and Ntungamo. The implementation was launched in 2011 with approx. 110 MUSD
grant funding from the African Water Facility. This component of LVWATSAN was
called LVWATSAN Phase II. Africa Development Bank entered into a Contribution
Agreement with UN-HABITAT to offer Technical Assistance and Capacity Building
Programme. MWAUWASA was delegated to take the role of implementing authority
for the 3 Tanzanian towns; Geita, Sengerema and Nansio, financed by AfDB.
The water supply has been improved for 784,470 residents of beneficiary towns
across the Partner States.
WaterBIP_ENTRO_009Kinyeti River Multi-purpose Water Resources Development Project
South SudanNorth-Eastern AfricaENTRO
Kinyeti River has its origins in the Imatong Mountains close to the South Sudan-Uganda border and from there flows northwards, eventually dispersing into the Badigeru swamp. The proposed project has multiple components including small scale potable water supplies, fisheries management, irrigation, livestock watering and watershed management.
The Kinyeti River multipurpose development project is one of the three short term projects proposed as part of the Baro-Akobo-Sobat multipurpose water resources development study project. The three short term projects are based on the sustainable development of water resources. They aim at providing inter-sectoral benefits and improving people’s livelihoods in the sub-basin. The Kinyeti project is centered around the construction of a multipurpose dam in Eastern Equatoria, South Sudan, upstream of the city of Torit.
The project has been designed to provide the following benefits:
The 45 million m3 reservoir will secure water access for the city of Torit (100,000 inhabitants projected in 2041). It will also support capture fisheries and recreational activities
The regulation of the flow will provide water for the development of irrigation (1,000 ha) and aquaculture (100 ponds of 200 m²) downstream of the dam. It will also provide water for the livestock all year round and satisfy an environmental flow during the dry season. Irrigation and aquaculture will be introduced in this area and there would be room for further expansion of these activities in the future.
A Feasibility studies completed with an estimated investment costs is USD 92 million
Showcase ready! You have a previously generated AI showcase for these projects in this session.
Generate compelling, AI-crafted narratives for your projects. The AID AI Engine will create powerful headlines, impact statements, and strategic context — perfect for presentations, stakeholder meetings, and exhibitions.
Narrative Style
Progress Briefing RECOMMENDED
Answers where it is, where it stands and what has been done — read from the latest progress reports in key points
Executive Briefing
Strategic impact, investment value & regional significance
Storytelling
Vivid narratives about community impact & continental vision
Technical
Engineering achievements, specs & development milestones
Investor Narrative
ROI potential, funding gaps, risk profile & bankability assessment
Tone & Mood
Will generate for 15projects (top by investment value). Estimated time: ~2 min.