{"success":true,"country":"Kenya","stats":{"total_projects":188,"total_capex":"172225.98","sector_count":4},"projects":[{"id":2991,"project_name":"Mombasa-Nairobi-Malaba-Kampala-Kigali Standard Gauge Railway with Malaba-Nimule-Juba Spur","pida_code":"T.RL.26.03","lat":0.64073100000000005049827223047032020986080169677734375,"lng":34.26299999999999812416717759333550930023193359375,"zoom_level":"10","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"19200.00","preparation_cost":null,"summary":"The project is a regional standard-gauge railway programme connecting Mombasa Port with Nairobi, Malaba, Kampala and Kigali, together with a branch from Malaba through Nimule to Juba. The approved PIDA PAP II scope covers Kenya, Uganda, Rwanda and South Sudan, while Burundi and the Democratic Republic of Congo are beneficiary countries. Its purpose is to increase rail capacity along the Northern Corridor, reduce reliance on road freight and improve access from landlocked East African markets to Mombasa Port.\r\n\r\nThe original PIDA PAP II cost estimate is USD 19.2 billion and the submitted milestone was S3A - Project Structuring. Development is uneven by country and segment. Kenya has operational standard-gauge sections between Mombasa, Nairobi and Naivasha, while the regional extensions remain incomplete. Uganda signed an engineering, procurement and construction arrangement for the Malaba-Kampala section and has continued right-of-way acquisition and pre-construction preparation, but official budget reporting does not yet establish the completion of the planned regional network.","description":"The Northern Corridor Standard Gauge Railway is intended to create an interoperable regional railway from the Indian Ocean port of Mombasa to Uganda and Rwanda, with an additional link to South Sudan. The approved route begins with the approximately 480 km Mombasa-Nairobi section, continues approximately 120 km to Naivasha and then extends westward through Kenya to Malaba. In Uganda, the principal eastern section links Malaba with Kampala, with further planned connections towards Rwanda and a northern branch through Gulu and Nimule to Juba.\r\n\r\nThe railway is designed for high-speed passenger operations of up to 160 km\/h and high-capacity freight services. Its strategic function is to complement the heavily used Northern Corridor road network, reduce transport costs and transit times, improve port-hinterland connectivity and support regional trade and industrial development.\r\n\r\nThe programme must be reported as a regional umbrella rather than as a single homogeneous construction contract. Kenya has completed and operates the Mombasa-Nairobi and Nairobi-Naivasha sections. Uganda has undertaken design, land acquisition, stakeholder engagement and contractor procurement for the Malaba-Kampala section. Rwanda and South Sudan remain dependent on completion and sequencing of the upstream sections and on regional financing and implementation agreements.\r\n\r\nUganda's official transport reporting records engagement of Yapi Merkezi for the eastern route and subsequent pre-construction and right-of-way work. Official FY2025\/26 and FY2026\/27 budget documents contain construction targets for the Malaba-Kampala section, but targets are not the same as verified completed works. The project is therefore coded at S4A for the latest period because an implementation contract and preparatory activities exist, while full physical construction of the regional programme and regional commissioning have not been demonstrated.\r\n\r\nThe USD 19.2 billion value remains the approved PAP II regional baseline. Segment costs, national budget allocations and financing arrangements should not be substituted for that full-scope estimate unless an approved consolidated regional cost update becomes available.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"Uganda, South Sudan, Rwanda, Kenya, Democratic Republic of Congo, Burundi","latest_stage":"Tendering","images":[],"has_geometry":true},{"id":2972,"project_name":"LAPSSET Railway Project","pida_code":"T.RL.26.02","lat":-0.365350000000000008082423619271139614284038543701171875,"lng":39.76879999999999881765688769519329071044921875,"zoom_level":"10","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"13500.00","preparation_cost":"9.00","summary":"The LAPSSET Railway Project is a proposed regional standard-gauge railway connecting Lamu Port in Kenya with South Sudan and Ethiopia. The approved alignment extends from Lamu through Garissa to Isiolo, then branches from Isiolo through Nginyang and Nakodok to Juba and through Moyale to Addis Ababa; the approved concept also includes a Nairobi-Isiolo connection. The complete network is approximately 2,900 km long. The approved technical baseline specifies a 1,435 mm standard gauge, electric traction, a passenger design speed of up to 160 km\/h and a freight design speed of up to 120 km\/h. Kenya, Ethiopia and South Sudan are the project-location countries, while Uganda is also identified as a beneficiary country.\r\n\r\nThe railway is intended to provide landlocked South Sudan and Ethiopia with an additional connection to the Indian Ocean through Lamu Port and to support the movement of passengers, heavy freight, oil products and other non-pipeline petroleum products along the corridor.","description":"The LAPSSET Railway Project forms the railway component of the Lamu Port-South Sudan-Ethiopia Transport Corridor. Its approved purpose is to create a new regional rail connection from the Indian Ocean coast through northern Kenya to Ethiopia and South Sudan. The route begins at Lamu Port, runs through Garissa to Isiolo, and then divides into two international branches. One branch continues through Nginyang and Nakodok to Juba in South Sudan, while the other continues through Moyale to Addis Ababa in Ethiopia. The approved concept also includes a railway connection between Nairobi and Isiolo.\r\n\r\nThe approved regional network is approximately 2,900 km long. The PIDA PAP II submission specifies a 1,435 mm standard gauge and electric-powered railway technology, with design speeds of up to 160 km\/h for passenger trains and 120 km\/h for freight trains. The planned railway is intended to carry passengers, heavy goods, oil products and other non-pipeline petroleum products, including bulk fuel oil, bitumen and liquefied petroleum gas, between Lamu Port and demand centres along the corridor. These are planned design parameters and must not be reported as completed or operational capacity.\r\n\r\nThe project is regional in both geography and governance. Ethiopia, Kenya and South Sudan are the member states and project locations recorded in the approved PAP II submission. Uganda is also identified as a beneficiary country. IGAD is the regional economic community and the IGAD Secretariat is identified as the project institution. The project is aligned with Kenya Vision 2030 and the IGAD Regional Infrastructure Master Plan. Implementation will require coordinated technical standards, cross-border operating rules, environmental and social safeguards, land and corridor protection, institutional agreements and financing arrangements across the participating countries.\r\n\r\nThe submitted project-cost baseline is USD 12.0 billion. This amount should remain the historical PAP II baseline until a later consolidated cost is supported by an approved regional study. The approved-project record identifies S2A - Pre-Feasibility as the last known milestone. The PIDA Investment Prospectus status history also records Pre-Feasibility in 2020, 2022 and 2024. These dated status entries should control the historical annual records rather than retrospectively applying the current feasibility label.\r\n\r\nThe current PIDA Investment Prospectus displays the project at Feasibility, or 50 percent progress. It identifies the remaining work as completion of comprehensive feasibility studies across the project, mobilisation of technical assistance for detailed designs, establishment of a corridor-coordination mechanism, completion of environmental and social assessments, development of PPP frameworks and securing of financing commitments. Contractors and operators remain to be determined through competitive procurement after project structuring and financing.  \r\n\r\nOther LAPSSET investments must not be used as evidence of railway construction. Progress on Lamu Port, highways, pipelines, airports, resort cities, the refinery, the multipurpose dam or communications systems belongs to separate components of the wider corridor.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"South Sudan, Kenya, Ethiopia, Uganda","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":3016,"project_name":"Establishment of a Navigational Line between Lake Victoria and the Mediterranean Sea - Feasibility Study Phase 2 (VICMED)","pida_code":"T.IW.26.04","lat":28.843900000000001426769813406281173229217529296875,"lng":30.63340000000000173940861714072525501251220703125,"zoom_level":"10","sector_name":"Transport","subsector_name":"Inland Port & Waterway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"12000.00","preparation_cost":"18.85","summary":"The Establishment of a Navigational Line Between Lake Victoria and the Mediterranean Sea (VICMED) is a Presidential Infrastructure Champion Initiative (PICI) that is championed by the president of Egypt. The other participating countries in the project are Burundi, DR Congo, Ethiopia, Kenya, Rwanda, South Sudan, Sudan, Tanzania and Uganda. The objectives of the VICMED project are to achieve socio-economic integration and cohesion; a sustainable and integrated multimodal transport system; enhanced trade and tourism; and reduced poverty among Nile Basin footprint countries. Expected benefits from the project include deepening regional integration and employment creation. Knowledge transfer, poverty reduction through improved household incomes, a relatively cheaper and environmentally friendly transport mode, and a shorter and direct transport route between Western Europe and Eastern and Central Africa.","description":"The VICMED initiative proposes an integrated navigation and multimodal transport corridor from Lake Victoria to the Mediterranean Sea. It is intended to connect Nile Basin countries through river, lake and supporting land-transport infrastructure and to improve access for landlocked countries to international ports and markets.\r\n\r\nThe project's expected benefits include lower-cost movement of goods, improved regional trade and tourism, employment creation and stronger economic integration. It also requires careful assessment of water-resource, environmental, social, navigational and institutional implications across a large transboundary basin.\r\n\r\nThe prefeasibility study, which involved consultation with the footprint countries, was completed in 2015 and approved in 2017 by the 3rd Steering Committee for VICMED. \r\n\r\nThe feasibility study Phase 1 was completed in July 2019 and was funded through a US$650,000 grant from AfDB. It involved the development of an institutional and legal framework for VICMED and conducting a training needs assessment. It also involved preparing the terms of reference for Feasibility Study Phase 2 and carrying out training for countries on inland water transport, which took place in February.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"Uganda, Tanzania, Sudan, South Sudan, Rwanda, Kenya, Ethiopia, Egypt, Democratic Republic of Congo, Burundi","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":716,"project_name":"Nairobi - Malaba Standard Gauge Railway (part of Mombasa - Kigali Railway Project)","pida_code":"T.05.05.01.02","lat":-0.31888600000000000278532752417959272861480712890625,"lng":35.53529999999999944293449516408145427703857421875,"zoom_level":"5","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"6498.00","preparation_cost":"0.00","summary":"The Nairobi\u2013Malaba Standard Gauge Railway is the proposed Kenyan extension of the regional railway toward the Uganda border. It is intended to improve long-distance freight and passenger movement and connect Kenya's existing standard-gauge network with the wider Mombasa\u2013Kigali corridor. The extension remains at project-structuring stage.","description":"<p>The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Nairobi to the Kenya\/Uganda border at Malaba.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Kenya, Uganda, Rwanda","latest_stage":"Project Structuring","images":[],"has_geometry":true},{"id":221,"project_name":"Mombasa - Nairobi Standard Gauge Railway (part of Mombasa - Kigali Railway Project)","pida_code":"T.05.05.01.01","lat":-2.683899999999999952393636704073287546634674072265625,"lng":38.273899999999997589839040301740169525146484375,"zoom_level":"5","sector_name":"Transport","subsector_name":"Railway","status_name":"Completed","stage_name":null,"stage_code":null,"capex_cost":"5000.00","preparation_cost":"500.00","summary":"The Mombasa\u2013Nairobi Standard Gauge Railway is an operating 472 km rail line connecting the Port of Mombasa with Nairobi. It carries freight and passengers, reduces pressure on the road corridor and provides the completed first major section of Kenya's standard-gauge network. The line is operational; the wider Mombasa\u2013Kigali programme includes separate extensions.","description":"<p>The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Mombasa port to Nairobi in Kenya.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Kenya, Uganda, Rwanda","latest_stage":"Operation","images":[],"has_geometry":true},{"id":223,"project_name":"Kampala - Kasese Standard Gauge Railway (part of Mombasa - Kigali Railway Project)","pida_code":"T.05.05.01.05","lat":0.30071999999999998731681216668221168220043182373046875,"lng":31.333800000000000096633812063373625278472900390625,"zoom_level":"5","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"4400.00","preparation_cost":"0.00","summary":"The Kampala\u2013Kasese Standard Gauge Railway is a proposed western Ugandan rail section within the wider Mombasa\u2013Kigali corridor. It is intended to connect Kampala with western production and mining areas and improve access to regional markets through a modern rail line. The project remains at project-structuring stage.","description":"<p>The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Kampala to Kasese in Uganda.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Uganda, Rwanda, Kenya","latest_stage":"Project Structuring","images":[],"has_geometry":true},{"id":717,"project_name":"Kasese - Mirama Hills Standard Gauge Railway (part of Mombasa - Kigali Railway Project)","pida_code":"T.05.05.01.06","lat":-0.4327389999999999847801746000186540186405181884765625,"lng":30.22939999999999827196006663143634796142578125,"zoom_level":"5","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"4400.00","preparation_cost":"0.00","summary":"The Kasese\u2013Mirama Hills Standard Gauge Railway is a proposed western Ugandan section of the wider Mombasa\u2013Kigali rail corridor. It is intended to connect Kasese and surrounding production areas with the Rwanda border and the regional standard-gauge network. The project remains at project-structuring stage.","description":"<p>The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Kasese in Uganda, to the border with Rwanda at Mirama Hills.