TANZANIA (KYAKA-NYAKANAZI-MABUKI) – UGANDA (MASAKA-MUTUKULA) POWER SYSTEM INTERCONNECTION FEASIBILITY STUDY UPDATE

Project Overview

<p style="text-indent: 0in; line-height: normal; margin: 0pt 0in; text-align: justify; direction: ltr; unicode-bidi: embed; word-break: normal;"><strong style="text-align: start;"><span style="caret-color: #1f2329; color: #1f2329; font-family: 'Malgun Gothic'; font-size: 14.666667px; text-align: justify;">The project has a total transmission line length of 750kms and about 5 substation works.</span></strong><span style="color: #1f2329; font-family: 'Malgun Gothic'; font-size: 11pt; text-indent: 0in;">The first Feasibility study was completed in year 2011. Updated FS is expected to be finalized by in 2024, with a grant given to EAPP by the WB. Interim report is submitted. The ESIA studies in both sides are financed by World Bank from separate projects.</span><span style="color: #1f2329; font-family: 'Malgun Gothic'; font-size: 11pt; text-indent: 0in;"> </span><span style="color: #1f2329; font-family: 'Malgun Gothic'; font-size: 11pt;">The project preparation include assessment of institutional arrangement for</span><span style="color: #1f2329; font-family: 'Malgun Gothic'; font-size: 11pt;"> </span><span style="color: #1f2329; font-family: 'Malgun Gothic'; font-size: 11pt;"> </span><span style="color: #1f2329; font-family: 'Malgun Gothic'; font-size: 11pt;">financing, construction, operation, and maintenance of the interconnection and may propose private ownership.</span></p>
<p style="text-indent: 0in; line-height: normal; margin: 0pt 0in; text-align: justify; direction: ltr; unicode-bidi: embed; word-break: normal;"> </p>

Description

<p><strong><span style="caret-color: #1f2329; color: #1f2329; font-family: 'Malgun Gothic'; font-size: 14.666667px; text-align: justify;"> </span></strong><span style="color: #003399; font-family: Calibri; font-size: 15pt; font-weight: bold; text-align: justify;">Feasibility study update &ndash; determine the demand forecasting, the review of the two countries generation expansion plan, determine possible power exchange and assess the financial and economic viability of the project.</span><span style="color: #003399; font-family: Calibri; font-size: 15pt; font-weight: bold; text-align: justify;"> </span></p>
<p style="margin-top: 6pt; margin-bottom: 0pt; text-align: justify; direction: ltr; unicode-bidi: embed; vertical-align: baseline;"><span style="font-size: 15pt; font-family: Calibri; color: #003399; font-weight: bold;">-Preparation of project conceptual designs, specifications and tender documents. </span></p>
<div class="O1" style="margin-top: 6pt; margin-bottom: 0pt; margin-left: 0.2in; text-indent: -0.31in; text-align: justify; direction: ltr; unicode-bidi: embed; vertical-align: baseline;"><span style="font-size: 15pt;"><span style="font-family: 'Neo Sans Std';">&ndash;</span></span><span style="font-size: 15pt; font-family: Calibri; color: #003399; font-weight: bold;">a desktop assessment of extreme weather events and weather conditions and anticipated impact of climate change in the proposed project areas. </span></div>
<div class="O1" style="margin-top: 6pt; margin-bottom: 0pt; margin-left: 0.2in; text-indent: -0.31in; text-align: justify; direction: ltr; unicode-bidi: embed; vertical-align: baseline;"><span style="font-size: 15pt;"><span style="font-family: 'Neo Sans Std';">&ndash;</span></span><span style="font-size: 15pt; font-family: Calibri; color: #003399; font-weight: bold;">identify the project's vulnerability to climate changes and trends.</span></div>
<div class="O1" style="margin-top: 6pt; margin-bottom: 0pt; margin-left: 0.2in; text-indent: -0.31in; text-align: justify; direction: ltr; unicode-bidi: embed; vertical-align: baseline;"><span style="font-size: 15pt;"><span style="font-family: 'Neo Sans Std';">&ndash;</span></span><span style="font-size: 15pt; font-family: Calibri; color: #003399; font-weight: bold;">propose adaptation and resilience measures to be reflected in the project design, technical specifications, and maintenance and operation guidelines of project infrastructure </span></div>
<div class="O1" style="margin-top: 6pt; margin-bottom: 0pt; margin-left: 0.2in; text-indent: -0.31in; text-align: justify; direction: ltr; unicode-bidi: embed; vertical-align: baseline;"><span style="font-size: 15pt;"><span style="font-family: 'Neo Sans Std';">&ndash;</span></span><span style="font-size: 15pt; font-family: Calibri; color: #003399; font-weight: bold;">identify, classify, assess, and rate the risks involved in the development and operation of the proposed interconnector project and discuss and advise on risk minimization and mitigation measures and risk allocation among the various parties involved in project development, financing, and operations</span></div>
<div class="O1" style="margin-top: 6pt; margin-bottom: 0pt; margin-left: 0.2in; text-indent: -0.31in; text-align: justify; direction: ltr; unicode-bidi: embed; vertical-align: baseline;"><span style="font-size: 15pt;"><span style="font-family: 'Neo Sans Std';">&ndash;</span></span><span style="font-size: 15pt; font-family: Calibri; color: #003399; font-weight: bold;">recommend appropriate organizational, institutional, commercial, and operational frameworks for financing, construction, operation, and maintenance of the interconnection at various levels (intergovernmental; inter-utility; the regional (EAPP) policy, regulatory, and commercial frameworks, etc.)</span></div>
<div class="O1" style="margin-top: 6pt; margin-bottom: 0pt; margin-left: 0.2in; text-indent: -0.31in; text-align: justify; direction: ltr; unicode-bidi: embed; vertical-align: baseline;"><span style="font-size: 15pt;"><span style="font-family: 'Neo Sans Std';">&ndash;</span></span><span style="font-size: 15pt; font-family: Calibri; color: #003399; font-weight: bold;">Recommend procurement strategy and institutional organization, including staffing and outside assistance (owner's engineer, project management specialists, etc.) for implementing the interconnector project</span></div>

