The project incorporates a combination of capital expenditure and operational optimisation initiatives to increase the capacity of the overall export coal system to 81mtpa.
<p>The project incorporates a combination of capital expenditure and operational optimisation initiatives to increase the capacity of the overall export coal system to 81mtpa. These projects include:<br />
- Major upgrades to the power supply and overhead traction equipment<br />
- Running line upgrades<br />
- Matlabas loop extension<br />
- Rolling stock yards"<br />
</p>