<p class="MsoNormal" [removed]="mso-spacerun:yes">The project is located in Eastern
Equatorial state of South Sudan. It is in the southern part of Magwi County,
approximately 39 kilometres south of Magwi, near the border with Uganda - South
Sudan Uganda Border.</p>
<p class="MsoNormal" [removed]="mso-spacerun:yes"> The Project is located in Eastern
Equatorial state of South Sudan. It is in the southern part of Magwi County,
approximately 39 kilometres south of Magwi, near the border with Uganda - South
Sudan Uganda Border.</p>
<p class="MsoNormal" [removed]="font-size:11.0pt;line-height:107%;font-family:" calibri",sans-serif;="" mso-ascii-theme-font:minor-latin;mso-fareast-font-family:calibri;mso-fareast-theme-font:="" minor-latin;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:"times="" new="" roman";="" mso-bidi-theme-font:minor-bidi;mso-ansi-language:en-za;mso-fareast-language:="" en-us;mso-bidi-language:ar-sa"="" lang="EN-ZA">This MPP Water resources development project
will result in a 520 Mm3 dam, 10MW electricity, 21,800ha of irrigation, and up
to 36,000m3 /d water. A pre-feasibility study has been done and now requires a
feasibility, ESIA & RAP, detailed design and project implementation. USD 3m
has been included in NEL-IP for studies. A preliminary estimate for implementation
is USD 41.6m
</p>