Kinshasa - Ilebo Railway

PIDA Code: T.19.03

Project Overview

Kinshasa-Ilebo Railway is a strategic DRC rail corridor intended to link Kinshasa to Ilebo and improve the inland connection between the Congo River system, the national rail network and regional transport corridors.

Description

<p>The project concerns feasibility and future development of the Kinshasa-Ilebo railway link, often discussed together with the Kinshasa-Brazzaville road-rail bridge agenda. The strategic rationale is to overcome a long-standing bottleneck in the DRC transport system by connecting Kinshasa more effectively to the interior and to regional rail corridors.</p><p>Historically, DRC s transport network has depended heavily on a combination of river, road and ageing rail assets. AfDB-backed studies considered the feasibility of extending rail connectivity and improving intermodal movement between Kinshasa, Ilebo and neighbouring corridors. This is particularly important for freight movements between the Atlantic gateway, the Congo River basin and mining/agricultural hinterlands.</p><p>Validation note: external AfDB sources validate the feasibility-study scope and the approximate 1,015 km survey/study distance, but they do not validate the current construction capex_cost of 16,939 USD million. The cost should remain provisional.</p><p><strong>Sources reviewed:</strong> AfDB MapAfrica, Feasibility Study of the Extension of the Kinshasa-Ilebo Railway, https://mapafrica.afdb.org/en/projects/46002-P-Z1-DC0-014; AfDB, Study on the Road-Rail Bridge between Kinshasa and Brazzaville and the Kinshasa-Ilebo Railroad, https://www.afdb.org/en/documents/document/multinational-study-on-the-road-rail-bridge-between-kinshasa-and-brazzaville-and-the-kinshasa-ilebo-railroad-8186.</p>

Objectives

<ol><li>Improve Kinshasa-Ilebo rail connectivity.</li><li>Support multimodal movement between river, road and rail systems.</li><li>Strengthen DRC internal integration and regional corridor access.</li><li>Prepare bankable designs and implementation arrangements.</li></ol>

Stakeholders

Economic Community of Central African States (CEEAC-ECCAS) 9
DRC - Ministry of Public Works and Infrastructure (MTPI (CD)) 11
NEPAD Infrastructure Project Preparation Facility (IPPF) 18
African Development Fund (ADF) 18
DRC - Government of Democratic Republic of Congo (GoCD) 11
African Development Fund (ADF) 18
DRC - Government of Democratic Republic of Congo (GoCD) 11
NEPAD Infrastructure Project Preparation Facility (IPPF) 18

Project Information

Sector: Transport
Sub-Sector: Railway
Status: Active
Stage: N/A

Want Full Access?

Register to view complete project details, financial information, and more.

Get Started