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Uganda, Rwanda, Kenya","latest_stage":"Project Structuring","images":[],"has_geometry":true},{"id":225,"project_name":"Mirama Hills - Kigali Railway (part of Mombasa - Kigali Project)","pida_code":"T.05.05.01.07","lat":-0.88032399999999999540278849963215179741382598876953125,"lng":30.05969999999999942019712761975824832916259765625,"zoom_level":"5","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"4400.00","preparation_cost":"0.00","summary":"The Mirama Hills\u2013Kigali Railway is a proposed cross-border section linking the Uganda\u2013Rwanda border with Kigali. It is intended to connect Rwanda to the wider Mombasa\u2013Kigali rail corridor and improve access to regional ports and markets. The project remains at project-structuring stage.","description":"<p>The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from the Mirama Hills border (Uganda\/Rwanda) to Kigali, the capital of Rwanda.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Rwanda, Uganda, Kenya","latest_stage":"Project Structuring","images":[],"has_geometry":true},{"id":2057,"project_name":"Phase 2B: Naivasha - Kisumu (including new port at Kisumu) SGR line","pida_code":"","lat":-0.7224429999999999463256017406820319592952728271484375,"lng":36.4388000000000005229594535194337368011474609375,"zoom_level":"3","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"3786.00","preparation_cost":"0.00","summary":"Phase 2B of Kenya's Standard Gauge Railway covers the proposed Naivasha\u2013Kisumu extension and associated Kisumu port connection. It is intended to extend the operational railway toward western Kenya and improve rail\u2013lake logistics. In March 2026, Kenya revived the wider Naivasha\u2013Kisumu\u2013Malaba programme, while the Phase 2B section remained in tendering and implementation preparation.","description":"","programme_name":"Northern Multimodal Transport Corridor","countries":"Kenya, Uganda, Rwanda","latest_stage":"Tendering","images":[],"has_geometry":false},{"id":2244,"project_name":"Crude Oil Pipeline: Lamu to South Sudan","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Energy","subsector_name":"Petroleum\/Gas Pipeline","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"3064.00","preparation_cost":"3064.00","summary":"<p><span wfd-id=\"683\">The crude oil pipeline in Kenya will be\r\nconstructed in three phases consisting of Lamu-Isiolo (540km) $1,480 million,\r\nIsiolo-Nakodok (780 km) $1,240 million, and Lamu Port Area $340 million. It is\r\nplanned to link up with a pipeline to Jonglei at the South Sudan border. The\r\nCrude Oil Pipeline Pre-Front End Engineering Design (FEED) studies were\r\ncompleted in December 2015 and a Joint Development Agreement (JDA) was signed\r\nbetween the Government of Kenya and Upstream Investors (Tullow Oil Company,\r\nAfrica Oil and Maersk) in 2017.<\/span><\/p>","description":"<p><span wfd-id=\"915\">The Lamu Crude Oil Pipeline is a proposed\r\ncrude oil pipeline that will originate from South Sudan oil fields to the Lamu\r\nport and will also be used to evacuate crude oil from the oil rich fields in\r\nSouth Lokichar in Kenya to Lamu Port for export. Crude oil loading to oil\r\ntankers will be made through Single Point Mooring (SPM) at Lamu Port. 200,000DWT\r\nis considered as the maximum size of the tankers. The location of the refinery\r\nhas been investigated under this study. Lamu has been considered for the\r\nlocation. Crude oil will be transported through the crude oil pipeline, while\r\nGasoline, Kerosene and Diesel will be transported through the product oil\r\npipeline (multi-product pipeline). Transportation volumes have been set through\r\nthe analysis by among economists, refinery engineers and pipeline engineers\r\nbased on the market and economic study.<\/span><\/p>\r\n<p><span wfd-id=\"914\">Crude oil is to\r\nbe transported from the tank terminal beside the refinery to SPMs by two crude\r\noil pipelines. The onshore portion of the pipelines route has been selected to\r\navoid passage through the city centre of Lamu, whereas, the offshore portion\r\nhas been selected to run along the boundary of port extension plan. The\r\npipelines will run in an easterly direction through Magumba before turning\r\nSouth-east into Wange creak where they will be installed under the seabed to a\r\npoint just North-west of Pate Island. The lines will make a turn Southwards\r\ntransversing mainly a mangrove area through Tukutu, Chongoni and Mwamba Pazah.\r\nFrom Mwamba Pazah the lines will be installed under the sea bed and run\r\nsouthwards to the two SPMs in the main channel. Crude oil stored at Lamu crude oil\r\ntank terminal will be transported through crude oil exporting pipelines of 42km\r\nlength (on-land portion 11km, offshore portion 31km) to Single Point Moorings\r\n(SPM) and then to oil tankers (Max.200,000DWT) for export. The duration of\r\nloading to the tanker has been set as 30 hours, which is typical loading time\r\nin oil exporting countries. The flow rate of loading to a 200,000DWT tanker has\r\nbeen set as 8,000m3\/hr accordingly. The design pressure is set to be 2.0MPa as\r\na typical pressure. As a result of the hydraulic analysis, it has been found\r\nthat two lines of 48-inch diameter are required.<\/span><\/p>","programme_name":"Intergovernmental Authority on Development (IGAD)","countries":"Kenya, South Sudan","latest_stage":"Project Structuring","images":[],"has_geometry":false},{"id":3162,"project_name":"LAPSSET Crude Oil Pipeline","pida_code":"E.30.03","lat":-2.268499999999999960920149533194489777088165283203125,"lng":40.9020000000000010231815394945442676544189453125,"zoom_level":"6","sector_name":"Energy","subsector_name":"Petroleum\/Gas Pipeline","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"3064.00","preparation_cost":"0.00","summary":"The LAPSSET Crude Oil Pipeline will transport crude oil from South Sudan and Kenya's South Lokichar fields to Lamu Port for export. The project includes pipeline, terminal and offshore loading infrastructure linked to the wider LAPSSET corridor.\r\n\r\n Official Kenyan reporting in January 2026 stated that approximately 821 km of pipeline mapping and design had been completed, while construction, land acquisition, financing and cross-border implementation arrangements remained outstanding.","description":"The project proposes a crude-oil pipeline from the South Sudan oil fields and the South Lokichar basin in Kenya to Lamu Port. Crude oil will be received at a tank terminal and transported through export pipelines to offshore single-point moorings for loading onto oil tankers. The PAP II design also considers related product-pipeline and refinery interfaces. At Lamu, the export system includes onshore and offshore pipeline sections routed to avoid the town centre and sensitive port-development areas, with offshore connections to the designated loading points.\r\n\r\nVerified implementation and technical context: The pipeline is one component of the wider LAPSSET corridor, but its development must be assessed separately from Lamu Port works, highway construction, the South Lokichar upstream petroleum project and interim road or rail evacuation options. The Parliament of Kenya reported that the pipeline design and mapping covered about 821 km and that the facility could also provide a commercial export route for South Sudanese crude. The project nevertheless requires an agreed regional implementation framework, secure land rights, environmental and social approvals, a commercially viable tariff and throughput structure, financing and coordinated terminal and offshore-loading infrastructure before physical construction can begin.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"South Sudan, Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":224,"project_name":"Malaba - Kampala Standard Gauge Railway (part of Mombasa - Kigali Railway Project)","pida_code":"T.05.05.01.04","lat":0.56871499999999997054800360274384729564189910888671875,"lng":33.48559999999999803321770741604268550872802734375,"zoom_level":"5","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"2300.00","preparation_cost":"0.00","summary":"The Malaba\u2013Kampala Standard Gauge Railway is the proposed Ugandan section linking the Kenya border at Malaba with Kampala. It is intended to improve freight and passenger transport and connect Uganda to the wider Mombasa\u2013Kigali rail corridor and regional ports. The project remains in tendering and preparation.","description":"<p>The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from the Malaba border post (between Kenya and Uganda) to the Ugandan capital Kampala.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Uganda, Rwanda, Kenya","latest_stage":"Tendering","images":[],"has_geometry":true},{"id":3109,"project_name":"Continental Africa Water Investment Support Programme (AIP)","pida_code":"W.30.01","lat":null,"lng":null,"zoom_level":"6","sector_name":"Water","subsector_name":"Water Supply","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"1860.00","preparation_cost":"50.00","summary":"The Continental Africa Water Investment Support Programme (AIP) is a continental support mechanism for specific priority water projects identified by African member states, focused on the integrated water-health-energy-food security nexus. It was adopted by African Union Heads of State and Government in February 2021 in Addis Ababa, under the Programme for Infrastructure Development in Africa Priority Action Plan 2. The programme provides an enabling and project-preparation framework that helps member states and regional institutions prepare, finance and advance transboundary and regional projects. Its first phase covers Benin, Cameroon, Tunisia, Uganda and Zambia, together with regional initiatives supported through institutions such as ECCAS and the SADC Water Fund, which is hosted by the Development Bank of Southern Africa. The sponsor is AUDA-NEPAD, working with the Regional Economic Communities and development partners.","description":"AIP provides an enabling and project-preparation framework for priority transboundary and regional water investments submitted by African member states. It supports integrated water, health, energy and food-security projects; strengthens institutional arrangements; helps sponsors develop bankable projects; and links project pipelines to preparation facilities, public finance and private investment. The first phase identifies specific programmes in Benin, Cameroon, Tunisia, Uganda and Zambia, together with regional initiatives supported through institutions such as ECCAS and the SADC Water Fund.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"Zambia, Uganda, Tunisia, Nigeria, Kenya, Ghana, Cameroon, Benin","latest_stage":"Project Definition","images":[],"has_geometry":false},{"id":2056,"project_name":"Phase 2A: Construction of the Nairobi - Naivasha SGR line (part of Mombasa - Kigali SGR Railway Project)","pida_code":"","lat":-1.0896500000000000074606987254810519516468048095703125,"lng":35.9423000000000030240698833949863910675048828125,"zoom_level":"3","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"1483.00","preparation_cost":"0.00","summary":"Phase 2A: Construction of the Nairobi - Naivasha SGR line (part of Mombasa - Kigali SGR Railway Project) is a railway project serving Kenya, Rwanda and Uganda. It seeks to improve freight and passenger movement and connect production areas and inland markets to ports and border crossings through construction or rehabilitation of the named rail section. The Nairobi\u2013Naivasha SGR section is completed and operational as part of Kenya's existing standard-gauge network.","description":"","programme_name":"Northern Multimodal Transport Corridor","countries":"Kenya, Uganda, Rwanda","latest_stage":"Operation","images":[],"has_geometry":false},{"id":2058,"project_name":"Phase 2C: Kisumu - Malaba SGR line","pida_code":"","lat":-0.07363519999999999787743121260064071975648403167724609375,"lng":34.77300000000000324007487506605684757232666015625,"zoom_level":"3","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"1229.00","preparation_cost":"0.00","summary":"Phase 2C of Kenya's Standard Gauge Railway covers the proposed Kisumu\u2013Malaba section toward the Uganda border. It is intended to extend the railway from western Kenya to the regional border and strengthen freight and passenger links along the Northern Corridor. In March 2026, Kenya revived the wider Naivasha\u2013Kisumu\u2013Malaba extension, while the Kisumu\u2013Malaba section remained in tendering and implementation preparation.","description":"","programme_name":"Northern Multimodal Transport Corridor","countries":"Kenya, Uganda, Rwanda","latest_stage":"Tendering","images":[],"has_geometry":false},{"id":2570,"project_name":"Gongo Multipurpose Water resources development project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"1040.20","preparation_cost":"0.00","summary":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">The Gongo dam\r\nsite is situated about 7 km downstream of Yala Town. The dam is located about 1\r\nkm downstream of an existing road bridge. The proposed dam height (from JICA,\r\n1992) is 74 m. The original main purpose of the identified dam site is for\r\npower generation. As part of the proposed multipurpose project it is proposed\r\nto an irrigation component, water supply for part of the densely populated\r\nVihiga Sub County, although this would have to be pumped, and for communities\r\ndownstream of the site, fisheries and aquaculture, tourism and recreation,\r\nagro-processing, watershed management and flood control. The reservoir backs up\r\nto just short of Yala town and would inundate a significant number of\r\nhomesteads. It should be noted that the target area for water supply overlaps\r\nsignificantly with the target area of the Mushangumbo MPP. <\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">A 74m high dam\r\nwould store a volume of about 120 Mm3 and inundate an area of 6km2. Installed\r\ncapacity is 17.11 MW. Size of land irrigated is7,600 ha. Investment costs are\r\nUS$ 1,040.2 million.<\/span><\/p>\r\n\r\n\r\n\r\n\r\n","description":"<p><span>The Gongo dam\r\nsite is situated about 7 km downstream of Yala Town. The dam is located about 1\r\nkm downstream of an existing road bridge. The proposed dam height (from JICA,\r\n1992) is 74 m. The original main purpose of the identified dam site is for\r\npower generation. As part of the proposed multipurpose project it is proposed\r\nto an irrigation component, water supply for part of the densely populated\r\nVihiga Sub County, although this would have to be pumped, and for communities\r\ndownstream of the site, fisheries and aquaculture, tourism and recreation,\r\nagro-processing, watershed management and flood control. The reservoir backs up\r\nto just short of Yala town and would inundate a significant number of\r\nhomesteads. It should be noted that the target area for water supply overlaps\r\nsignificantly with the target area of the Mushangumbo MPP. <\/span><\/p>\r\n<p><span>A 74m high dam\r\nwould store a volume of about 120 Mm3 and inundate an area of 6km2. Installed\r\ncapacity is 17.11 MW. Size of land irrigated is7,600 ha. Investment costs are\r\nUS$ 1,040.2 million.