Kabuyanda Multipurpose Water Resources Development Project

Project Overview

<p><span>The Kabuyanda Water Resources Development Project,
renamed Kabuyanda Irrigation Scheme, is located in Isingiro and Ntungamo
Districts in south-western Uganda. The project area is characterized by
fluctuating rainfall and with up to four months of little to no rainfall. The
proposed project consists of a dam (Kabuyanda dam) and an irrigation scheme.
The dam is a 33 m high earth-fill dam on the Mishumba River with a 8.8 MCM
reservoir and 90 km2 drainage area. The dam will be located approximately 5 km
north-west of Kabuyanda Town, and will submerge an area of 100 ha within the
Rwoho Central Forest Reserve (CFR). The irrigation area served by the dam is
expected to cover 3,300 ha.</span></p><br>

Description

<p><span>The Kabuyanda Water Resources Development Project,
renamed Kabuyanda Irrigation Scheme, is located in Isingiro and Ntungamo
Districts in south-western Uganda. The project area is characterized by
fluctuating rainfall and with up to four months of little to no rainfall. The
proposed project consists of a dam (Kabuyanda dam) and an irrigation scheme.
The dam is a 33 m high earth-fill dam on the Mishumba River with a 8.8 MCM
reservoir and 90 km2 drainage area. The dam will be located approximately 5 km
north-west of Kabuyanda Town, and will submerge an area of 100 ha within the
Rwoho Central Forest Reserve (CFR). The irrigation area served by the dam is
expected to cover 3,300 ha.</span></p><span>Funded under the World Bank-funded Irrigation for
Climate Resilience Project (ICRP). In 2019, the design of the original project
was revised to simplify management and reduce the project costs, and the ESIA
and RAP (including all required documentation like the Integrated Pest
Management Plan (IPMP) and Dam Safety Management Plan (DSMP)) were accordingly
revised and updated. Dam utilization options were also re-assessed and the
option of irrigation development alone, which excludes hydropower, domestic
uses and livestock uses, was recommended and selected for implementation.</span><br>

Objectives

<p><span class="markedContent" id="page3R_mcid8"><span [removed]="left: 95.175px; top: 805.337px; font-size: 15px; font-family: sans-serif; transform: scaleX(1.0484);" role="presentation" dir="ltr"> provide</span><span [removed]="left: 218.64px; top: 805.337px; font-size: 15px; font-family: sans-serif; transform: scaleX(1.01942);" role="presentation" dir="ltr"> with</span><span [removed]="left: 315.375px; top: 805.337px; font-size: 15px; font-family: sans-serif; transform: scaleX(1.0425);" role="presentation" dir="ltr">to</span><span [removed]="left: 408.675px; top: 805.337px; font-size: 15px; font-family: sans-serif;" role="presentation" dir="ltr"> a</span><span [removed]="left: 445.863px; top: 805.337px; font-size: 15px; font-family: sans-serif; transform: scaleX(1.03545);" role="presentation" dir="ltr"> other</span> <span [removed]="left: 48px; top: 845.337px; font-size: 15px; font-family: sans-serif; transform: scaleX(1.04254);" role="presentation" dir="ltr">for irrigation service delivery</span></span></p><p><span>The project will create
multi-purpose storage and equip land for irrigation. The project will benefit
200,000 people in Uganda.</span><br></p>

Stakeholders

Nile River Basin Program (NRBIP) 17
Uganda - Government of Uganda (GoUG) 11
World Bank (WB) 5

Project Information

Sector: Water
Sub-Sector: Multi-purpose Reservoir
Status: Active
Stage: N/A

Interested in investing?

Contact the AUDA-NEPAD investment desk for project information, documents and an introduction to the sponsor.

Express investment interest

Want Full Access?

Register to view complete project details, financial information, and more.

Get Started