Project Overview

<p class="MsoNormal" [removed]="font-size:8.5pt;font-family:"Times New Roman",serif">The
Dal project site is located on the Nile in Sudan some 280 km downstream of
Dongola and immediately upstream of Lake Nubia / Lake Nasser. The project
comprises of a 30 m high dam with 1400 m long crest and 400 MW installed
generation capacity. The dam will create a reservoir of area 300 km<sup>2</sup>
and 2470 MCM storage volume. It also includes the construction of 240 km 220 KV
AC double circuit power transmission line from Dal to Dongola.</span></p>

<p class="MsoNormal" [removed]="font-size:8.5pt;font-family:"Times New Roman",serif"> </span><span [removed] New Roman",serif;
mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-ansi-language:
EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">Prefeasibility
studies were completed in 2007 with grant funding from the African Development
Bank under the Easer Nile Power Trade Program.</span>


</p>

Description

<p class="MsoNormal" [removed]="font-size:8.5pt;font-family:"Times New Roman",serif">The
Dal project site is located on the Nile in Sudan some 280 km downstream of
Dongola and immediately upstream of Lake Nubia / Lake Nasser. The project
comprises of a 30 m high dam with 1400 m long crest and 400 MW installed
generation capacity. The dam will create a reservoir of area 300 km<sup>2</sup>
and 2470 MCM storage volume. It also includes the construction of 240 km 220 KV
AC double circuit power transmission line from Dal to Dongola.</span></p>

<p class="MsoNormal" [removed]="font-size:8.5pt;font-family:"Times New Roman",serif"> </span><span [removed] New Roman",serif;
mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-ansi-language:
EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">Prefeasibility
studies were completed in 2007 with grant funding from the African Development
Bank under the Easer Nile Power Trade Program.</span></p><br>

Stakeholders

Eastern Nile Technical Regional Office - ENTRO (ENTRO) 16
Nile River Basin Program (NRBIP) 17
Sudan - Government of Sudan (GoSD) 11

Project Information

Sector: Energy
Sub-Sector: Hydro Power Plant
Status: Active
Stage: N/A

Interested in investing?

Contact the AUDA-NEPAD investment desk for project information, documents and an introduction to the sponsor.

Express investment interest

Want Full Access?

Register to view complete project details, financial information, and more.

Get Started