<\/span><\/p>","programme_name":null,"countries":"Kenya","latest_stage":"Pre-Feasibility","images":[],"has_geometry":false},{"id":2246,"project_name":"Product Oil Pipeline: Kenya to Ethiopia","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Energy","subsector_name":"Petroleum\/Gas Pipeline","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"885.30","preparation_cost":"885.00","summary":"<p>The project runs from Lamu -\r\nIsiolo - Moyale - Addis Ababa (Ethiopia), a distance of 987km. Considering that\r\nKenya and Ethiopia are connected through road infrastructure, it might be strategic\r\nto fast track the construction of a product pipeline connecting to Ethiopia\r\nwhich to-date does not have a product pipeline. The Bilateral Agreement on the\r\ndevelopment and operation of the Lamu Port - Isiolo, Nakuru - Isiolo and Isiolo\r\n- Moyale - Hawassa - Addis Ababa Product Oil Pipeline was drafted and approved\r\nby the Attorney General on 17th June 2016. The Bilateral Agreement was then\r\nnegotiated with Ethiopia during Bilateral negotiations held on 18th and 19th\r\nJune 2016. The Agreement was then signed on 23rd June 2016 during the state\r\nvisit to Kenya by Prime Minister of the Federal Democratic Republic of\r\nEthiopia.<\/p><br>","description":"<p><span wfd-id=\"1721\">Product oil refined at Lamu will be transported to\r\nIsiolo and further to Ethiopia. Product oil consists of Gasoline, Kerosene and\r\nDiesel. Each product volume has been set to meet the demand of product oil both\r\nfor exporting to Ethiopia and domestic distribution from the intermediate tank\r\nterminal to be located at Isiolo.<\/span><\/p>\r\n\r\n\r\n<table class=\"MsoNormalTable\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\" width=\"537\" [removed]=\"mso-yfti-irow:0;mso-yfti-firstrow:yes;height:13.2pt;mso-height-rule:\r\n  exactly\">\r\n  <td width=\"95\" valign=\"top\" [removed]:solid;mso-border-top-alt:windowtext .5pt;mso-border-left-alt:\r\n  windowtext .5pt;mso-border-bottom-alt:black 2.25pt;mso-border-right-alt:black .75pt;\r\n  mso-border-style-alt:solid;background:#CCFFFF;padding:0cm 0cm 0cm 0cm;\r\n  height:13.2pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"width: 5.93325%; border-top: 1pt solid windowtext; border-left: none; border-bottom: 2.25pt solid black; border-right: 1pt solid black; background: rgb(204, 255, 255); padding: 0cm; height: 13.2pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"width: 6.30408%; border-top: 1pt solid windowtext; border-left: none; border-bottom: 2.25pt solid black; border-right: 1pt solid black; background: rgb(204, 255, 255); padding: 0cm; height: 13.2pt;\">\r\n  <p class=\"MsoNormal\" align=\"center\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"width: 46.848%; border-top: 1pt solid windowtext; border-left: none; border-bottom: 2.25pt solid black; border-right: 1pt solid black; background: rgb(204, 255, 255); padding: 0cm; height: 13.2pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"letter-spacing:-.05pt\" wfd-id=\"1716\">volumes<\/span><\/span><\/b><\/p>\r\n  <\/td>\r\n  <td width=\"84\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif; text-align: center;\"><b [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;color:black;mso-color-alt:windowtext;\r\n  letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1714\">Design Flow<\/span><\/b><b [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  Calibri;color:black;mso-color-alt:windowtext;letter-spacing:-.05pt;\r\n  mso-ansi-language:EN-US\" wfd-id=\"1713\">Rate<\/span><\/b><\/p>\r\n  <\/td>\r\n <\/tr>\r\n <tr [removed]=\"width:71.05pt;border-top:none;border-left:\r\n  solid windowtext 1.0pt;border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;\r\n  mso-border-top-alt:solid black 2.25pt;mso-border-top-alt:black 2.25pt;\r\n  mso-border-left-alt:windowtext .5pt;mso-border-bottom-alt:black .75pt;\r\n  mso-border-right-alt:black .75pt;mso-border-style-alt:solid;padding:0cm 0cm 0cm 0cm;\r\n  height:26.0pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1712\">Gasoline<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"83\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width: 6.30408%; border-top: none; border-left: none; border-bottom: 1pt solid black; border-right: 1pt solid black; padding: 0cm; height: 26pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1710\">Isiolo<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"193\" valign=\"top\" [removed]=\"text-indent: 16.25pt; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"MS Gothic\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1708\">A\u2014<\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1707\">5<\/span><\/span><span lang=\"EN-US\" [removed]=\"mso-spacerun:yes\" wfd-id=\"1705\">\u00a0<\/span><span [removed]=\"mso-spacerun:yes\" wfd-id=\"1704\">\u00a0<\/span><\/span><\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1701\">3<\/span>\/yr<\/span><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\r\n  \"Calibri Light\",sans-serif;mso-fareast-font-family:\"Times New Roman\";\r\n  letter-spacing:-.1pt;mso-ansi-language:EN-US\" wfd-id=\"1698\"> 11,900bbl\/day)<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"84\" rowspan=\"3\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"text-align: center; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"mso-yfti-irow:2;height:24.95pt;mso-height-rule:exactly\">\r\n  <td width=\"95\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width: 5.93325%; border-top: none; border-left: none; border-bottom: 1pt solid black; border-right: 1pt solid black; padding: 0cm; height: 24.95pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.1pt;mso-ansi-language:EN-US\" wfd-id=\"1693\">Lamu<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"82\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width: 46.848%; border-top: none; border-left: none; border-bottom: 1pt solid black; border-right: 1pt solid black; padding: 0cm; height: 24.95pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1691\">1.65<\/span><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1688\">10<span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";position:relative;top:-4.5pt;\r\n  mso-text-raise:4.5pt;mso-ansi-language:EN-US\" wfd-id=\"1684\"><span [removed]=\"letter-spacing:.6pt\" wfd-id=\"1685\"><span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1682\">m<span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1681\">(Approx.<\/span><span lang=\"EN-US\" [removed]=\"mso-yfti-irow:3;height:25.0pt;mso-height-rule:exactly\">\r\n  <td width=\"95\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width: 5.93325%; border-top: none; border-left: none; border-bottom: 1pt solid black; border-right: 1pt solid black; padding: 0cm; height: 25pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.1pt;mso-ansi-language:EN-US\" wfd-id=\"1678\">Lamu<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"82\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width: 46.848%; border-top: none; border-left: none; border-bottom: 1pt solid black; border-right: 1pt solid black; padding: 0cm; height: 25pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1676\">3.34<\/span><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1673\">10<span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";position:relative;top:-4.5pt;\r\n  mso-text-raise:4.5pt;mso-ansi-language:EN-US\" wfd-id=\"1669\"><span [removed]=\"letter-spacing:.6pt\" wfd-id=\"1670\"><span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1667\">m<span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1666\">(Approx.<\/span><span lang=\"EN-US\" [removed]=\"mso-yfti-irow:4;mso-yfti-lastrow:yes;height:24.95pt;mso-height-rule:\r\n  exactly\">\r\n  <td width=\"260\" colspan=\"3\" valign=\"top\" [removed]=\"text-align: center; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  Calibri;mso-ansi-language:EN-US\" wfd-id=\"1660\"> <span [removed]=\"mso-spacerun:yes\" wfd-id=\"1663\">\u00a0<\/span><\/span><span [removed]=\"width: 46.848%; border-top: none; border-left: none; border-bottom: 1pt solid black; border-right: 1pt solid black; padding: 0cm; height: 24.95pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1659\">5.68<\/span><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1656\">10<span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";position:relative;top:-4.5pt;\r\n  mso-text-raise:4.5pt;mso-ansi-language:EN-US\" wfd-id=\"1652\"><span [removed]=\"letter-spacing:.6pt\" wfd-id=\"1653\"><span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1650\">m<span [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1649\">(Approx.<\/span><span lang=\"EN-US\" [removed]=\"width: 29.0482%; border-top: none; border-left: none; border-bottom: 1pt solid black; border-right: 1pt solid black; padding: 0cm; height: 24.95pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;\r\n  font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:Calibri;\r\n  letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1647\">700<\/span><span lang=\"EN-US\" [removed]=\"letter-spacing:-.05pt\" wfd-id=\"1645\">m<span [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width: 83.7589%; margin-left: 4.95pt; border-collapse: collapse;\">\r\n <tbody><tr [removed]=\"width:69.5pt;border:solid black 1.0pt;\r\n  border-bottom:solid black 1.5pt;mso-border-top-alt:.75pt;mso-border-left-alt:\r\n  .25pt;mso-border-bottom-alt:1.5pt;mso-border-right-alt:.75pt;mso-border-color-alt:\r\n  black;mso-border-style-alt:solid;background:#CCFFFF;padding:0cm 0cm 0cm 0cm;\r\n  height:23.95pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" align=\"center\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"width:59.95pt;border-top:solid black 1.0pt;\r\n  border-left:none;border-bottom:solid black 1.5pt;border-right:solid black 1.0pt;\r\n  mso-border-left-alt:solid black .75pt;mso-border-alt:solid black .75pt;\r\n  mso-border-bottom-alt:solid black 1.5pt;background:#CCFFFF;padding:0cm 0cm 0cm 0cm;\r\n  height:23.95pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"width:61.2pt;border-top:solid black 1.0pt;\r\n  border-left:none;border-bottom:solid black 1.5pt;border-right:solid black 1.0pt;\r\n  mso-border-left-alt:solid black .75pt;mso-border-alt:solid black .75pt;\r\n  mso-border-bottom-alt:solid black 1.5pt;background:#CCFFFF;padding:0cm 0cm 0cm 0cm;\r\n  height:23.95pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" align=\"center\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"width: 36.5854%; border-top: 1pt solid black; border-left: none; border-bottom: 1.5pt solid black; border-right: 1pt solid black; background: rgb(204, 255, 255); padding: 0cm; height: 23.95pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"mso-bidi-font-weight:normal\"><span lang=\"EN-US\" [removed]=\"letter-spacing:-.05pt\" wfd-id=\"1638\">volumes<\/span><\/span><\/b><\/p>\r\n  <\/td>\r\n  <td width=\"160\" valign=\"top\" [removed]=\"text-indent: -16.3pt; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif; text-align: center;\"><b [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;color:black;mso-color-alt:windowtext;\r\n  letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1636\">Design Flow<\/span><\/b><b [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  Calibri;color:black;mso-color-alt:windowtext;letter-spacing:-.05pt;\r\n  mso-ansi-language:EN-US\" wfd-id=\"1635\">Rate<\/span><\/b><\/p>\r\n  <\/td>\r\n <\/tr>\r\n <tr [removed]=\"width:69.5pt;border:solid black 1.0pt;\r\n  border-top:none;mso-border-top-alt:solid black 1.5pt;mso-border-top-alt:1.5pt;\r\n  mso-border-left-alt:.25pt;mso-border-bottom-alt:.75pt;mso-border-right-alt:\r\n  .75pt;mso-border-color-alt:black;mso-border-style-alt:solid;padding:0cm 0cm 0cm 0cm;\r\n  height:25.5pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1634\">Gasoline<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"80\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width:61.2pt;border-top:none;border-left:none;\r\n  border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;mso-border-top-alt:\r\n  solid black 1.5pt;mso-border-left-alt:solid black .75pt;mso-border-alt:solid black .75pt;\r\n  mso-border-top-alt:solid black 1.5pt;padding:0cm 0cm 0cm 0cm;height:25.5pt;\r\n  mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1632\">Moyale<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"173\" valign=\"top\" [removed]=\"text-indent: 13.9pt; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"MS Gothic\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1630\">A\u2014<\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1629\">5<\/span><\/span><span lang=\"EN-US\" [removed]=\"mso-spacerun:yes\" wfd-id=\"1627\">\u00a0<\/span><span [removed]=\"mso-spacerun:yes\" wfd-id=\"1626\">\u00a0<\/span><\/span><\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1623\">3<\/span>\/yr<\/span><span lang=\"EN-US\" [removed]=\"width: 28.1707%; border-top: none; border-left: none; border-bottom: 1pt solid black; border-right: 1pt solid black; padding: 0cm; height: 25.5pt;\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;\r\n  font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\"Times New Roman\";\r\n  mso-ansi-language:EN-US\" wfd-id=\"1620\">\u00a0<\/span><\/p>\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"Times New Roman\";mso-ansi-language:EN-US\" wfd-id=\"1619\">\u00a0<\/span><\/p>\r\n  <p class=\"MsoNormal\" align=\"center\" [removed]=\"font-size:12.0pt;font-family:\"MS Gothic\";mso-ascii-font-family:\"Calibri Light\";\r\n  mso-hansi-font-family:\"Calibri Light\";mso-bidi-font-family:\"Calibri Light\";\r\n  mso-ansi-language:EN-US\" wfd-id=\"1618\">?