<p class="MsoNormal" [removed]="font-size:8.5pt;font-family:"Times New Roman",serif">The
Dal project site is located on the Nile in Sudan some 280 km downstream of
Dongola and immediately upstream of Lake Nubia / Lake Nasser. The project
comprises of a 30 m high dam with 1400 m long crest and 400 MW installed
generation capacity. The dam will create a reservoir of area 300 km<sup>2</sup>
and 2470 MCM storage volume. It also includes the construction of 240 km 220 KV
AC double circuit power transmission line from Dal to Dongola.</span></p>
<p class="MsoNormal" [removed]="font-size:8.5pt;font-family:"Times New Roman",serif"> </span><span [removed] New Roman",serif;
mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-ansi-language:
EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">Prefeasibility
studies were completed in 2007 with grant funding from the African Development
Bank under the Easer Nile Power Trade Program.</span>
</p>
<p class="MsoNormal" [removed]="font-size:8.5pt;font-family:"Times New Roman",serif">The
Dal project site is located on the Nile in Sudan some 280 km downstream of
Dongola and immediately upstream of Lake Nubia / Lake Nasser. The project
comprises of a 30 m high dam with 1400 m long crest and 400 MW installed
generation capacity. The dam will create a reservoir of area 300 km<sup>2</sup>
and 2470 MCM storage volume. It also includes the construction of 240 km 220 KV
AC double circuit power transmission line from Dal to Dongola.</span></p>
<p class="MsoNormal" [removed]="font-size:8.5pt;font-family:"Times New Roman",serif"> </span><span [removed] New Roman",serif;
mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-ansi-language:
EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">Prefeasibility
studies were completed in 2007 with grant funding from the African Development
Bank under the Easer Nile Power Trade Program.</span></p><br>