<p><span>The
project will develop hydropower generation plants at four sites (Semliki, Mogomba,
Muyama and Kiyimbi) all located close to the Uganda - D.R. Congo Border. The
four sites have potential capacity of 150 MW and energy production of 800 GWh.</span></p>
<span>Project
identification and pre-feasibility studies have been completed. Caped
requirement is about US$900 million.</span>
<p></p><p><v:shapetype>
<v:stroke>
<v:formulas>
<v:f>
<v:f>
<v:f>
<v:f>
<v:f>
<v:f>
<v:f>
<v:f>
<v:f>
<v:f>
<v:f>
<v:f>
</v:f></v:f></v:f></v:f></v:f></v:f></v:f></v:f></v:f></v:f></v:f></v:f></v:formulas>
<v:path>
<o:lock>
</o:lock></v:path></v:stroke></v:shapetype><v:shape>
<v:imagedata src="file:///C:/Users/nilem/AppData/Local/Temp/msohtmlclip1/01/clip_image001.jpg">
<w:wrap>
</w:wrap></v:imagedata></v:shape><span>The Semliki River is part of the Nile River Basin with two thirds of
its course being in the DRC and the lower third forming the boundary between
the DRC and Uganda. Great Lakes Region is characterized by a shortage of
indigenous energy sources and highly skewed relationships of dependency
regarding energy imports Less than 10% of the population has access to
electricity. The region is thus heavily dependent on oil imports Currently,
majority of the population of Eastern DRC, Rwanda, Burundi and Uganda relies on
bio-fuels such as wood The power demand for the cities of Beni, Butembo and
surroundings will be supplied from a hydropower station on the Semliki River
with a capacity of 72 MW. It will need a step-up transformer MV/HV or MV;
including the construction of the distribution network. The Semliki hydropower
station would serve mainly the towns of Béni and Butembo as well as the rural
areas located around these towns. The available reserve could be exported to
the Great Lakes Region with an interconnection grid. The Semliki is one of four (the others are Mogomba, Muyama and Kiyimbi) proposed hydropower projects, packaged to have potential capacity of 150MW, generating annual energy production of 800 GWh.</span></p>
<p><span>A hydropower
station on the Semuliki River of 72 MW; - power distribution network low and high voltage in the
towns of Beni and Butembo and surroundings. The distribution network is
envisaged to be a Medium Voltage network. Béni and Butembo will be served by 30
kV lines from the substation at the Semliki plant.</span></p>
<p></p><p><span>Butembo has
already a network LV and MV linked to its own hydropower station. However its
network will be adapted to the parameters of the Semliki project (distribution
voltage 30 kV, distribution 6.6 kV) and will in some cases be extended. A high
voltage transmission line (220kV) from Goma - Butembo - Béni whose feasibility
is complete will also be constructed to evacuate the generation from Semuliki.</span></p><p>Dated studies suggested the project would cost USD 900m. Several areas that require particular attention have been noted in previous studies including: Improvement of hydrological data and modelling, economic modelling to determine viability, comprehensive ESIA to address potentially large environmental challenges, the actual geological conditions, layouts and designs.
A budget of USD 6m has been included in the phase of the NEL-IP for the required studies to define the project better.</p>
<p><span>To
enhance energy security and regional integration through hydropower generation
and power interconnection.</span></p>
<p><b><span>Benefits:</span></b></p>
<span>The
project will provide electricity, reduce reliance on wood fuel (and hence reduce
environmental degradation) and stimulate local economic activities. The project
will benefit 1 million people in the towns of Butembo and Beni, and other
smaller towns in eastern DR Congo and western Uganda.</span>