<\/span><\/p>\r\n  <\/td>\r\n <\/tr>\r\n <tr [removed]=\"width:69.5pt;border:solid black 1.0pt;\r\n  border-top:none;mso-border-top-alt:solid black .75pt;mso-border-alt:solid black .75pt;\r\n  mso-border-left-alt:solid black .25pt;padding:0cm 0cm 0cm 0cm;height:24.95pt;\r\n  mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1617\">Kerosene<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"80\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width:61.2pt;border-top:none;border-left:none;\r\n  border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;mso-border-top-alt:\r\n  solid black .75pt;mso-border-left-alt:solid black .75pt;mso-border-alt:solid black .75pt;\r\n  padding:0cm 0cm 0cm 0cm;height:24.95pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1615\">Moyale<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"173\" valign=\"top\" [removed]=\"text-indent: 16.6pt; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"MS Gothic\";letter-spacing:-.1pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1613\">A\u2014<\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1612\">5<\/span><\/span><span lang=\"EN-US\" [removed]=\"mso-spacerun:yes\" wfd-id=\"1610\">\u00a0<\/span><span [removed]=\"mso-spacerun:yes\" wfd-id=\"1609\">\u00a0<\/span><\/span><\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1606\">3<\/span>\/yr<\/span><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1603\">15,700bbl\/day)<\/span><\/p>\r\n  <\/td>\r\n <\/tr>\r\n <tr [removed]=\"width:69.5pt;border:solid black 1.0pt;\r\n  border-top:none;mso-border-top-alt:solid black .75pt;mso-border-alt:solid black .75pt;\r\n  mso-border-left-alt:solid black .25pt;padding:0cm 0cm 0cm 0cm;height:24.95pt;\r\n  mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" align=\"center\" [removed]=\"font-size:\r\n  12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:Calibri;\r\n  letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1602\">Diesel<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"80\" valign=\"top\" [removed]=\"margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"width:61.2pt;border-top:none;border-left:none;\r\n  border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;mso-border-top-alt:\r\n  solid black .75pt;mso-border-left-alt:solid black .75pt;mso-border-alt:solid black .75pt;\r\n  padding:0cm 0cm 0cm 0cm;height:24.95pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1600\">Moyale<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"173\" valign=\"top\" [removed]=\"text-indent: 16.4pt; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"MS Gothic\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1598\">A\u2014<\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1597\">6<\/span><\/span><span lang=\"EN-US\" [removed]=\"mso-spacerun:yes\" wfd-id=\"1595\">\u00a0<\/span><span [removed]=\"mso-spacerun:yes\" wfd-id=\"1594\">\u00a0<\/span><\/span><\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1591\">3<\/span>\/yr<\/span><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1588\">36,700bbl\/day)<\/span><\/p>\r\n  <\/td>\r\n <\/tr>\r\n <tr [removed]=\"width:190.65pt;border:solid black 1.0pt;\r\n  border-top:none;mso-border-top-alt:solid black .75pt;mso-border-top-alt:.75pt;\r\n  mso-border-left-alt:.25pt;mso-border-bottom-alt:.5pt;mso-border-right-alt:\r\n  .75pt;mso-border-color-alt:black;mso-border-style-alt:solid;padding:0cm 0cm 0cm 0cm;\r\n  height:24.9pt;mso-height-rule:exactly\">\r\n  <p class=\"MsoNormal\" align=\"center\" [removed]=\"font-size:\r\n  12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:Calibri;\r\n  letter-spacing:-.2pt;mso-ansi-language:EN-US\" wfd-id=\"1587\">Total<\/span><span lang=\"EN-US\" [removed]=\"letter-spacing:1.6pt\" wfd-id=\"1586\">volumes<\/span><\/span><\/p>\r\n  <\/td>\r\n  <td width=\"173\" valign=\"top\" [removed]=\"text-indent: 16.4pt; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:\"MS Gothic\";letter-spacing:-.05pt;mso-ansi-language:\r\n  EN-US\" wfd-id=\"1583\">A\u2014<\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1582\">6<\/span><\/span><span lang=\"EN-US\" [removed]=\"mso-spacerun:yes\" wfd-id=\"1580\">\u00a0<\/span><span [removed]=\"mso-spacerun:yes\" wfd-id=\"1579\">\u00a0<\/span><\/span><\/span><span lang=\"EN-US\" [removed]=\"position:relative;top:-4.5pt;mso-text-raise:4.5pt\" wfd-id=\"1576\">3<\/span>\/yr<\/span><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;mso-fareast-font-family:\r\n  \"Times New Roman\";letter-spacing:-.05pt;mso-ansi-language:EN-US\" wfd-id=\"1573\">57,700bbl\/day)<\/span><\/p>\r\n  <\/td>\r\n  <td width=\"160\" valign=\"top\" [removed]=\"text-indent: 9.15pt; margin: 0cm 0cm 8pt; line-height: 107%; font-size: 11pt; font-family: Calibri, sans-serif;\"><span lang=\"EN-US\" [removed]=\"font-size:12.0pt;font-family:\"Calibri Light\",sans-serif;\r\n  mso-fareast-font-family:Calibri;mso-ansi-language:EN-US\" wfd-id=\"1568\"> <span [removed]=\"position:relative;top:-4.5pt;\r\n  mso-text-raise:4.5pt\" wfd-id=\"1571\">3<\/span>\/hr<\/span><span [removed] wfd-id=\"1569\">(Approx.58%)<\/span><\/span><\/p>\r\n  <\/td>\r\n <\/tr>\r\n<\/tbody><\/table>\r\n\r\n\r\n\r\n\r\n<\/p>\r\n\r\n\r\n\r\n\r\n","programme_name":"Intergovernmental Authority on Development (IGAD)","countries":"Kenya, Ethiopia","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":3072,"project_name":"Development of Ports and Maritime Transport on Lake Victoria","pida_code":"BIP_LVBC_002","lat":-0.99631499999999995065280700146104209125041961669921875,"lng":33.0227000000000003865352482534945011138916015625,"zoom_level":"10","sector_name":"Transport","subsector_name":"Inland Port & Waterway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"700.00","preparation_cost":"0.00","summary":"The project will deliver:  \r\n\r\n(i)\tReduced transport costs for landlocked EAC states (Uganda, Rwanda, Burundi) and neighbouring countries like DRC, by shifting  cargo from long road hauls to lake shipping.\r\n(ii)\tImproved lake transport operations - more reliable schedules, safer routes, better intermodal links (road\/rail\/port).\r\n(iii)\tIncreased investment in:\r\n      - port and maritime infrastructure,\r\n      - modern cargo and passenger vessels,\r\n      - tourism and water sports around the lake.\r\n(iv)\tA safer navigation and security environment (fewer accidents, better emergency response).","description":"The project will deliver:  \r\n\r\n(i)\tReduced transport costs for landlocked EAC states (Uganda, Rwanda, Burundi) and neighbouring countries like DRC, by shifting  cargo from long road hauls to lake shipping.\r\n(ii)\tImproved lake transport operations - more reliable schedules, safer routes, better intermodal links (road\/rail\/port).\r\n(iii)\tIncreased investment in:\r\n      - port and maritime infrastructure,\r\n      - modern cargo and passenger vessels,\r\n      - tourism and water sports around the lake.\r\n(iv)\tA safer navigation and security environment (fewer accidents, better emergency response).\r\n\r\nPort rehabilitation and construction will include: \r\n- Rehabilitation and expansion of Kisumu Port \r\n- Construction of Bukasa Inland Port near Kampala; \r\n- Upgrades in Mwanza, Bukoba, Musoma;","programme_name":"Nile River Basin Investment Program (NR-BIP)","countries":"Uganda, Tanzania, Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":917,"project_name":"Eldoret - Nadapal Road","pida_code":"T.10.02.02","lat":2.4609600000000000363797880709171295166015625,"lng":34.9677999999999968849806464277207851409912109375,"zoom_level":"5","sector_name":"Transport","subsector_name":"Road","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"683.00","preparation_cost":"68.00","summary":"Upgrading of 640 km of single carriageway road from Eldoret to Nadapal (Kenya).","description":"The project involves the upgrading of the 640 km road from Eldoret to Nadapal, the border with South Sudan.","programme_name":"Intergovernmental Authority on Development (IGAD)","countries":"Kenya, South Sudan","latest_stage":"Construction","images":[],"has_geometry":true},{"id":3114,"project_name":"Dawa River Multi-purpose Dam","pida_code":"W.30.06","lat":3.850000000000000088817841970012523233890533447265625,"lng":40.9500000000000028421709430404007434844970703125,"zoom_level":"6","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"603.50","preparation_cost":"12.00","summary":"The Dawa River Multipurpose Dam is proposed approximately 20 km upstream of Rhamu Dimtu on the Ethiopia-Kenya border area, with Somalia included as a basin country. The concept combines irrigation, an estimated 8.2 MW of hydropower, flood mitigation, drinking and livestock water, fisheries and dry-season storage.","description":"The project proposes a multipurpose dam on the Dawa River approximately 20 km upstream of Rhamu Dimtu in Kenya and near Boni in Ethiopia. Current PIDA specifications indicate an estimated dam height of about 90 metres, reservoir capacity of approximately 4.5 billion cubic metres and potential hydropower generation of 8.2 MW. The stored water would support irrigation, flood control, domestic and livestock water supply, fisheries and improved dry-season water availability across the transboundary basin.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"Somalia, Kenya, Ethiopia","latest_stage":"Project Definition","images":[],"has_geometry":false},{"id":2522,"project_name":"Nandi Forest Multipurpose Water resources development project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"603.30","preparation_cost":"0.00","summary":"<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;line-height:115%;font-family:\r\n\"Times New Roman\",serif;color:red\">Project is located in Western Kenya and was\r\nidentified and prepared under the Mara River Basin Project. Project\r\ninterventions include construction of a water supply system providing 43,000 m<sup>3<\/sup>\/day\r\nof treated water; development of irrigation command area of 7,000 ha, and\r\nhydropower generation capacity of 50 MW.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;line-height:115%;font-family:\r\n\"Times New Roman\",serif;color:red\">The Nandi Forest dam site was identified as\r\na hydropower and irrigation dam site during the Study on the National Water\r\nMaster Plan (JICA, 1992) and the Study of Integrated Regional development\r\nMaster Plan for the Lake Basin Development Area (1987). The two alternative\r\nsites are situated immediately downstream of the confluence of the Kimondi and\r\nMokong Rivers on the mainstream of the Yala River. A feasibility study was\r\ncompleted in November 2010 and more recently the Environmental and Social\r\nImpact Assessment report was completed in January 2011. The project includes a\r\ntransfer of water out of the basin to the adjacent Great Oroba River where\r\npower is generated and the discharged water stored in another dam for\r\nirrigation of sugar cane. The project also includes a major potable water\r\nsupply component to beneficiaries both within and outside the basin, fisheries\r\nand aquaculture, tourism and recreation. This study envisages the addition of\r\nwatershed management and agro-processing components. Nandi Forest Dam has been\r\ndesigned as a Roller-Compacted Concrete (RCC) dam, with a total top length of\r\n1,509 m and a maximum height of about 63 m; its related reservoir has a\r\ncapacity of about 230 Mm\u00b3.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;line-height:115%;font-family:\r\n\"Times New Roman\",serif;color:red\">The irrigation infrastructure will\r\nfacilitate the irrigation of an area of about 7,000 ha, which is at present\r\nmainly dedicated to small holder agriculture. A water supply system has been\r\ndesigned for drinking water supply to Kaimosi, Kobujoi, Chavakali, Mbele,\r\nMajengo and Kisumu. It is constituted by three pipes of 450 to 800 mm diameter.\r\nInstalled capacity is 15.36 MW.<\/span><\/p>","description":"<p><span>The Nandi Forest dam site was identified as\r\na hydropower and irrigation dam site during the Study on the National Water\r\nMaster Plan (JICA, 1992) and the Study of Integrated Regional development\r\nMaster Plan for the Lake Basin Development Area (1987). The two alternative\r\nsites are situated immediately downstream of the confluence of the Kimondi and\r\nMokong Rivers on the mainstream of the Yala River. A feasibility study was\r\ncompleted in November 2010 and more recently the Environmental and Social\r\nImpact Assessment report was completed in January 2011. The project includes a\r\ntransfer of water out of the basin to the adjacent Great Oroba River where\r\npower is generated and the discharged water stored in another dam for\r\nirrigation of sugar cane. The project also includes a major potable water\r\nsupply component to beneficiaries both within and outside the basin, fisheries\r\nand aquaculture, tourism and recreation. This study envisages the addition of\r\nwatershed management and agro-processing components. Nandi Forest Dam has been\r\ndesigned as a Roller-Compacted Concrete (RCC) dam, with a total top length of\r\n1,509 m and a maximum height of about 63 m; its related reservoir has a\r\ncapacity of about 230 Mm\u00b3.<\/span><\/p>\r\n<p><span>The irrigation infrastructure will\r\nfacilitate the irrigation of an area of about 7,000 ha, which is at present\r\nmainly dedicated to small holder agriculture. A water supply system has been\r\ndesigned for drinking water supply to Kaimosi, Kobujoi, Chavakali, Mbele,\r\nMajengo and Kisumu. It is constituted by three pipes of 450 to 800 mm diameter.\r\nInstalled capacity is 15.36 MW.<\/span><\/p><br>","programme_name":null,"countries":"Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":3102,"project_name":"Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre","pida_code":"I.02.30.05","lat":-4.0434999999999998721023075631819665431976318359375,"lng":39.6681999999999987949195201508700847625732421875,"zoom_level":"6","sector_name":"ICT","subsector_name":"Data Centers","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"530.00","preparation_cost":"0.00","summary":"The Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre is a strategic multi-country ICT infrastructure project advancing through a Public-Private Partnership (PPP) model under PIDA PAP 2. The project is coordinated by EAC and IGAD and is institutionally anchored in the IGAD Regional Infrastructure Masterplan (IRIMP). As of 2024, the project remained at the Project Structuring stage (S3A), with PPP transaction advisory ongoing. A significant enabling development occurred in September 2024, when EAC and IGAD formally commenced implementation of the Eastern Africa Regional Digital Integration Project (EARDIP) - a complementary World Bank-funded initiative (US$15 million grant to EAC Secretariat) covering Ethiopia, Somalia, South Sudan, EAC, and IGAD, aimed at advancing digital market integration across Eastern Africa. A joint EARDIP Implementation Support Mission was held in Nairobi in September 2025, bringing together EAC, IGAD, and the World Bank to assess progress and address implementation challenges. A landmark enabling milestone for the Smart Hub corridor was achieved on July 18, 2025, with the official launch of a 130 km cross-border terrestrial fibre link connecting Dar es Salaam (Tanzania) to Mombasa (Kenya) at the Lunga Lunga\/Horohoro border, implemented by TTCL and Kenya's ICTA, operating at 1.6 Tbps. This link connects Tanzania's NICTBB to Kenya's eight submarine cable landings in Mombasa, directly enabling the Smart Hub corridor. The project was highlighted as a notable initiative at the 8th PIDA Week in November 2024.","description":"The Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre is a multi-country ICT infrastructure project under the PIDA Priority Action Plan 2 (PAP 2) 2021-2030. The project aims to interconnect Kenya and its neighbouring countries - Ethiopia, Somalia, South Sudan, Uganda, and Tanzania - by relaying Kenya's terrestrial fibre network connecting the submarine cables arriving at Mombasa to their borders through strategically placed Points-of-Presence (PoPs) and a high-capacity Smart Hub Data Centre. The project is coordinated through the East African Community (EAC) and the Intergovernmental Authority on Development (IGAD), and is aligned with Kenya Vision 2030, the ICT Infrastructure Masterplan, the Smart Africa and Digital Economy Blueprint, and the IGAD Regional Infrastructure Masterplan (IRIMP). It is structured as a Public-Private Partnership (PPP) and is considered a flagship project for regional digital integration under AU Agenda 2063. The project is complemented by the World Bank-funded Eastern Africa Regional Digital Integration Project (EARDIP), which supports EAC and IGAD as conduits of digital integration across Eastern Africa, covering Ethiopia, Somalia, South Sudan, and the two RECs in Phase I. A key enabling milestone was the official launch on July 18, 2025, of a 130 km cross-border terrestrial fibre link connecting Dar es Salaam (Tanzania) to Mombasa (Kenya) at the Lunga Lunga\/Horohoro border, implemented by Tanzania Telecommunications Corporation (TTCL) and Kenya's ICT Authority (ICTA), operating at 1.6 Tbps and providing Tanzania access to Kenya's eight submarine cable landings.