Intergovernmental Authority on Development (IGAD) brings together 41 infrastructure projects worth $21.15 B in total investment across 12 countries and 4 regions. To date, 3.5% of capital cost is financed, with 20% of projects already advancing through implementation. The panels below answer the essential questions — what, where, when, who, how and why.
Preferences are saved to this browser only.
| Indicator | Stage | Target | Achieved | Progress | Projects |
|---|
Each country reported at the delivery stage of its projects — a country may appear in several stages, with the number of projects at each.
| Project Name | Code | Sub-Sector | Stage | Status | Countries | Investment |
|---|---|---|---|---|---|---|
| LAPSSET Railway Project | T.RL.26.02 | Railway | S2B | Active | Ethiopia, Kenya, South Sudan, Uganda | $13.51 B |
| LAPSSET Crude Oil Pipeline | E.30.03 | Petroleum/Gas Pipeline | S2B | Active | Kenya, South Sudan | $3.06 B |
| Eldoret - Nadapal Road | T.10.02.02 | Road | S4B | Active | Kenya, South Sudan | $751.0 M |
| Dawa River Multi-purpose Dam | W.30.06 | Multi-purpose Reservoir | S1 | Active | Ethiopia, Kenya, Somalia | $615.5 M |
| Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre | I.02.30.05 | Data Centers | S3A | Active | Ethiopia, Kenya, Somalia, South Sudan, Tanzania, Uganda | $530.0 M |
| Ethiopia - Sudan Transmission Interconnector (Sudan section) | E.02.02.02 | Power Interconnector | S2B | Stall | Ethiopia, Sudan | $699.0 M |
| Juba-Torit-Kapoeta-Nadapal Road | T.05.03.12 | Road | S3A | Active | Kenya, South Sudan | $460.0 M |
| El Fasher-Kabkabiya-El Geneina-Adri Road | T.RD.26.06 | Road | S1 | Active | Chad, Sudan | $262.4 M |
| Angololo Multipurpose Water Resources Development Project (Angololo Dam) NELSAP | BIP_NELSAP_018 | Multi-purpose Reservoir | S2A | Active | Kenya, Uganda | $133.5 M |
| Rihaid El Birdi–Om Dafug Road | T.RD.26.09 | Road | S2B | Active | Central African Republic, Sudan | $102.6 M |
| Horn of Africa Groundwater for Resilience Program II | BIP_IGAD_001 | Water Aquifier Management | S2B | Active | Kenya | $110.0 M |
| Juba - Nairobi Fiber Optic Link | I.02.30.06 | Fibre Optic Cable | S2B | Active | Kenya, South Sudan | $45.0 M |
| GERD (Ethiopia)- Khartoum (Sudan)Transmission Line | E.02.02.01 | Power Interconnector | S3A | Stall | Ethiopia, Sudan | $244.0 M |
| LAPSSET RAILWAY (ETHIOPIA SECTION) | — | Railway | S2A | Active | Ethiopia, Kenya, South Sudan | $8.0 M |
| LAPSSET RAILWAY (South Sudan section) | — | Railway | S2A | Active | Ethiopia, Kenya, South Sudan, Uganda | $8.0 M |
| Strengthening the capacity of IGAD towards enhanced drought resilience in the HoA - SCIDAII | — | Water Aquifier Management | TBC | Completed | Ethiopia, Kenya, Uganda | $4.6 M |
| Bagui-Juba Fibre-optic Link (South Sudan section) | I.02.27.02 | Fibre Optic Cable | S4C | Completed | Central African Republic, South Sudan | — |
| Berbera-Hargeisa-Kalabayd-Togowuchale Road | T.07.03.03 | Road | S4C | Active | Somalia | — |
| Grand Ethiopian Renaissance Dam (GERD) | E.01.01 | Hydro Power Plant | S4C | Active | Egypt, Ethiopia, Sudan | — |
| Kenya-Uganda Petroleum Products Pipeline (Uganda Section) | — | Petroleum/Gas Pipeline | S3A | Active | Kenya, Uganda | $600.0 M |
| LAPSSET Railway Detailed Design | — | Railway | S2A | Active | Ethiopia, Kenya | — |
| Nadapal OSBP | T.05.02.05 | Border Post | S3A | Active | Kenya, South Sudan | — |
| Nubian Sandstone Aquifer System | W.07.01 | Water Aquifier Management | S4A | Active | Chad, Egypt, Libya, Sudan | $5.0 M |
| Nyimur Multipurpose Water Resources Project Studies | — | Multi-purpose Reservoir | S2B | Active | South Sudan, Uganda | — |
| Renk (South Sudan/Sudan) OSBP | T.05.02.06 | Border Post | S1 | Active | South Sudan, Sudan | — |
| Somalia IXP | I.03.20 | Internet Exchange Point | S4C | Active | Somalia | — |
| South Sudan IXP | I.03.22 | Internet Exchange Point | S4B | Active | South Sudan | — |
| Sudan-Eritrea Fibre-optic Link (Sudan section) | I.02.02.01 | Fibre Optic Cable | S1 | Active | Eritrea, Sudan | — |
| TAH6: Ndjamena to Djibouti - Missing Road Links in Sudan | T.01.01.02 | Road | S2A | Active | Sudan | — |
| Dawa Aquifer Feasibility Study | — | Water Aquifier Management | S2B | Active | Ethiopia, Kenya, Somalia | $500 K |
| Juba-Bor-Malakal-Renki-Sudan border Railway | T.05.05.02 | Railway | S1 | Active | South Sudan, Sudan | — |
| Juba-Bor-Malakal-Renki-Sudan border Road | T.05.03.13 | Road | S1 | Active | South Sudan, Sudan | — |
| Juba-Kampala Fibre-optic Link (South Sudan section) | I.02.09.02 | Fibre Optic Cable | S1 | Active | South Sudan, Uganda | — |
| Juba-Nairobi Fibre-optic Link (South Sudan section) | I.02.23.01 | Fibre Optic Cable | S1 | Active | Kenya, South Sudan | — |
| Merti Aquifer Feasibility Study | — | Water Aquifier Management | S0 | Completed | Kenya, Somalia | $400 K |
| Nairobi - Mogadishu Fibre-optic Link (Somalia section) | I.02.03.02 | Fibre Optic Cable | S2A | Active | Kenya, Somalia | — |
| Ndjamena-Khartoum Fibre-optic Link (Sudan section) | I.02.26.02 | Fibre Optic Cable | TBC | Active | Chad, Sudan | — |
| Nothern Basement TBA Feasibility Study | — | Water Aquifier Management | S1 | Active | Ethiopia, Kenya | $500 K |
| Omo Turkana Basin and draft fisheries integrated management plan | — | Water Aquifier Management | S4C | Completed | Ethiopia, Kenya, South Sudan | — |
| Regional pastoral livelihoods project | — | Water Aquifier Management | — | Completed | Ethiopia, Kenya, Uganda | — |
| Shabelle Transboundary Aquiffer Feasibility Study | — | Water Aquifier Management | S2A | Active | Ethiopia, Somalia | $500 K |
Ask anything about Intergovernmental Authority on Development (IGAD)
Share photos, documents, data or insights. Your contribution helps keep this programme's information accurate, transparent and up to date for all stakeholders.
Our team will review your submission and add it to the programme shortly. We appreciate your support.
All contributions are reviewed by the programme management team before being published. We may contact you for clarification. Submissions are usually reviewed within 5 working days.
Your contact details are used only to follow up on your submission and will not be shared publicly.
African Infrastructure Database · IGAD — Intergovernmental Authority on Development (IGAD)
Published Sep 25, 2026 · African Infrastructure Database