Abidjan-Lagos Corridor Highway Development Project

PIDA Code: T.RD.26.03

Project Overview

The Abidjan-Lagos Corridor Highway Development Project will create a six-lane supranational highway linking Abidjan, Accra, Lomé, Cotonou and Lagos through Côte d'Ivoire, Ghana, Togo, Benin and Nigeria. The project also includes a common corridor-management framework, trade and transport facilitation, road-safety systems and a spatial-development programme intended to transform the route into an integrated economic corridor.

The original PAP II submission recorded S2B - Feasibility and an early CAPEX estimate of approximately USD 7 billion. Following completion of feasibility and preliminary design work, current ECOWAS reporting places the investment cost at approximately USD 14.7 billion for the 1,028 km highway. ECOWAS reported validation of feasibility and technical studies in 2025, development of financing models for fifteen concession lots and advancement to the investment stage in 2026. Financing-identification missions and the first ALCoMA board meeting were held in 2026. The project is therefore reported at S3A - Project Structuring.

Description

The project is being implemented in line with the decision of the Presidents of the five countries along the Abidjan-Lagos Corridor in February 2014, to construct a 6-Lane (2x3) dual-carriage Highway from Abidjan in Côte d'Ivoire through Accra, Lome and Cotonou to Lagos in Nigeria. The Abidjan-Lagos Corridor is approximately 1,080 km long, connects some of the largest and most economically dynamic cities in Africa, namely: Abidjan, Accra, Cotonou, Lomé and Lagos and covers a large proportion of West Africa's population. It also links very vibrant seaports which serve all the landlocked countries of the region, being Burkina Faso, Mali and Niger.
In order to ensure a holistic transformation of the transport corridor into an Economic Development Corridor, the Programme has been packaged into several Components as follows:
a. Feasibility Study and Environmental, Social Impacts Assessment (ESIA): This covers Feasibility study - engineering, financial, economic analysis (ii) detailed engineering design; (iii) PPP viability assessment for investment and operations of the corridor; Comprehensive impact assessment on all environment and social implication of the project including resettlement and compensation.
b. Detailed Engineering Design: Detailed engineering design of the safe and effective implementation of the hard infrastructure that is fit for purpose and in compliance with best practice and national requirements.
c. Corridor Spatial Development Study: An analysis of the physical, technical, policy, economic and market aspects of the corridor to develop a realistic, market feasible and implementable corridor investment masterplan, development framework and delivery strategy. The will identify "anchor projects" for the Corridor that naturally lead to upstream and downstream investments with the goal of creating an industrial cluster of new businesses offering increased employment. The anchor project will be in all economic sectors being transport, power, water, telecommunications, Agriculture, Mining etc.
d. Corridor Management Authority Establishment and Operations - Finalize the Legal Framework and Institutional Structure and Establish the Abidjan-Lagos Corridor Management Authority in line with the Project Treaty.
e. Trade and Transport Facilitation - This include a review of the existing trade facilitation related studies and policies in operation along the corridor (ii) develop a harmonized and simplified sub-regional transportation and transit systems and border (one-stop) management. Scope to include ICT connectivity and information sharing between stakeholder platforms such as customs, immigrations and other border agencies at national and regional level; iii) initiate Implementation
f. Technical Assistance Service to ECOWAS and Member States - Comprise capacity support to the ECOWAS and Member State agencies to effectively manage all the above service delivery components on behalf of ECOWAS. This will include: i) consulting and advisory services; ii) procuring office equipment; iii) conduct project visibility (marketing) activities; v) conducting regional workshops, and platforms for multi-lateral coordination activities, e.g. JTC and JSC meetings and study validation workshops
g. Road Safety Audits - A Study on developing operational road safety systems, utilising safe design practices and international standards, to be implemented during the design and operational phase of a project to ensure safety of all road users.
Project Oversight Responsibility

Project Steering Committee:
The Heads of State and Government also established a Steering Committee made up of the Ministers of Works/Roads to provide oversight guidance and the Commissioner for Infrastructure of the ECOWAS Commission. The Nigerian Minister in-charge of Road Works was designated by the Presidents as the Chair of the Steering Committee. At the 6th meeting of the Ministerial Steering Committee, the Ministers designated Cote d'Ivoire as the deputy Chair to the Steering Committee.

Executing Agency
The Heads of State at the outset also designated the ECOWAS Commission to coordinate and facilitate project implementation the project. In this regard, the Commission through its Department of Infrastructure serves as the Executing Agency for the project on behalf of the Corridor Member States, under the supervision of the Commissioner for Infrastructure.

Establishment of Abidjan-Lagos Corridor Management Authority (ALCoMA)
- Study on the Institutional and Legal Framework for the Establishment of the Abidjan-Lagos Corridor Management Authority (ALCoMA) completed
- Intergovernmental Agreement for the Establishment of the Abidjan-Lagos Corridor Management Authority (ALCoMA) completed, validated by Corridor Member States and Signed by the Ministers in-charge of the Corridor project on 19th October, 2018 at Abidjan, Cote d'Ivoire.

Current Status - Contracts commenced in February, 2019 for the Feasibility and Detailed Engineer Design Studies for the entire 1080km.

NOTE:
The Abidjan-Lagos Corridor Highway Development Project (ALCHDP) which was conceived by the Heads of State and Governments of the five countries with a vision of transforming the Corridor into a homogeneous 6-lane supranational economic development corridor highway from Lagos to Abidjan with massive trade and transport facilitation components as well as homogeneous corridor management.

A key component of this project is to develop a 6-lane dual carriage highway with the same standards, norms, dimensions, characteristics and management system. The Presidents of the five corridor countries signed a project specific Treaty which among others created a new Corridor Authority to own, construct, management and operate the Corridor Highway on behalf of the five countries.

The Feasibility & Detailed Design Studies currently underway for the Abidjan-Lagos Corridor Highway Development Project, is as part of technical studies, bench-marking the current status of the corridor (all existing or completed road sections, planned interventions by governments and partners, etc) to come up with a comprehensive design that meets the standards and objectives of a supranational dual carriage highway with a common set of rules, standards and dimensions. Following the spirit of the Treaty, the design will recommend upgrades or improvements for all such completed sections, if necessary, in other to meet the agreed dimensions or standards of the multinational highway.

Objectives

The development objective of the project, when implemented, will generate social and economic activities, promote cross-border trade and integrate the economies within the ECOWAS Community. This will contribute to reducing the poverty levels of the population that depend on the transport modes of the corridor for livelihood. An outcome of this study is therefore to provide stakeholders with the tools and capability to make informed decisions on investment interventions and operating the corridor to meet the expected development objectives. Specifically, the project when implemented, will:
i) Generate social and economic activities, promote cross-border trade and integrate the economies within the ECOWAS Community.
ii) Contribute to reducing the poverty levels of the population that depend on the transport modes of the corridor for livelihood.
iii) Improving the free movement of persons and goods among West African Member States.
iv) reduction of trade and logistics costs between West and Central Africa
v) reduction of corruption and loss of revenue along the corridors

Stakeholders

African Development Bank (AfDB) 4
African Union Development Agency (AUDA - NEPAD) 1
Economic Community of West African States (ECOWAS-CEDEAO) 9

Project Information

Sector: Transport
Sub-Sector: Road
Status: Active
Stage: N/A

Interested in investing?

Contact the AUDA-NEPAD investment desk for project information, documents and an introduction to the sponsor.

Express investment interest

Want Full Access?

Register to view complete project details, financial information, and more.

Get Started