\r\n\r\nKenya already has several sub-marine fibers landing in Mombasa and has already done terrestrial fiber connecting the sub-marine cable to the borders of the other partner countries (Busia border for Uganda, Mandera border for Somalia, Moyale border for Ethiopia, Nadapal border for South Sudan, Lunga-Lunga, Namanga and Holili border for Tanzania). The inter-connectivity infrastructure at the border points comprising 400 Gbps PoPs and Smart Hub data centre in Mombasa are lacking.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"Uganda, Tanzania, South Sudan, Somalia, Kenya, Ethiopia","latest_stage":"Project Structuring","images":[],"has_geometry":true},{"id":2517,"project_name":"Gogo Falls Multipurpose Water Resources Development Project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"523.70","preparation_cost":"0.00","summary":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">This Project is\r\nlocated in Western Kenya and was identified and prepared under the Mara River\r\nBasin Project. Project interventions include construction of water supply\r\nsystem with capacity to supply 86,400 m<sup>3<\/sup>\/day of treated water and\r\nincluding construction of a 155 MCM storage reservoir; hydropower generation\r\ncapacity of 20 MW; and development of an irrigation command area of 30,000 ha.\r\nThe project is expected to benefit 1.15 million people.<\/span><\/p>\r\n\r\n\r\n\r\n\r\n","description":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">The Project is\r\nlocated in Western Kenya and was identified and prepared under the Mara River\r\nBasin Project. Project interventions include construction of water supply\r\nsystem with capacity to supply 86,400 m<sup>3<\/sup>\/day of treated water and\r\nincluding construction of a 155 MCM storage reservoir; hydropower generation\r\ncapacity of 20 MW; and development of an irrigation command area of 30,000 ha.\r\nThe project is expected to benefit 1.15 million people.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"miter\">\r\n <v:formulas>\r\n  <v:f eqn=\"if lineDrawn pixelLineWidth 0\">\r\n  <v:f eqn=\"sum @0 1 0\">\r\n  <v:f eqn=\"sum 0 0 @1\">\r\n  <v:f eqn=\"prod @2 1 2\">\r\n  <v:f eqn=\"prod @3 21600 pixelWidth\">\r\n  <v:f eqn=\"prod @3 21600 pixelHeight\">\r\n  <v:f eqn=\"sum @0 0 1\">\r\n  <v:f eqn=\"prod @6 1 2\">\r\n  <v:f eqn=\"prod @7 21600 pixelWidth\">\r\n  <v:f eqn=\"sum @8 21600 0\">\r\n  <v:f eqn=\"prod @7 21600 pixelHeight\">\r\n  <v:f eqn=\"sum @10 21600 0\">\r\n <\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:formulas>\r\n <v:path o:extrusionok=\"f\" gradientshapeok=\"t\" o:connecttype=\"rect\">\r\n <o:lock v:ext=\"edit\" aspectratio=\"t\">\r\n<\/o:lock><\/v:path><\/v:stroke><\/v:shapetype><v:shape id=\"Picture_x0020_220\" o:spid=\"_x0000_s1026\" type=\"#_x0000_t75\" [removed]:square;mso-width-percent:0;mso-height-percent:0;\r\n mso-wrap-distance-left:9pt;mso-wrap-distance-top:0;mso-wrap-distance-right:9pt;\r\n mso-wrap-distance-bottom:0;mso-position-horizontal:absolute;\r\n mso-position-horizontal-relative:text;mso-position-vertical:absolute;\r\n mso-position-vertical-relative:text;mso-width-percent:0;mso-height-percent:0;\r\n mso-width-relative:page;mso-height-relative:page\">\r\n <v:imagedata src=\"file:\/\/\/C:\\\\Users\\\\user\\\\AppData\\\\Local\\\\Temp\\\\msohtmlclip1\\\\01\\\\clip_image001.jpg\" o:title=\"\">\r\n <w:wrap type=\"square\">\r\n<\/w:wrap><\/v:imagedata><\/v:shape><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]=\"font-size:8.5pt;line-height:115%;font-family:\"Calibri\",sans-serif;\r\nmso-ascii-theme-font:minor-latin;mso-fareast-font-family:Calibri;mso-fareast-theme-font:\r\nminor-latin;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:\"Times New Roman\";\r\nmso-bidi-theme-font:minor-bidi;color:red;mso-ansi-language:EN-US;mso-fareast-language:\r\nEN-US;mso-bidi-language:AR-SA\">NIB has started development of the Lower Kuja\r\npublic irrigation project, which will used water from the Kuja (lower Gucha)\r\nRiver. The project comprises phased development for up to a gross area of 7,833\r\nha using water directly abstracted from the river using a diversion weir about\r\n5 km downstream of Gogo Falls. The project is at bidding stage with a\r\nfeasibility study completed on an area of 5,800ha with infrastructure proposed\r\nfor a command area of 2,700ha smallholder irrigation. Phase 1 for 700ha (but\r\nincorporating the entire major upstream infrastructure) was advertised by NIB\r\nfor bidding July 2011. The proposal is for gravity surface irrigation from a\r\nweir on the Gucha river not far from the small town of MaCalder in the lower\r\nbasin area and upstream of the confluence with the Migori river. The project is\r\ntherefore starting even without a regulation dam. Size of irrigated area is\r\n20,000ha. Installed capacity is 9.04MW. The estimated investment costs is\r\nUS$523.7 million<\/span><span [removed]\r\nfont-family:\"Calibri\",sans-serif;mso-ascii-theme-font:minor-latin;mso-fareast-font-family:\r\nCalibri;mso-fareast-theme-font:minor-latin;mso-hansi-theme-font:minor-latin;\r\nmso-bidi-font-family:\"Times New Roman\";mso-bidi-theme-font:minor-bidi;\r\nmso-ansi-language:EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA\">.<\/span>\r\n\r\n\r\n","programme_name":null,"countries":"Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":2521,"project_name":"Mushangubo Multipurpose Water resources development project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"468.80","preparation_cost":"0.00","summary":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;line-height:115%;font-family:\r\n\"Times New Roman\",serif;color:red\">Project is located in Western Kenya and was\r\nidentified and prepared under the Mara River Basin Project. Project\r\ninterventions include <\/span><v:shapetype id=\"_x0000_t75\" coordsize=\"21600,21600\" o:spt=\"75\" o:preferrelative=\"t\" path=\"m@4@5l@4@11@9@11@9@5xe\" filled=\"f\" stroked=\"f\">\r\n <v:stroke joinstyle=\"miter\">\r\n <v:formulas>\r\n  <v:f eqn=\"if lineDrawn pixelLineWidth 0\">\r\n  <v:f eqn=\"sum @0 1 0\">\r\n  <v:f eqn=\"sum 0 0 @1\">\r\n  <v:f eqn=\"prod @2 1 2\">\r\n  <v:f eqn=\"prod @3 21600 pixelWidth\">\r\n  <v:f eqn=\"prod @3 21600 pixelHeight\">\r\n  <v:f eqn=\"sum @0 0 1\">\r\n  <v:f eqn=\"prod @6 1 2\">\r\n  <v:f eqn=\"prod @7 21600 pixelWidth\">\r\n  <v:f eqn=\"sum @8 21600 0\">\r\n  <v:f eqn=\"prod @7 21600 pixelHeight\">\r\n  <v:f eqn=\"sum @10 21600 0\">\r\n <\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:formulas>\r\n <v:path o:extrusionok=\"f\" gradientshapeok=\"t\" o:connecttype=\"rect\">\r\n <o:lock v:ext=\"edit\" aspectratio=\"t\">\r\n<\/o:lock><\/v:path><\/v:stroke><\/v:shapetype><v:shape id=\"Picture_x0020_457756\" o:spid=\"_x0000_s1026\" type=\"#_x0000_t75\" [removed]:square;\r\n mso-width-percent:0;mso-height-percent:0;mso-wrap-distance-left:9pt;\r\n mso-wrap-distance-top:0;mso-wrap-distance-right:9pt;\r\n mso-wrap-distance-bottom:0;mso-position-horizontal:absolute;\r\n mso-position-horizontal-relative:text;mso-position-vertical:absolute;\r\n mso-position-vertical-relative:text;mso-width-percent:0;mso-height-percent:0;\r\n mso-width-relative:page;mso-height-relative:page\">\r\n <v:imagedata src=\"file:\/\/\/C:\\\\\\\\Users\\\\\\\\user\\\\\\\\AppData\\\\\\\\Local\\\\\\\\Temp\\\\\\\\msohtmlclip1\\\\\\\\01\\\\\\\\clip_image001.jpg\" o:title=\"\">\r\n <w:wrap type=\"square\">\r\n<\/w:wrap><\/v:imagedata><\/v:shape><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">A 35m high dam\r\nwould store a volume of about 210 Mm3 and inundate an area of 15km2. Installed\r\ncapacity is 5.47 MW. Size of land irrigated is 4000 ha. Investment costs is US$\r\n468.8 millions<\/span><\/p>\r\n\r\n\r\n\r\n\r\n","description":"<p class=\"MsoNormal\" [removed]=\"position:absolute;margin-left:.2pt;margin-top:9.5pt;width:339.45pt;\r\n height:207.75pt;z-index:259765248;visibility:visible;mso-wrap-style:square;\r\n mso-width-percent:0;mso-height-percent:0;mso-wrap-distance-left:9pt;\r\n mso-wrap-distance-top:0;mso-wrap-distance-right:9pt;\r\n mso-wrap-distance-bottom:0;mso-position-horizontal:absolute;\r\n mso-position-horizontal-relative:text;mso-position-vertical:absolute;\r\n mso-position-vertical-relative:text;mso-width-percent:0;mso-height-percent:0;\r\n mso-width-relative:page;mso-height-relative:page\">\r\n <v:imagedata src=\"file:\/\/\/C:\\\\Users\\\\user\\\\AppData\\\\Local\\\\Temp\\\\msohtmlclip1\\\\01\\\\clip_image001.jpg\" o:title=\"\">\r\n <w:wrap type=\"square\">\r\n<\/w:wrap><\/v:imagedata><\/v:shape><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">A 35m high dam\r\nwould store a volume of about 210 Mm3 and inundate an area of 15km2. Installed\r\ncapacity is 5.47 MW. Size of land of 4,000ha.<br><\/span><\/p>","programme_name":null,"countries":"Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":238,"project_name":"Mombasa - Voi Road","pida_code":"T.05.03.06","lat":-3.718080000000000051585402616183273494243621826171875,"lng":39.09360000000000212594386539421975612640380859375,"zoom_level":"5","sector_name":"Transport","subsector_name":"Road","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"455.00","preparation_cost":"2.70","summary":"Upgrading of the road from Mombassa to Voi (Kenya).","description":"<p>This project entails the upgrading of the Mombasa -Voi road to a dual carriageway. An alternative short term solution is to rehabilitate the road and provide climbing lanes along sections where heavy vehicles reach crawl speed as a result of steep gradients.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Kenya","latest_stage":"Project Structuring","images":[],"has_geometry":true},{"id":739,"project_name":"Juba-Torit-Kapoeta-Nadapal Road","pida_code":"T.05.03.12","lat":4.590090000000000003410605131648480892181396484375,"lng":32.997399999999998954081092961132526397705078125,"zoom_level":"7","sector_name":"Transport","subsector_name":"Road","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"420.00","preparation_cost":"40.00","summary":"The Juba\u2013Torit\u2013Kapoeta\u2013Nadapal Road connects Juba with Eastern Equatoria and the Kenyan border. It is intended to improve all-season access, reduce transport costs and strengthen the regional trade corridor between South Sudan and Kenya. The project remains at project-structuring stage, with security, route and financing conditions affecting implementation.","description":"<p>Construction of 365 km Juba-Torit-Kapoeta-Nadapal single cariageway road in South Sudan. The road links with the proposed South Sudan\/Kenya OSBP project at Nadapal.<\/p>\r\n","programme_name":"Intergovernmental Authority on Development (IGAD)","countries":"South Sudan, Kenya","latest_stage":"Project Structuring","images":[],"has_geometry":true},{"id":2516,"project_name":"Namba Kodero Multipurpose Water Resources Development Project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"410.80","preparation_cost":"0.00","summary":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;mso-ascii-font-family:Calibri;mso-fareast-font-family:Calibri;\r\nmso-hansi-font-family:Calibri;mso-bidi-font-family:\"Times New Roman\";\r\ncolor:red\">Namba Kodero site was identified as a multipurpose dam site\r\n(hydropower, irrigation and flood control) dam site during the Study on the\r\nNational Water Master Plan (JICA,1992) and the Study of Integrated Regional\r\ndevelopment Master Plan for the Lake Basin Development Area (1987). The site is\r\nsituated on the Migori River in a relatively remote area approximately 20km\r\nfrom Migori and about 10 km upstream of the confluence with the Gucha. Since\r\nthe identification of the dam site, no further work has been done. The\r\noriginally identified purposes for the dam site were power generation,\r\nirrigation (Lower Kuja project) and flood control. A relatively large dam was\r\nproposed and this has been taken forward in consideration of the development of\r\na multipurpose project.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;mso-ascii-font-family:Calibri;mso-fareast-font-family:Calibri;\r\nmso-hansi-font-family:Calibri;mso-bidi-font-family:\"Times New Roman\";\r\ncolor:red\">Feasibility study allows for supply to 1.5million people @75l\/day.\r\nPopulation to be served 1,728,000 which seems rather high. 1m3\/s has been\r\nassumed to supply 1,152,000 persons. Irrigated area is 12,000ha. Installed\r\ncapacity is 6.41MW. Estimated investment costs is US$410.8 million<\/span><span [removed]\r\nmso-fareast-font-family:Calibri;mso-hansi-font-family:Calibri;mso-bidi-font-family:\r\n\"Times New Roman\"\">.<\/span><\/p>\r\n\r\n\r\n\r\n\r\n","description":"<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;mso-ascii-font-family:Calibri;mso-fareast-font-family:Calibri;\r\nmso-hansi-font-family:Calibri;mso-bidi-font-family:\"Times New Roman\";\r\ncolor:red\">Namba Kodero site was identified as a multipurpose dam site\r\n(hydropower, irrigation and flood control) dam site during the Study on the\r\nNational Water Master Plan (JICA,1992) and the Study of Integrated Regional\r\ndevelopment Master Plan for the Lake Basin Development Area (1987). The site is\r\nsituated on the Migori River in a relatively remote area approximately 20km\r\nfrom Migori and about 10 km upstream of the confluence with the Gucha. Since\r\nthe identification of the dam site, no further work has been done. The\r\noriginally identified purposes for the dam site were power generation,\r\nirrigation (Lower Kuja project) and flood control. A relatively large dam was\r\nproposed and this has been taken forward in consideration of the development of\r\na multipurpose project.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;mso-ascii-font-family:Calibri;mso-fareast-font-family:Calibri;\r\nmso-hansi-font-family:Calibri;mso-bidi-font-family:\"Times New Roman\";\r\ncolor:red\">Feasibility study allows for supply to 1.5million people @75l\/day.\r\nPopulation to be served 1,728,000 which seems rather high. 1m3\/s has been\r\nassumed to supply 1,152,000 persons. Irrigated area is 12,000ha. Installed\r\ncapacity is 6.41MW. Estimated investment costs is US$410.8 million<\/span><span [removed]\r\nmso-fareast-font-family:Calibri;mso-hansi-font-family:Calibri;mso-bidi-font-family:\r\n\"Times New Roman\"\">.<\/span><\/p><br>","programme_name":null,"countries":"Kenya","latest_stage":"Pre-Feasibility","images":[],"has_geometry":false},{"id":2523,"project_name":"Ol-Ngobor Multipurpose Water resources development project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"410.80","preparation_cost":"0.00","summary":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;line-height:115%;font-family:\r\n\"Times New Roman\",serif;color:red\">Project is located in Western Kenya and was\r\nidentified and prepared under the Mara River Basin Project. Project\r\ninterventions include construction of a water supply system providing 36,000 m<sup>3<\/sup>\/day\r\nof treated water; development of irrigation command area of 21,800 ha, and\r\nhydropower generation capacity of 10 MW.