The Ethiopia-Sudan Transmission Interconnection Project

Project Overview

<p class="MsoNormal">The power system interconnection project involved the construction of a high voltage transmission line from Ethiopia to Sudan to utilise surplus hydropower from Ethiopia to replace oil-based thermal generation in Sudan. The interconnection was also intended to allow for pooling of reserves in emergency situations, which would allow electricity to be transferred from Sudan to Ethiopia during times of severe hydrological conditions in Ethiopia. The interconnection will also achieve considerable savings in the operation of power plants in the long run.</p>
<p class="MsoNormal">The Ethiopia-Sudan Transmission Interconnection Project comprised of a new 194 km double circuit 230/220 KV transmission line linking Shehedi in Ethiopia to Gedaref in Sudan; reinforcement of Ethiopia&acirc;&euro;&trade;s existing 260 km single circuit line linking Bahir Dar to Gonder and Shehedi; and a new 36.5 km high voltage, double circuit, 230/220 kV, three phase alternating current transmission line linking Shehedi to Metema at the Ethiopia-Sudan border. The transmission capacity of the power lines is 100 MW.</p>
<p class="MsoNormal">The construction phase of the project was nationally funded and implemented between 2009 and 2013.</p>

Description

<p>The power system interconnection project involved the construction of a high voltage transmission line from Ethiopia to Sudan to utilise surplus hydropower from Ethiopia to replace oil-based thermal generation in Sudan. The interconnection was also intended to allow for pooling of reserves in emergency situations, which would allow electricity to be transferred from Sudan to Ethiopia during times of severe hydrological conditions in Ethiopia. The interconnection will also achieve considerable savings in the operation of power plants in the long run.</p>
<p>The Ethiopia-Sudan Transmission Interconnection Project comprised of a new 194 km double circuit 230/220 KV transmission line linking Shehedi in Ethiopia to Gedaref in Sudan; reinforcement of Ethiopia&acirc;&euro;&trade;s existing 260 km single circuit line linking Bahir Dar to Gonder and Shehedi; and a new 36.5 km high voltage, double circuit, 230/220 kV, three phase alternating current transmission line linking Shehedi to Metema at the Ethiopia-Sudan border. The transmission capacity of the power lines is 100 MW.</p>
<p>The construction phase of the project was nationally funded and implemented between 2009 and 2013.</p>
<p> </p>

Stakeholders

Eastern Nile Technical Regional Office - ENTRO (ENTRO) 16
Ethiopia - Government of Ethiopia (GoET) 11
Nile River Basin Program (NRBIP) 17
Sudan - Government of Sudan (GoSD) 11

Project Information

Sector: Energy
Sub-Sector: Power Interconnector
Status: Active
Stage: N/A

Want Full Access?

Register to view complete project details, financial information, and more.

Get Started