Objectives

<p style="text-indent: 0in; line-height: normal; margin: 0pt 0in; text-align: justify; direction: ltr; unicode-bidi: embed; word-break: normal;"><span style="font-size: 11pt; font-family: 'Malgun Gothic'; font-variant-ligatures: normal; font-variant-alternates: normal; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-position: normal; color: #1f2329; letter-spacing: 0pt; vertical-align: baseline;">The project objectives include:</span></p>
<div class="O0" style="line-height: normal; margin: 0pt 0in 0pt 0.31in; text-indent: -0.19in; text-align: justify; direction: ltr; unicode-bidi: embed; word-break: normal;"><span style="font-size: 11pt;"><span style="color: #323842; font-family: Arial;">&bull;</span></span><span style="font-size: 11pt; font-family: 'Malgun Gothic'; font-variant-ligatures: normal; font-variant-alternates: normal; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-position: normal; color: #1f2329; letter-spacing: 0pt; vertical-align: baseline;">Interconnect the Tanzania and Uganda Power systems </span></div>
<div class="O0" style="line-height: normal; margin: 0pt 0in 0pt 0.31in; text-indent: -0.19in; text-align: justify; direction: ltr; unicode-bidi: embed; word-break: normal;"><span style="font-size: 11pt;"><span style="color: #323842; font-family: Arial;">&bull;</span></span><span style="font-size: 11pt; font-family: 'Malgun Gothic'; font-variant-ligatures: normal; font-variant-alternates: normal; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-position: normal; color: #1f2329; letter-spacing: 0pt; vertical-align: baseline;">Reduce the costs of generation </span></div>
<div class="O0" style="line-height: normal; margin: 0pt 0in 0pt 0.31in; text-indent: -0.19in; text-align: justify; direction: ltr; unicode-bidi: embed; word-break: normal;"><span style="font-size: 11pt;"><span style="color: #323842; font-family: Arial;">&bull;</span></span><span style="font-size: 11pt; font-family: 'Malgun Gothic'; font-variant-ligatures: normal; font-variant-alternates: normal; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-position: normal; color: #1f2329; letter-spacing: 0pt; vertical-align: baseline;">Increase the reliability of the two systems</span></div>
<div class="O0" style="line-height: normal; margin: 0pt 0in 0pt 0.31in; text-indent: -0.19in; text-align: justify; direction: ltr; unicode-bidi: embed; word-break: normal;"><span style="font-size: 11pt;"><span style="color: #323842; font-family: Arial;">&bull;</span></span><span style="font-size: 11pt; font-family: 'Malgun Gothic'; font-variant-ligatures: normal; font-variant-alternates: normal; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-position: normal; color: #1f2329; letter-spacing: 0pt; vertical-align: baseline;">Increase the connectivity within the EAPP power grid and facilitate the upcoming market and integration with SAPP.</span></div>

Project Information

Sector: Energy
Sub-Sector: Power Interconnector
Status: Active
Stage: N/A

Want Full Access?

Register to view complete project details, financial information, and more.

Get Started