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">The Ol Ngobor\r\nDam site was identified as a hydropower dam site during the Study on the\r\nNational Water Master Plan (JICA 1992) and the Study of Integrated Regional\r\ndevelopment Master Plan for the Lake Basin Development Area (1987). The site is\r\nsituated on the Migori River in a remote area approximately 20km from Kilgoris\r\nand about 35 km upstream of Migori. Since the identification of the dam site,\r\nno further work has been done. The project site is situated in an area of low\r\npopulation density largely occupied by nomadic stock farmers. A relatively\r\nlarge dam was proposed and this has been taken forward in consideration of the\r\ndevelopment of a multipurpose project. Irrigated area is 3000ha. Installed\r\ncapacity is 2.76 MW. Estimated investment costs is US$410.8 million.<\/span><\/p>\r\n\r\n\r\n\r\n\r\n","description":"<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;line-height:115%;font-family:\r\n\"Times New Roman\",serif;color:red\">Project is located in Western Kenya and was\r\nidentified and prepared under the Mara River Basin Project. Project\r\ninterventions include construction of a water supply system providing 36,000 m<sup>3<\/sup>\/day\r\nof treated water; development of irrigation command area of 21,800 ha, and\r\nhydropower generation capacity of 10 MW.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">The Ol Ngobor\r\nDam site was identified as a hydropower dam site during the Study on the\r\nNational Water Master Plan (JICA 1992) and the Study of Integrated Regional\r\ndevelopment Master Plan for the Lake Basin Development Area (1987). The site is\r\nsituated on the Migori River in a remote area approximately 20km from Kilgoris\r\nand about 35 km upstream of Migori. Since the identification of the dam site,\r\nno further work has been done. The project site is situated in an area of low\r\npopulation density largely occupied by nomadic stock farmers. A relatively\r\nlarge dam was proposed and this has been taken forward in consideration of the\r\ndevelopment of a multipurpose project. Irrigated area is 3000ha. Installed\r\ncapacity is 2.76 MW. Estimated investment costs is US$410.8 million.<\/span><\/p><br>","programme_name":null,"countries":"Kenya","latest_stage":"Pre-Feasibility","images":[],"has_geometry":false},{"id":2895,"project_name":"Nandi Forest Multipurpose Water resources development project","pida_code":"BIP_NELSAP_014","lat":null,"lng":null,"zoom_level":"10","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"395.50","preparation_cost":"0.00","summary":"","description":"","programme_name":"Nile River Basin Investment Program (NR-BIP)","countries":"Kenya","latest_stage":"Project Structuring","images":[],"has_geometry":false},{"id":2426,"project_name":"Gogo Falls Water resources development (MPP)","pida_code":"BIP_NELSAP_012","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"393.00","preparation_cost":"0.00","summary":"<p><span>This Project is located in Western\r\nKenya. The objective of the project is to harness, conserve, and control and\r\nutilize waters of Kuja River for the socio-economic development of the\r\nsemi-arid Lower Kuja area. The dam is intended to provide flood controls,\r\nirrigation development and hydropower generation. The project includes a 155\r\nMm3 dam, 20MW electricity, 30,000ha of irrigation, up to 86,400m3 \/d water\r\nsupply, benefitting 1.152m people. Detailed feasibility and design studies have\r\nbeen done for this project and it now requires implementation, estimated at USD\r\n393.7m over 3 years, which has been included in NEL-IP.<\/span><\/p><br>","description":"<p><span>This Project is located in Western\r\nKenya.  The dam is intended to provide flood controls,\r\nirrigation development and hydropower generation. The project includes a 155\r\nMm3 dam, 20MW electricity, 30,000ha of irrigation, up to 86,400m3 \/d water\r\nsupply, benefitting 1.152m people. Detailed feasibility and design studies have\r\nbeen done for this project and it now requires implementation, estimated at USD\r\n393.7m over 3 years, which has been included in NEL-IP.<\/span><\/p>","programme_name":"Nile Equatorial Lakes Investment Program-NEL-IP","countries":"Kenya","latest_stage":"Pre-Feasibility","images":[],"has_geometry":false},{"id":2515,"project_name":"Bunyunyu Multipurpose Water Resources Development Project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"260.80","preparation_cost":"0.00","summary":"<p><span>This project,\r\nlocated in Bunyunyu Village, Western Kenya was identified under the Mara River\r\nBasin Project. Project interventions include construction of water supply\r\nsystem with capacity to supply 55,910 m3\/day of treated water; development of\r\nan irrigation command area of 3,000 ha benefiting 9,850 people, and development\r\nof hydropower with 2 MW capacity. The Bunyunyu Dam site is situated\r\napproximately 11 km from Kisii on the mainstream of the Gucha River. The dam is\r\ncurrently being considered by the Lake Victoria South Water Services Board as\r\nan option for the supply of water to Kisii and other towns and villages in the\r\narea.<\/span><\/p>","description":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">This project,\r\nlocated in Bunyunyu Village, Western Kenya was identified under the Mara River\r\nBasin Project. Project interventions include construction of water supply\r\nsystem with capacity to supply 55,910 m3\/day of treated water; development of\r\nan irrigation command area of 3,000 ha benefiting 9,850 people, and development\r\nof hydropower with 2 MW capacity. The Bunyunyu Dam site is situated\r\napproximately 11 km from Kisii on the mainstream of the Gucha River. The dam is\r\ncurrently being considered by the Lake Victoria South Water Services Board as\r\nan option for the supply of water to Kisii and other towns and villages in the\r\narea.<\/span><\/p>\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif;color:red\">\u00a0<\/span><\/p>\r\n\r\n<p class=\"MsoNormal\" [removed]=\"miter\">\r\n <v:formulas>\r\n  <v:f eqn=\"if lineDrawn pixelLineWidth 0\">\r\n  <v:f eqn=\"sum @0 1 0\">\r\n  <v:f eqn=\"sum 0 0 @1\">\r\n  <v:f eqn=\"prod @2 1 2\">\r\n  <v:f eqn=\"prod @3 21600 pixelWidth\">\r\n  <v:f eqn=\"prod @3 21600 pixelHeight\">\r\n  <v:f eqn=\"sum @0 0 1\">\r\n  <v:f eqn=\"prod @6 1 2\">\r\n  <v:f eqn=\"prod @7 21600 pixelWidth\">\r\n  <v:f eqn=\"sum @8 21600 0\">\r\n  <v:f eqn=\"prod @7 21600 pixelHeight\">\r\n  <v:f eqn=\"sum @10 21600 0\">\r\n <\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:formulas>\r\n <v:path o:extrusionok=\"f\" gradientshapeok=\"t\" o:connecttype=\"rect\">\r\n <o:lock v:ext=\"edit\" aspectratio=\"t\">\r\n<\/o:lock><\/v:path><\/v:stroke><\/v:shapetype><v:shape id=\"Picture_x0020_45137\" o:spid=\"_x0000_s1026\" type=\"#_x0000_t75\" [removed]:square;mso-width-percent:0;mso-height-percent:0;\r\n mso-wrap-distance-left:9pt;mso-wrap-distance-top:0;mso-wrap-distance-right:9pt;\r\n mso-wrap-distance-bottom:0;mso-position-horizontal:absolute;\r\n mso-position-horizontal-relative:text;mso-position-vertical:absolute;\r\n mso-position-vertical-relative:text;mso-width-percent:0;mso-height-percent:0;\r\n mso-width-relative:page;mso-height-relative:page\">\r\n <v:imagedata src=\"file:\/\/\/C:\\\\Users\\\\user\\\\AppData\\\\Local\\\\Temp\\\\msohtmlclip1\\\\01\\\\clip_image001.jpg\" o:title=\"\">\r\n <w:wrap type=\"square\">\r\n<\/w:wrap><\/v:imagedata><\/v:shape><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]=\"text-align: justify; margin: 0in 0in 10pt; line-height: 115%; font-size: 11pt; font-family: \"Calibri\", sans-serif;\"><span [removed]=\"font-size:8.5pt;line-height:115%;color:red\"> Irrigated area is 500ha.\r\nInstalled capacity is 0.74MW. Estimated investment costs is US$260.8 million.<\/span><\/p>\r\n\r\n\r\n\r\n\r\n","programme_name":null,"countries":"Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":2060,"project_name":"ZTK Transmission Interconnector (Tanzania section - Iringa to Shinyanga)","pida_code":"E.02.03.01","lat":-6.369369999999999976125764078460633754730224609375,"lng":34.88839999999999719193510827608406543731689453125,"zoom_level":"7","sector_name":"Energy","subsector_name":"Power Interconnector","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"242.00","preparation_cost":"24.00","summary":"<p>Construction of 670 km \/ 400 kV Iringa - Shinyanga section via Dodoma and Singida of the ZTK transmission interconnector on Tanzania side.<\/p>","description":"<p>Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga via Dodoma and Singida.&Acirc;  The&Acirc; design capacity of this section is 2000MW.<\/p>","programme_name":"Eastern Africa Power Pool (EAPP)","countries":"Tanzania, Zambia, Kenya","latest_stage":"Construction","images":[],"has_geometry":false},{"id":2061,"project_name":"ZTK Transmission Interconnector (Tanzania section - Singida to Namanga) ","pida_code":"E.02.03.01","lat":-2.551200000000000134292577058658935129642486572265625,"lng":36.78399999999999891997504164464771747589111328125,"zoom_level":"8","sector_name":"Energy","subsector_name":"Power Interconnector","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"242.00","preparation_cost":"24.00","summary":"The Singida\u2013Namanga component is the northern Tanzanian section of the 400 kV Kenya\u2013Tanzania interconnector within the wider ZTK corridor. It carries electricity toward the Kenyan border, enabling cross-border power exchange and improving grid reliability. The cross-border system was energised in December 2024 and the component is operational.","description":"<p>Construction of a transmission linethat connects the power networks ofTanzania and Kenya. This projectincludes the section of 414km of400kV transmission line from Singidato Namanga via Arusha. The designcapacity is 2,000MW.<\/p>","programme_name":"Eastern Africa Power Pool (EAPP)","countries":"Tanzania, Zambia, Kenya","latest_stage":"Operation","images":[],"has_geometry":false},{"id":718,"project_name":"ZTK Transmission Interconnector (Tanzania section)","pida_code":"E.02.03.01","lat":-5.937870000000000203499439521692693233489990234375,"lng":34.773899999999997589839040301740169525146484375,"zoom_level":"6","sector_name":"Energy","subsector_name":"Power Interconnector","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"242.00","preparation_cost":"24.00","summary":"Construction of 414 km \/ 400 kV section of the ZTK transmission interconnector from Singida (Tanzania) to Namanga (border with Kenya).","description":"<p>Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project initially included the section of 400kV, 1134km bidirectional\u00a0Tanzanian section of the 2,800km ZTK interconnector\u00a0from Kasama in Zambia to Tunduma-Mbeya-Iringa-Singida-Arusha in Tanzania terminating at Isinya in Kenya. The design capacity of the Tanzania section is 2000MW. The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV.<\/p>\r\n\r\n<p>The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Tanzania, Zambia, Kenya","latest_stage":"Tendering","images":[],"has_geometry":true},{"id":490,"project_name":"Nairobi Southern Bypass Upgrading","pida_code":"T.05.03.03","lat":-1.284520000000000106155084722558967769145965576171875,"lng":36.74810000000000087538865045644342899322509765625,"zoom_level":"5","sector_name":"Transport","subsector_name":"Road","status_name":"Completed","stage_name":null,"stage_code":null,"capex_cost":"216.00","preparation_cost":"22.00","summary":"The Nairobi Southern Bypass is a completed road of approximately 29 km linking Mombasa Road with the western side of Nairobi. It diverts through-traffic away from the city centre, reduces congestion and improves access between major national corridors. The bypass is operational.","description":"<p>The project involves the upgrading of 29 km of the Nairobi Southern Bypass road in Kenya.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Kenya","latest_stage":"Operation","images":[],"has_geometry":true},{"id":2054,"project_name":"Rehabilitation of the Voi-Taveta\/Holili branch line","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Transport","subsector_name":"Railway","status_name":null,"stage_name":null,"stage_code":null,"capex_cost":"200.00","preparation_cost":"0.00","summary":"Rehabilitation of the Voi-Taveta - Moshi - Arusha line to link Kenya and Tanzania railway networks","description":"","programme_name":null,"countries":"Kenya, Tanzania","latest_stage":"Project Definition","images":[],"has_geometry":false},{"id":2051,"project_name":"Rehabilitation of Mombasa - Nairobi - Malaba - Kisumu line","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Transport","subsector_name":"Railway","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"164.00","preparation_cost":"0.00","summary":"Rehabilitation of Mombasa - Nairobi - Malaba -  Kisumu line","description":"","programme_name":null,"countries":"Kenya","latest_stage":"Project Definition","images":[],"has_geometry":false},{"id":720,"project_name":"ZTK Transmission Interconnector (Zambia section)","pida_code":"E.02.03.03","lat":-11.154099999999999681676854379475116729736328125,"lng":31.547200000000000130739863379858434200286865234375,"zoom_level":"6","sector_name":"Energy","subsector_name":"Power Interconnector","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"162.00","preparation_cost":"5.00","summary":"<p>Construction of 905 km single circuit bidirectional 330 kV transmission interconnector from Kabwe in Zambia to the Tanzanian border at Nakonde. In Zambia, the component of the ZTK:  Kabwe - Pensulo, 298 km. A second 330 kV line is required in addition to the existing. Pensulo -Mpika, 197 km. A second 330 kV line is required in addition to the existing.  Mpika - Kasama, 197 km. A second 330 kV line is required in addition to the existing.  Kasama -Nakonde, 212 km. Two new 330 kV circuits required Nakonde  ZM\/TZ Border, New 14 km Double circuit 400 kV line required.<\/p>","description":"<p>Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km&Acirc; ZTK interconnector from Kabwe-Pensulo-Nakonde-Kasama in Zambia to Tunduma&Acirc; in Tanzania. The project was envisioned to be implemented in two phases starting with the Kabwe-Pensulo-Kasama-Nakonde&Acirc; section and the second phase would have&Acirc; comprised the Kabwe-Pensulo-Mpika-Kasama section. It will have had a capacity of&Acirc; 500MW, upgradable to 2000MW depending on power demand.<\/p>\r\n<p>The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV. The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.<\/p>","programme_name":"Eastern Africa Power Pool (EAPP)","countries":"Zambia, Tanzania, Kenya","latest_stage":"Data Not Available","images":[],"has_geometry":true},{"id":3110,"project_name":"Angololo Multipurpose Water Resources Development Project","pida_code":"W.30.02","lat":0.463600000000000012079226507921703159809112548828125,"lng":34.2736000000000018417267710901796817779541015625,"zoom_level":"6","sector_name":"Water","subsector_name":"Water Supply","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"137.00","preparation_cost":"0.50","summary":"The Angololo project is a Kenya-Uganda multipurpose water investment on the transboundary Malaba River. It comprises a dam and reservoir, irrigation, potable water supply, flood regulation, fisheries and small hydropower. Preparatory work has been completed and the project is moving through S3A (Project Structuring), including financial mobilisation and implementation arrangements. A Ugandan government development-finance update issued in August 2025 states a construction cost of USD 137 million.","description":"The project will construct a dam of about 30 metres on the Malaba River at the Kenya-Uganda border, creating a reservoir of roughly 31 million cubic metres. The scheme is designed to supply potable water to approximately 270,000 people, irrigate about 4,000 hectares, generate 1.3 MW of hydropower, support fisheries and livestock, regulate floods and droughts, and restore the associated upstream watershed. NELSAP-CU of the Nile Basin Initiative has coordinated the joint preparation process for Kenya and Uganda.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"Uganda, Kenya","latest_stage":"Project Structuring","images":[],"has_geometry":false},{"id":2998,"project_name":"Angololo Multipurpose Water Resources Development Project (Angololo Dam) NELSAP","pida_code":"BIP_NELSAP_018","lat":0.66881000000000001559641304993419907987117767333984375,"lng":34.2725999999999970668795867823064327239990234375,"zoom_level":"10","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"132.00","preparation_cost":"1.50","summary":"<p>In total the Angololo Water Resources Development Project is expected to benefit at least 127,300 people from Tororo, Manafwa, and Namisindwa districts in Eastern Uganda and Busia and Bungoma Counties in Kenya through employment creation, irrigated agriculture, piped water supply, hydropower generation, and livestock and fisheries production. <\/p>","description":"<p>The Angololo Water Resources Development Project (AWDP) is located on the trans-boundary Malaba River that is between Kenya and Uganda and it falls within the Sio-Malaba Malakisi (SMM) River Basin within the Lake Victoria sub basin. The Angololo project was identified by Kenya and Uganda in collaboration with Nile Equatorial Lakes Subsidiary Action Program (NELSAP) through its Sio Malaba Malakisi (SMM) River Basin Management (RBM) project. NELSAP-CU conducted its prefeasibility studies in 2010 with grant financing from the Royal Government of Sweden and the Royal Government of Norway. Following this identification study, the Governments of Kenya and Uganda formally requested NELSAP to integrate it into its pipeline of natural resources projects for further appraising and development. The project was approved during the 18th Nile Equatorial Lakes Council of Ministers (NELCOM) meeting held in Entebbe, Uganda on 13th October 2015 and was included into the African Development Bank (AfDB) pipeline (IOP) for the year 2016 &ndash; 18 to seek possible funding support. NELSAPCU\/NBI was mandated in the signed MOU between Uganda and Kenya to support in mobilization of resources for preparation of the investment project. NELSAPCU approached AfDB Eastern Africa Regional Centre (EARC) for funding to undertake preparation studies. The project studies will consist of the following components: &bull; Feasibility Study, Detailed Design and Preparation of Tender Documents; &bull; Independent Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP) &bull; Stakeholder engagements to validate project study outputs. Once proven economically viable, the project studies will proceed to Detailed Designs (DD), and preparation of tender documents.<\/p>","programme_name":"Intergovernmental Authority on Development (IGAD)","countries":"Uganda, Kenya","latest_stage":"Pre-Feasibility","images":[],"has_geometry":false},{"id":2062,"project_name":"ZTK Transmission Interconnector (Tanzania section -Mbeya to Tunduma) ","pida_code":"E.02.03.01","lat":-8.9093999999999997640998117276467382907867431640625,"lng":33.46079999999999898818714427761733531951904296875,"zoom_level":"7","sector_name":"Energy","subsector_name":"Power Interconnector","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"123.00","preparation_cost":"24.00","summary":"ZTK Transmission Interconnector (Tanzania section -Mbeya to Tunduma) is an electricity-transmission project serving Kenya, Tanzania and Zambia. It seeks to strengthen grid reliability and regional power trade through high-voltage lines, substations and cross-border interconnection facilities. The Mbeya\u2013Tunduma ZTK component is a Tanzanian transmission section toward Zambia. It remained in tendering\/preparation in 2025; progress on other ZTK sections does not prove this section was commissioned.","description":"<p>Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 400kV, 292km Iringa - Kisada - Mbeya transmission line,&Acirc;  122km of 400kV Mbeya - Tunduma transmission line and 4km of 400kV transmission line from Tunduma to Border of Zambia.&Acirc; <\/p>","programme_name":"Eastern Africa Power Pool (EAPP)","countries":"Tanzania, Zambia, Kenya","latest_stage":"Tendering","images":[],"has_geometry":false},{"id":2423,"project_name":"Lake Victoria Water and Sanitation Initiative Phase II (LVWATSAN II)","pida_code":"","lat":null,"lng":null,"zoom_level":"6","sector_name":"Water","subsector_name":"Wastewater treatment & Sanitation","status_name":"Completed","stage_name":null,"stage_code":null,"capex_cost":"110.00","preparation_cost":"5.00","summary":"<p><span>The Lake Victoria Water Supply and Sanitation Programme (LVWATSAN) is a program of the Lake Victoria Basin Commission that contributes\u00a0to poverty\u00a0eradiction and the pollution prevention in the Lake Victoria Basin. Phase I of the programme was supported by UN-HABITAT and\r\nfocused on 10 towns in\u00a0Uganda, Kenya and\r\nTanzania. The Phase II of the Progrmme implemeted water supply, sanitation and hygiene measures in 15 other secondary towsn in Burundi, Kenya, Rwanda, Tanzania and Uganda, with 5 towns targetted in each country. The\r\ninvestment project preparation for the 15 secondary towns of Phasse II was supported by the\r\nAfrican Water Facility (AWF). Investment finance was provided by the African Development Ba<\/span><\/p>\r\n\r\n<span>The program focused on the following components: (i) Development of\r\nsustainable water supply systems; (ii) provision of hygiene and sanitation\r\nfacilities including solid waste management systems and social marketing; (iii)\r\ndrainage improvements; and (iv) town councils and service providers\"\u2122 capacity\r\nbuilding.\u00a0<\/span><span>Once the project was fully implemented, it achieved 85% coverage in\r\nwater supply and 80% coverage in sanitation. It also significantly reduced the\r\namount of waste entering Lake Victoria and hence will improve the lake's\r\necosystem.<\/span>","description":"<p><span>This project involved construction\r\nof water supply and sanitation systems, improving solid waste and storm water\r\nmanagement, improving watershed management, improving urban planning and\r\nbuilding capacity of urban authorities in 15 secondary towns in the Lake\r\nVictoria Basin. <\/span><span>This project intends to meet the Millennium\r\nDevelopment Goals and support secondary urban centers in the Lake Victoria\r\nBasins to contribute to the reversal of the pollution of the lake through\r\nimprovements of sustainable water supply and sanitation infrastructure in 15\r\nsecondary towns within the Lake Victoria Basin.<\/span><\/p>\r\n<span>The selected towns were across East Africa\r\ncountries with Burundi having 3 towns that included: Ngozi, Muyinga and\r\nKayanza. In Kenya, Keroka, Kericho and Isebania were among the towns while in\r\nRwanda, Kayonza, Nyagatare and Nyanza were identified. Tnazania had Geita,\r\nSengerema and Nansio towns added while Uganda had Mayuge, Buwama-Kayabwe-Bukakata\r\nand Ntungamo. The implementation was launched in 2011 with approx. 110 MUSD\r\ngrant funding from the African Water Facility. This component of LVWATSAN was\r\ncalled LVWATSAN Phase II. Africa Development Bank entered into a Contribution\r\nAgreement with UN-HABITAT to offer Technical Assistance and Capacity Building\r\nProgramme. MWAUWASA was delegated to take the role of implementing authority\r\nfor the 3 Tanzanian towns; Geita, Sengerema and Nansio, financed by AfDB.\u00a0\r\nThe water supply has been improved for 784,470 residents of beneficiary towns\r\nacross the Partner States.<\/span><br>","programme_name":null,"countries":"Uganda, Tanzania, Rwanda, Kenya, Burundi","latest_stage":"Operation","images":[],"has_geometry":true},{"id":3059,"project_name":"Horn of Africa Groundwater for Resilience Program II","pida_code":"BIP_IGAD_001","lat":0.09887700000000000655209220212782383896410465240478515625,"lng":-0.370101999999999986545873298382502980530261993408203125,"zoom_level":"10","sector_name":"Water","subsector_name":"Water Aquifier Management","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"100.00","preparation_cost":"10.00","summary":"Lack of quality data and information for decision making in the development and management of groundwater especially in Arid and Semi-Arid (ASAL) borderlands in the Horn of Africa has been a major challenge. This project strives to promote sustainable groundwater use in the two borderland areas  ( Suud and Gedaref) by Strengthening regional information, capacity & collaboration; Compiling knowledge of the aquifer and filling data gaps;  assessing water resources and climate change impacts;  preparing preliminary water infrastructure plans for development and development of  Aquifer Management Plans (AMP)  and Decision Support System (DSS) for each of the project areas that will form the basis for extensive cross-border developments and collaborations.\r\nBy improving the availability of relevant information, policy effectiveness, and regional collaboration, the project empowers these actors to manage resources more sustainably. Scientists, experts, and ultimately the inhabitants of the IGAD region will also indirectly benefit from increased resilience to climate shocks resulting from sustainable groundwater management","description":"Why this Project is Needed Now?\r\nThe project is a timely intervention to strengthen the climate resilience of targeted communities in a region frequently affected by drought. By focusing on sustainable groundwater management, it aims to provide a buffer against climate shocks and improve livelihoods.  The project builds on the achievements of earlier initiatives, such as the HoA-Groundwater Initiative (HoA GWI), to create a consolidated and sustainable institutional framework for managing transboundary aquifers. Phase II project will benefit from lessons learnt from the GW4R project Phase 1.\r\n Anticipated Benefits:\r\nThe project's primary beneficiaries will be decision-makers and groundwater management professionals in regional and national institutions, who will benefit from strengthened capacity, better information, and improved policies. Indirectly, inhabitants of the IGAD region will benefit from more sustainable groundwater management and increased resilience to climate shocks. The investment is justified by its potential to promote peaceful coexistence over shared resources and enhance economic livelihoods.\r\n\r\nRegional and Global Significance:\r\nThe project's focus on transboundary water management aligns with broader regional and global development agendas. By strengthening cooperative frameworks for a vital natural resource, it contributes to regional stability and sustainable development. The project also supports the achievement of SDGs (especially SDG 6), AU Agenda 2063, African Water Policy and Vision 2025, and IGAD and NBI goals.\r\n\r\nAlignment with Nile Basin Investment Program:\r\nThe project should be included in the Nile River Basin Investment Program as it presents a novel approach for transboundary groundwater management that can strengthen livelihoods and climate resilience, offering a model that could be replicated and upscaled across the Nile Basin. Furthermore, it conducts pre-investment activities in key transboundary aquifers located within the Nile Basin, specifically the Sudd Aquifer (shared by Ethiopia and South Sudan) and the Gedaref Aquifer (shared by Ethiopia and Sudan), which are the focus of the current phase of the project.","programme_name":"Intergovernmental Authority on Development (IGAD)","countries":"Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":2055,"project_name":"Rehabilitation of the Kahe - Taveta branch line ","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Transport","subsector_name":"Railway","status_name":null,"stage_name":null,"stage_code":null,"capex_cost":"80.00","preparation_cost":"0.00","summary":"Tanzania:  Rehabilitation of the Kahe - Taveta branch line (17km).\r\nRehabilitation of the Voi-Taveta - Moshi - Arusha line to link Kenya and Tanzania railway networks\r\n \r\n","description":"","programme_name":null,"countries":"Tanzania, Kenya","latest_stage":"Project Definition","images":[],"has_geometry":false},{"id":2537,"project_name":"Sio-Malaba-Malakisi Integrated Watershed Management Project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Watershed Management","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"70.20","preparation_cost":"0.00","summary":"<p><span>Sio-Malaba-Malakisi is a\r\nshared transboundary resource of Kenya and Uganda. The basin consists of the\r\nMalaba-Malakisi catchment, which <\/span><v:shapetype>\r\n <v:stroke>\r\n <v:formulas>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n <\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:formulas>\r\n <v:path>\r\n <o:lock>\r\n<\/o:lock><\/v:path><\/v:stroke><\/v:shapetype><v:shape>\r\n <v:imagedata src=\"file:\/\/\/C:\\\\\\\\Users\\\\\\\\user\\\\\\\\AppData\\\\\\\\Local\\\\\\\\Temp\\\\\\\\msohtmlclip1\\\\\\\\01\\\\\\\\clip_image001.jpg\">\r\n <w:wrap>\r\n<\/w:wrap><\/v:imagedata><\/v:shape><span>originates\r\nfrom the southern slope of Mount Elgon and drains towards Lake Kyoga, and the\r\nSio catchment, which originates near Bungoma town and drains into Lake\r\nVictoria. The basin has experienced significant land use changes over the past\r\nyears due to population pressure; as people continue to clear forests and drain\r\nwetlands to create new agricultural land and establish new settlements. The\r\nproposed project will link catchment rehabilitation with improving livelihoods\r\nfor the basin communities. Project interventions will include providing support\r\nto increasing farm production, reducing soil fertility loss, enhancing\r\ncatchment afforestation, increasing public awareness of the environmental\r\nconcerns of the shared ecosystems, and reducing greenhouse gas emissions. <\/span><\/p><br>","description":"<p><span>Sio-Malaba-Malakisi is a\r\nshared transboundary resource of Kenya and Uganda. The basin consists of the\r\nMalaba-Malakisi catchment, which <\/span><v:shapetype>\r\n <v:stroke>\r\n <v:formulas>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n  <v:f>\r\n <\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:f><\/v:formulas>\r\n <v:path>\r\n <o:lock>\r\n<\/o:lock><\/v:path><\/v:stroke><\/v:shapetype><v:shape>\r\n <v:imagedata src=\"file:\/\/\/C:\\\\Users\\\\user\\\\AppData\\\\Local\\\\Temp\\\\msohtmlclip1\\\\01\\\\clip_image001.jpg\">\r\n <w:wrap>\r\n<\/w:wrap><\/v:imagedata><\/v:shape><span>originates\r\nfrom the southern slope of Mount Elgon and drains towards Lake Kyoga, and the\r\nSio catchment, which originates near Bungoma town and drains into Lake\r\nVictoria. The basin has experienced significant land use changes over the past\r\nyears due to population pressure; as people continue to clear forests and drain\r\nwetlands to create new agricultural land and establish new settlements. The\r\nproposed project will link catchment rehabilitation with improving livelihoods\r\nfor the basin communities. Project interventions will include providing support\r\nto increasing farm production, reducing soil fertility loss, enhancing\r\ncatchment afforestation, increasing public awareness of the environmental\r\nconcerns of the shared ecosystems, and reducing greenhouse gas emissions. <\/span><\/p><br>","programme_name":null,"countries":"Uganda, Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":2531,"project_name":"Angololo Multipurpose Water Resources Transboundary Project","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Multi-purpose Reservoir","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"67.00","preparation_cost":"1.50","summary":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif\">Angololo Water Resources\r\nDevelopment Project (AWDP) is located on the transboundary Malaba River shared\r\nby Kenya and Uganda and falls within the Sio-Malaba Malakisi (SMM) River Basin\r\nof the Nile Basin. The project consists of a proposed 30 m high dam with a\r\nreservoir capacity of 43.0 MCM and hydropower generation capacity of 1.75 MW.\r\nThe dam will supply potable water to 20,000 people and irrigate 3,300 hectares\r\n(1,180 ha in Kenya and 2,120 ha in Uganda). The project also includes\r\nrehabilitation of the 430 km<sup>2<\/sup> watershed upstream of the dam. In\r\ntotal the Angololo Water Resources Development Project is expected to benefit\r\nat least 127,300 people from Tororo, Manafwa, and Namisindwa districts in\r\nEastern Uganda and Busia and Bungoma Counties in Kenya through employment\r\ncreation, irrigated agriculture, piped water supply, hydropower generation, and\r\nlivestock and fisheries production.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif\">The Angololo project was\r\nidentified by Kenya and Uganda in collaboration with NELSAP-CU under the Sio\r\nMalaba Malakisi (SMM) River Basin Management (RBM) project. NELSAP-CU conducted\r\nits prefeasibility studies in 2010 with grant financing from the Royal\r\nGovernment of Sweden and the Royal Government of Norway. Feasibility studies\r\n(including detailed designs, ESIA and RAP studies and stakeholder engagement)\r\ncommenced in 2019 with a US$ 1.5 million grant from NEPAD-IPPF and are expected\r\nto reach completion in 2021. <\/span><\/p>\r\n\r\n<p class=\"MsoNormal\" [removed]=\"mso-ascii-font-family:\r\nCalibri;mso-hansi-font-family:Calibri;mso-bidi-font-family:Calibri;color:black\">T<span [removed]>he project is located at\r\ncoordinates 0.693243\u00b0N, 34.306400\u00b0E<\/span><\/span><\/p>\r\n\r\n\r\n\r\n\r\n","description":"<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif\">Angololo Water Resources\r\nDevelopment Project (AWDP) is located on the transboundary Malaba River shared\r\nby Kenya and Uganda and falls within the Sio-Malaba Malakisi (SMM) River Basin\r\nof the Nile Basin. The project consists of a proposed 30 m high dam with a\r\nreservoir capacity of 43.0 MCM and hydropower generation capacity of 1.75 MW.\r\nThe dam will supply potable water to 20,000 people and irrigate 3,300 hectares\r\n(1,180 ha in Kenya and 2,120 ha in Uganda). The project also includes\r\nrehabilitation of the 430 km<sup>2<\/sup> watershed upstream of the dam. In\r\ntotal the Angololo Water Resources Development Project is expected to benefit\r\nat least 127,300 people from Tororo, Manafwa, and Namisindwa districts in\r\nEastern Uganda and Busia and Bungoma Counties in Kenya through employment\r\ncreation, irrigated agriculture, piped water supply, hydropower generation, and\r\nlivestock and fisheries production.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:8.5pt;\r\nline-height:115%;font-family:\"Times New Roman\",serif\">The Angololo project was\r\nidentified by Kenya and Uganda in collaboration with NELSAP-CU under the Sio\r\nMalaba Malakisi (SMM) River Basin Management (RBM) project. NELSAP-CU conducted\r\nits prefeasibility studies in 2010 with grant financing from the Royal\r\nGovernment of Sweden and the Royal Government of Norway. Feasibility studies\r\n(including detailed designs, ESIA and RAP studies and stakeholder engagement)\r\ncommenced in 2019 with a US$ 1.5 million grant from NEPAD-IPPF and are expected\r\nto reach completion in 2021. <\/span><\/p>\r\n\r\n<p class=\"MsoNormal\" [removed]=\"mso-ascii-font-family:\r\nCalibri;mso-hansi-font-family:Calibri;mso-bidi-font-family:Calibri;color:black\">T<span [removed]>he project is located at\r\ncoordinates 0.693243\u00b0N, 34.306400\u00b0E<\/span><\/span><\/p><br>","programme_name":null,"countries":"Uganda, Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":2519,"project_name":"Integrated Transmara and Maasai Mau Forest Management Program","pida_code":"","lat":null,"lng":null,"zoom_level":"3","sector_name":"Water","subsector_name":"Watershed Management","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"62.90","preparation_cost":"0.00","summary":"\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:9.0pt;\r\nmso-bidi-font-size:8.5pt;line-height:115%;font-family:\"Times New Roman\",serif;\r\ncolor:red\">This Project is located in Western Kenya and was identified and\r\nprepared under the Mara River Basin Project. Project interventions include\r\nrehabilitation of water tower forests. An investment project focussing on\r\nintegrated forest management for the Maasai Mau and Trans Mara forest blocks\r\nwithin the Mau Forest Complex was prepared. <\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:9.0pt;\r\nmso-bidi-font-size:8.5pt;line-height:115%;font-family:\"Times New Roman\",serif;\r\ncolor:red\">The investments which are estimated at US$ 62.9 million (over a 10\r\nyear period) include: (i) restoration of Transmara protected forest; (ii)\r\nrehabilitation of the Maasai Mau trust land forest; (iii)<span [removed]>\u00a0 <\/span>consolidation of the tea buffer zone through\r\nbuilding on the successes of the Nyayo Tea Zone Development Corporation in\r\nestablishing buffer zones around the gazetted forest; (iv) improved management\r\npractices on private farmlands; (v) income generation and livelihood\r\nimprovement activities (vi) Institutional capacity development for relevant\r\nstakeholders in the sectors of water, forestry, environment and others.<\/span><\/p>\r\n\r\n\r\n\r\n\r\n","description":"<p class=\"MsoNormal\" [removed]=\"font-size:9.0pt;\r\nmso-bidi-font-size:8.5pt;line-height:115%;font-family:\"Times New Roman\",serif;\r\ncolor:red\">This Project is located in Western Kenya and was identified and\r\nprepared under the Mara River Basin Project. Project interventions include\r\nrehabilitation of water tower forests. An investment project focussing on\r\nintegrated forest management for the Maasai Mau and Trans Mara forest blocks\r\nwithin the Mau Forest Complex was prepared. <\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"MsoNormal\" [removed]=\"font-size:9.0pt;\r\nmso-bidi-font-size:8.5pt;line-height:115%;font-family:\"Times New Roman\",serif;\r\ncolor:red\">The investments which are estimated at US$ 62.9 million (over a 10\r\nyear period) include: (i) restoration of Transmara protected forest; (ii)\r\nrehabilitation of the Maasai Mau trust land forest; (iii)<span [removed]>\u00a0 <\/span>consolidation of the tea buffer zone through\r\nbuilding on the successes of the Nyayo Tea Zone Development Corporation in\r\nestablishing buffer zones around the gazetted forest; (iv) improved management\r\npractices on private farmlands; (v) income generation and livelihood\r\nimprovement activities (vi) Institutional capacity development for relevant\r\nstakeholders in the sectors of water, forestry, environment and others.<\/span><\/p><br>","programme_name":null,"countries":"Kenya","latest_stage":"Feasibility","images":[],"has_geometry":false},{"id":863,"project_name":"Bachuma Gate \u2013 Maji ya Chumvi Road.","pida_code":"T.05.03.07","lat":-3.731809999999999849507048566010780632495880126953125,"lng":39.1632000000000033423930290155112743377685546875,"zoom_level":"5","sector_name":"Transport","subsector_name":"Road","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"61.00","preparation_cost":"6.00","summary":"Upgrading of 53 km of road to dual carriageway from Bachuma Gate to Maji ya Chumvi (Kenya).","description":"<p>Upgrading of 53 km of road to dual carriageway from Bachuma Gate to Maji ya Chumvi (Kenya).<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Kenya","latest_stage":"Construction","images":[],"has_geometry":true},{"id":3107,"project_name":"Extension of National ICT Broadband Backbone (NICTBB) to DRC by construction of optical fibre cable across Lake Tanganyika and point of presences (PoPs) for providing connectivity with DRC","pida_code":"I.02.30.10","lat":-4.87690000000000001278976924368180334568023681640625,"lng":29.626599999999999823785401531495153903961181640625,"zoom_level":"6","sector_name":"ICT","subsector_name":"Fibre Optic Cable","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"56.00","preparation_cost":"4.00","summary":"The Kigoma-Kalemie submarine fiber optic cable is a critical regional infrastructure project under the Programme for Infrastructure Development in Africa (PIDA) PAP 2 (2021-2030). The project is implemented by Tanzania Telecommunications Corporation (TTCL) on behalf of the Government of Tanzania, in partnership with the DRC through the Societe Congolaise de Fibre Optique (SOCOF) and the Societe Congolaise des Postes et Telecommunications (SCPT). As of October 2025, the project is in advanced pre-construction preparation. On April 9, 2025, Tanzania's Prime Minister Kassim Majaliwa confirmed to parliament that the government has begun implementation steps for the 186 km cable. Procurement processes for the cable construction were reported as underway as of early 2025. On October 20, 2025, senior delegations from Tanzania (led by TTCL Director General Moremi Marwa and ICT Infrastructure Director Leo Magomba) and DRC (led by SOCOF Director General Prosper Ghislain Mpeye) met at TTCL headquarters in Dar es Salaam to review final preparations. Construction is targeted to begin in early 2026, pending environmental approval, with full operations targeted for late 2027. The project's estimated cost is between USD 15 million and USD 20 million. A significant parallel development occurred in March 2025 when BCS Group completed a separate 400 km submarine cable within Lake Tanganyika connecting Uvira to Kalemie on the DRC side, which enhances the DRC's internal connectivity readiness. The two countries have committed to quarterly reviews to accelerate timelines and mitigate funding risks. The project is covered by a confidentiality agreement signed in February 2023. Once operational, the cable will connect the DRC to Tanzania's NICTBB and, by extension, to multiple international submarine cable landing stations on Tanzania's coast, dramatically improving bandwidth and reducing costs for eastern DRC.","description":"The project involves the construction of a submarine optical fiber cable across Lake Tanganyika, connecting Kigoma in Tanzania to Kalemie in the Democratic Republic of the Congo (DRC). The cable is 186 km in length and will be deployed at lake depths reaching up to 1,470 meters. It will use G652D standard single-mode optical fiber with an initial capacity of 100 Gbps, expandable to several terabits per second using OTN over DWDM overlay technology. The primary component is the lake-bed cable, which will extend the existing Tanzania National ICT Broadband Backbone (NICTBB) into eastern DRC. The NICTBB, managed by Tanzania Telecommunications Corporation (TTCL) on behalf of the Government of Tanzania, already spans approximately 7,910 km and connects Tanzania to six neighboring countries: Zambia, Malawi, Kenya, Uganda, Rwanda, and Burundi. The project also includes establishing Points of Presence (PoPs) on both sides to facilitate interconnection and service delivery. The cable design incorporates specialized burial techniques and environmental safeguards to address seismic risks along the East African Rift. Joint environmental studies by TTCL and the Societe Congolaise des Postes et Telecommunications (SCPT) are being conducted to ensure compliance with the Ramsar Convention protecting Lake Tanganyika's biodiversity. This infrastructure is critical for digital integration within the East African Community (EAC) and the Economic Community of Central African States (ECCAS), providing a direct, high-capacity link that bypasses challenging overland routes. The project is recognized under the AUDA-NEPAD 2nd PIDA Priority Action Plan (2021-2030) as a key link for digital integration in East and Southern Africa.\r\n\r\nThe government of Tanzania constructed a National ICT Broadband Backbone (NICTBB) connecting all Regions in Tanzania and cross boarder connectivity to Zambia, Malawi, Kenya, Uganda, Rwanda and Burundi. The NICTBB has a total length of 7,910Km. The aim of NICTBB is to provide connectivity to all neighboring countries. Now the government is planning to connect with DRC by construction of optical fiber cable. The ideal of connection is between Kigoma in Tanzania and Kalemie in DRC, where the submarine optical fiber cable will be constructed. To achieve direct cross border link across lake Tanganyika, it will requires understanding of lake Tanganyika's bottom terrain and hydrology, landscape of beach sides, assessment of risks for marine activity and analysis of environmental factors for an in-depth design. The process will need to involve desk study, preliminary system design, route survey then detailed system design, which will determine the requirements for its implementation and operation. However, for generic understanding of requirements, we have identified possible locations of cable landing points along the shores of lake Tanganyika. The direct water distances between the two points is approximate to 150km with 1,470m considered as possible maximum depth of lake Tanganyika. Therefore considering that the cable will need to be layed down at the bottom of the lake, about 200km of submarine OFC could be needed for laying between the two points.","programme_name":"Programme for Infrastructure Development in Africa (PIDA) - PAP 2","countries":"Tanzania, Democratic Republic of Congo, Rwanda, Kenya","latest_stage":"Pre-Feasibility","images":[{"url":"\/uploads\/documents\/3107\/20261008_190605_66eb3aab_Kigoma-Kalemie__1_.png","caption":"Kigoma Kalemie (1)","source":"upload"}],"has_geometry":true},{"id":218,"project_name":"Mombasa Port New Petroleum Facility","pida_code":"T.05.06.02","lat":-4.04347999999999974107822708901949226856231689453125,"lng":39.6681999999999987949195201508700847625732421875,"zoom_level":"5","sector_name":"Transport","subsector_name":"Port","status_name":"Active","stage_name":null,"stage_code":null,"capex_cost":"56.00","preparation_cost":"0.00","summary":"The Mombasa Port New Petroleum Facility supports the import and handling of petroleum products at the Port of Mombasa, including infrastructure associated with Kipevu Oil Terminal. It improves marine unloading, transfer, storage and distribution capacity for Kenya and the wider region. The facility is operational.","description":"<p>The project is designed to meet the need for additional liquid bulk capacity through design of a BOT project for a single buoy point or off shore jetty system.<\/p>\r\n","programme_name":"Programme for Infrastructure Development in Africa (PIDA) PAP 1","countries":"Kenya","latest_stage":"Operation","images":[],"has_geometry":true}]}